Council archive · source document
Geotechnical report_Morrison · 132008.169
@ BRISBANE ™ GOLD COAST @ CABOOLTURE @ SUNSHINE COAST Unit 1/35 Limestone Street Unit 5 / 36 Lawrence Drive Unit 3/42 Aerodrome Road Unit 4/81 Wises Road Darra Qid 4076 Nerang Qid 4211 Caboolture Old 4510 Maroochydore Qld 4558 PO Box 3063 PO Box 2011 Darra Qld 4076 Nerang Qld 4211 MORRISON P: 07 3279 0800 P: 07 8596 1599 P: 07 549.0755 P: O7 8443 9522 GEOTECHNIC F: 07 3279 0955 F: 07 8827 2027 F: 07 5428 2498 F: 07 6479 1633 ABN 51 009 878 899 [email protected] [email protected] [email protected] [email protected] RPEUQ 2241 www.morrisongeo.com.au Maroochydore Ofice Email: [email protected] Job No: ME09/068 Ref: 00558/sir Author: M Rubinic & N Morrison 30" September 2009 Mr Adrian Slinger c/- Tod Consulting Engineers P.O. Box 61 NOOSAVILLE QLD 4566 Attention: Mr Barry George email: [email protected] Dear Sir RE: GEOTECHNICAL INVESTIGATION —- PROPOSED RESIDENTIAL CONSTRUCTION 71 SEAVIEW TERRACE, SUNSHINE BEACH 1.0 INTRODUCTION This report records the results of an investigation of the ground conditions on the site located at the northern end of Seaview Terrace at Sunshine Beach which shares a common boundary with the Noosa National Park. The proposed residence is located on the upper slopes of the allotment, close to the western boundary. It is of two living levels at RL44.0m (AHD) and RL39.5m, with gardens at about these levels outside the living areas and a deck above at RL47.50m to RL50.0m. Access from a Seaview Terrace laneway extension reaches the boundary at about RL50.0m AHD. Benched excavations are proposed below the existing slope to form the building platforms. The investigation aim is to define the ground conditions for the structure support and for the support on the excavation lines. Advice and recommendations relating to the following have been provided in this report:- e Stability of cut banks and retaining wall design parameters e Groundwater depths e Load bearing ability of soils e General earthworks recommendations e Footings — shallow foundations or piling support (piling depth and piling type) according to Australian standard AS 2159 — 1995 Piling Design and installation Drilling and sampling on the site proceeded through 21 to 25" September 2009 with the approval of the owner Mr A Slinger. Reference has been made to a previous soil test, slope stability and footing report conducted by SCG Consulting Engineers. Their report dated 24"" March 2009 [ref No. 19064(S)] refers.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotechnical report_Morrison.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.