Council archive · source document
Geotechnical report_Morrison · 132008.169
Job No. ME09/068 Referring to BH1 and BH2 the SPT ‘N’ value drops off in the yellow sand which appears to relate to the clay fines content. Continuing into the sandstone may have merit for heavy loads where the allowable base resistance increases to 1.5MPa. 3.3.2 Screw Piles Screw piles offer a satisfactory alternative for loads up to 50 tonnes. Specialist contractors will offer a pile type and spiral dimensions for the loadings required. All piles should be hot dipped galvanized and should be drilled to a minimum depth of 7 metres on the lower slopes and 5 metres in the northern part of the site represented by DP4 and DP6. Allowable base resistance may be taken as that applicable for drilled concrete piles as as Q>p = a = 1.0MPa Shaft resistance on the other hand is zero. Ultimate tension or pull out resistance is the mass of a 30 degree tapered cone of sand above the pile spiral base plate based on an average sand density of 17.5kN/m?, 4.0 SLOPE STABILITY The natural cleared slope at 20 to 25 degrees has a Factor of Safety (As ay ) of 1.2 to 1.6 and below the house site with trees remaining of 1.4 to 1.7 and therefore has a very low risk of movement. Heavy rainfall however may cause local over steepening if runoff is concentrated on the slope as all of the sand (dune sand and Teewah sand) is highly erodible. Preferably all storm water runoff should be taken to the natural drainage below the site. 5.0 GROUNDWATER Seepage in the sand will occur after heavy rain but there is no groundwater table as such. In the northern part of the site seepage can be expected at the sand/clay interface represented by test pit TP2 at about RL42.5m, All retaining walls should be well drained with a gravel filter and pipe protected by a geofabric surround, 6.0 LIMITATIONS The use of drilled piles will require inspections at construction to confirm the base and shaft friction and the working load capacity as the dynamic probes did not allow adequate soil identification. Screw piles on the other hand may be approved by meeting the contractor's torque capacity correlation appropriate at the pile working load. Recommendations given in this report are based on information supplied regarding the proposed construction in conjunction with the findings of the investigation. Any change in construction type may require additional testing and/or make recommendations invalid. Ref 00558 — Adrian Slinger MORRISON GEOTECHNIC 71 Seaview Terrace Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotechnical report_Morrison.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.