Delegated Report - Code - Planning OPW21 0177

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Author	Development Engineer, Laurie Schreck
Development Assessment

APPLICATION DETAILS
Application No.	OPW21/0177
Applicant	Joan Evelyn Chapman
Proposal	Operational Works - Vehicle Crossover
Properly Made Date	15 June 2021
Information Request Date	29 June 2021
Information Response Date	17 August 2021
Decision Due Date	07 October 2021
Report Completed Date	25 August 2021
Report Reviewed By	Mark Lewis

PROPERTY DETAILS
Property Address	5 Oceanmist Ct Noosaville Qld 4566
RP Description	Lot 14 RP 802171
Land Area	835.0000 m²
Existing Use of Land	Residential

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	Low Density Residential
Precinct	Not Applicable
Local Plan Area	Not Applicable
Overlays	Land Subject ot Acid Sulfate Soils – 5m AHD or Below
Assessment Type	Code
PROPOSAL
The application seeks approval for an Operational Works - Vehicle Crossover.
The locality and proposal plan are included below.

Figure 1 – Locality

Figure 2 – Site Plan

site details
Background
This application has been submitted as the width of the proposed crossover widening will slightly exceed the desired maximum width as set out in Councils standard drawing RS-049.
Site Description
The proposed works include widening the existing 3.8m wide (at the kerb) crossover by 1.0m on the eastern side to accommodate ingress and egress from the second garage door located on the eastern boundary. There is currently a 6.7m gap between the crossover for No. 5 and the crossover for No. 3 Oceanmist Ct which can only accommodate a single vehicle for on-street parking. The widening of the crossover will reduce this gap to approx. 5.7m which is still sufficient to accommodate a single vehicle. With nothing changing on the other side of the crossover, there will be no net loss of on-street parking resulting from the crossover widening.
The verge area is relatively flat with the existing crossover grades currently compliant. Conditions have been added to ensure the widening works are undertaken in accordance with current standards.
Surrounding Land Uses

assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
Noosa Plan 2020.
Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Driveways and Parking Code.
cONSULTATION
Referral Agencies
Not applicable.
Internal Council Referrals
Not applicable.
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW21/0177 for an Operational Works - Vehicle Crossover situated at 5 Oceanmist Ct Noosaville Qld 4566 and described as Lot 14 RP 802171, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	OPW21/0177
Street address:	5 Oceanmist Ct Noosaville Qld 4566
Real property description:	Lot 14 RP 802171
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works - Vehicle Crossover
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
-	-	Crossover Widening Plan as submitted by Applicant and as annotated by Council	-
CURRENCY PERIOD
The Currency Period for this development approval lapses if the development has not substantially started by 01 September 2023, unless an application to extend the currency period is approved by Council.
SITE SPECIFIC CONDITIONS
The wing of the existing crossover and the back of kerb must be removed via a saw-cut to allow a neat finish with the new portion of crossover. The kerb must be saw-cut along the invert and the existing crossover and kerb must be dowelled into generally in accordance with Councils standard drawing RS-050.
The verge area adjacent the crossover must be reinstated with topsoil and grass seed or turf providing a level transition between the crossover and verge area.
GENERAL CONDITIONS
Engineering
A condition report consisting of photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting.
The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works.
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
Traffic Management during the construction phase;
Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD); and
Provision for safe pedestrian access across the frontage of the site both.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works.
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
Where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice;
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; and
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
Works within Road Reserves
No removal of street trees is permitted without Council’s prior written approval.
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Driveways
Driveway crossovers must be constructed generally in accordance Council’s Standard Drawings RS-049 and RS-050.
Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established.
The following must be complied with during the construction of the required crossover/driveway:
The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete;
The driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients;
The driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties;
Underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway;
Have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council;
Any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor; and
Any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway
Stormwater Drainage
The constructed driveway must not cause additional ponding on the road formation or the road reserve.
Environment (Erosion and Sediment Control)
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes).
FOLLOWING CONSTRUCTION
A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawing RS-049 and RS-050.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart Inspections Request
Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 8 of 8

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image2.png (image text)]
CNM
deck no
thom tm
©
©
247
degree
tum around boy &

[Attachment: image3.png (image text)]
Zones
Low Density Residential

Il Medium Density Residential
Wl High Density Residential

I Tourist Accommodation

Ml We jor Centre

MB District Centre

Local Centre

Neighbourhood Centre

Low impact Industry

I Medium impact Industry
Recreation and Open Space
I Environmental Management an.
[i community Facilities
Innovation

Rural

Mi Rural Residential

[i community Facilities Label Legend
E Overlay Maps

E Local Government Infrastructure Plan (

E O:her Plan Maps

 

   
 
   

25
158P298783

   
   
     

9
1128P 184087

27 6
148298783, ‘6802171

7
18 1aRP802171,
138298783,

“7
t6sP298783,

16

128298783,

   

3

4 1SRP802171,

1208 106085 f 10
16RPEO2171,

8
2018P 106085 2
6
119sPios08s \ 17RPBOZITA

A 14
Log in to download the original file

Delegated Report - Code - Planning OPW21 0177.docx · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.