@ BRISBANE ™ GOLD COAST @ CABOOLTURE @ SUNSHINE COAST
Unit 1/35 Limestone Street Unit 5 / 36 Lawrence Drive Unit 3/42 Aerodrome Road Unit 4/81 Wises Road

Darra Qid 4076 Nerang Qid 4211 Caboolture Old 4510 Maroochydore Qld 4558

PO Box 3063 PO Box 2011

Darra Qld 4076 Nerang Qld 4211 MORRISON
P: 07 3279 0800 P: 07 8596 1599 P: 07 549.0755 P: O7 8443 9522 GEOTECHNIC
F: 07 3279 0955 F: 07 8827 2027 F: 07 5428 2498 F: 07 6479 1633

ABN 51 009 878 899

[email protected] [email protected] [email protected] [email protected] RPEUQ 2241

www.morrisongeo.com.au

Maroochydore Ofice

Email: [email protected]
Job No: ME09/068

Ref: 00558/sir

Author: M Rubinic & N Morrison

30" September 2009

Mr Adrian Slinger

c/- Tod Consulting Engineers
P.O. Box 61

NOOSAVILLE QLD 4566

Attention: Mr Barry George email: [email protected]
Dear Sir

RE: GEOTECHNICAL INVESTIGATION —- PROPOSED RESIDENTIAL CONSTRUCTION
71 SEAVIEW TERRACE, SUNSHINE BEACH

1.0 INTRODUCTION

This report records the results of an investigation of the ground conditions on the site located
at the northern end of Seaview Terrace at Sunshine Beach which shares a common boundary
with the Noosa National Park.

The proposed residence is located on the upper slopes of the allotment, close to the western
boundary. It is of two living levels at RL44.0m (AHD) and RL39.5m, with gardens at about
these levels outside the living areas and a deck above at RL47.50m to RL50.0m.

Access from a Seaview Terrace laneway extension reaches the boundary at about RL50.0m
AHD. Benched excavations are proposed below the existing slope to form the building
platforms. The investigation aim is to define the ground conditions for the structure support
and for the support on the excavation lines.
Advice and recommendations relating to the following have been provided in this report:-

e Stability of cut banks and retaining wall design parameters

e Groundwater depths

e Load bearing ability of soils

e General earthworks recommendations

e Footings — shallow foundations or piling support (piling depth and piling type)

according to Australian standard AS 2159 — 1995 Piling Design and installation

Drilling and sampling on the site proceeded through 21 to 25" September 2009 with the
approval of the owner Mr A Slinger.

Reference has been made to a previous soil test, slope stability and footing report conducted
by SCG Consulting Engineers. Their report dated 24"" March 2009 [ref No. 19064(S)] refers.

 

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Geotechnical report_Morrison.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.