Skip to the record
The gold standard in government transparency.

Council archive · source document

Geotechnical report_Morrison · 132008.169

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

MORRISON GEOTECHNIC PTY LTD

www.morrisongeo.com.au

@ BRISBANE @ GOLD COAST
Unit 1/35 Limestone Street Unit 5 / 36 Lawrence Drive
PO Box 3063 PO Box 2011
Darra Qld 4076 Nerang Qld 4211
P: 07 3279 0900 P: 07 5596 1599
F: 07 3279 0955 F: 07 5527 2027
brisbanelab@ [email protected] morrisongeo.com.au

@ CABOOLTURE

Unit 3 /42 Aerodrome Road
Caboolture Qld 4510

P: 07 5499 0755
F: 07 5428 2498
[email protected]

mg SUNSHINE COAST

Unit 4/81 Wises Road

Maroochydore Qld 4558

P: 07 5443 9522 MORRISON
F: 07 5479 1633 GEOTECHNIC
maroochydorelab@ ABN 51 009 878 899
morrisongeo.com.au RPEUQ 2241

 

Dynamic Probing Log

 

Dynamic Probe : DP&
Page: 1 of 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Client: Mr Adrian Slinger Test Date: 21st Sept 2009

Job Number: ME09/068 Test Method: Dynamic Probing

Project: Proposed Residence Testing Rig: Dando Terrier

Location: Seaview Terrace, Sunshine Beach Logged By: M.Rubinic

Lot No: No. 71

Date Tested : 21st Sept 2009

Dynamic Probe ID: DP8

Location East 0511328

North 7080459N +7m

Surface Level RL (AHD) [approx 41.4
Depth (m) Blows Depth (m) Blows Depth (m) Blows Depth (m) Blows
0.00-0.10 1 2.00-2.10 5 4.00-4.10 7 6.00-6.10 7
0.10-0.20 1 2.10-2.20 5 4,10-4.20 8 6.10-6.20 8
0,20-0.30 i 2.20-2.30 5 4.20-4.30 8 6.20-6.30 8
0.30-0.40 a 2.30-2.40 5 4.30-4.40 2 6.30-6.40 7
0.40-0.50 ie 2.40-2.50 5 4.40-4.50 8 6.40-6,50 Z
0,50-0.60 1 2.50-2.60 6 4.50-4.60 10 6.50-6.60 9
0.60-0.70 1 2.60-2,70 6 4.60-4.70 a 6,60-6.70 at
0,70-0.80 2 2.70-2.80 6 4.70-4.80 6 6.70-6.80 11
0.80-0.90 2 2,80-2.90 7 4.80-4.90 5 6.80-6.90 10
0.90-1.00 2 2.90-3.00 6 4.90-5.00 4 6.90-7.00 B
1,00-1.10 2 3.00-3.10 7 5,00-5.10 4 7.00-7.10 7
1,10-1.20 3 3,10-3,20 #2 5,10-5.20 4 7.10-7.20 Zz
1,20-1.30 3 3.20-3,30 A. 5.20-5.30 4 7.20-7.30 7
1.30-1.40 2 3.30-3.40 6 5,30-5.40 4 7.30-7.40 8
1.40-1,50 3 3.40-3.50 6 5.40-5.50 6 7.40-7,50 ed
1,.50-1.60 3 3.50-3.60 6 5.50-5.60 6 7.50-7.60 16
1.60-1.70 4 3.60-3.70 6 5,60-5.70 5 7.60-7.70
1,70-1.80 4 3.70-3.80 6 5,70-5.80 6 7.70-7.80
1,80-1.90 4 3.80-3.90 7 5.80-5.90 6 7.80-7.90
1,90-2.00 4 3.90-4.00 Z 5,90-6.00 6 7.90-8.00

Standing Water level:

Comments:
Z

 

 

 

 

 

Authorized By:

Date:

Le
PF. OF

 

NATA

TECHNICAL
COMPETENCE MeMeeR

 

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Geotechnical report_Morrison.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.