Original source · versioned page text
sdap-v2-6-state-code-8 (1).pdf
Performance outcomes Acceptable outcomes Response
net benefit for the state or region and no
feasible alternative exists; or
3. coastal protection work or work necessary to
protect coastal resources or coastal
processes.
Table 8.2.3: Operational work which is not assessed by local government
Performance outcomes Acceptable outcomes Response
PO23 Works are located and designed such that they AO23.1 Tidal work is designed and located in Not applicable – no tidal works
continue to operate safely during and following a accordance with the Guideline: Building and
defined storm tide event. engineering standards for tidal works, Department of
Environment and Heritage Protection, 2017.
State Development Assessment Provisions – version 2.6
State code 8: Coastal development and tidal works Page 7 of 7
[OCR of page images]
aCe ae Mele Creu = t=) Acceptable outcomes Response
net benefit for the state or region and no
feasible alternative exists; or
3. coastal protection work or work necessary to
protect coastal resources or coastal
processes.
Table 8.2.3: Operational work which is not assessed by local government
aCe ae Mele Creu = t=) Acceptable outcomes Response
PO23 Works are located and designed such that they
continue to operate safely during and following a
defined storm tide event.
AO23.1 Tidal work is designed and located in
accordance with the Guideline: Building and
engineering standards for tidal works, Department of
Environment and Heritage Protection, 2017.
Not applicable — no tidal works
State Development Assessment Provisions — version 2.6
State code 8: Coastal development and tidal works
Page 7 of 7
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (sdap-v2-6-state-code-8 (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.