07/2399 - MCU - Lot Reconfig & Detached Houses (27) [As Published] · 132007.2399
D ef
IDAS FLOWCHART
For an application involving- + Public notification + — Information request issued
+ IDAS Referral agencies
APPLICATION INFORMATION & REFERRAL STAGE DECISION
STAGE
10 bd. : 10 bds 42 months?
Time frames
Assessment Assessment Assessment
int responds
Application Assessment
lodged & manager gives _ manager gives to assessment manager manager manager
accepted acknowledgment information request a eeides & ssues decision
notice’ lecides
= icati & advises
Applicant refers Concurrence Applicant Concurrence application IDAS referral
vpoteaion maw app! e lon agency responds to agency's respanses agencies of
anol for public ‘0 __ gives: concurrence decision
ane IDAS referral information agency
agencies request
30.b.d. less up to 10 b.d. for
information request
Note: b.d. = business days
4 If the application is for a brofel, the assessment manager must ulso provide the Prostitution
Licensing Authority with a copy of the application and a written notice stating whether the
Public submissions
forwarded to
t_ manat
Assessment
development application is reguired to be subject 10 Code or Impact Assessment, within 10 business manager
days afier receiving the develgpment application. receives
2 Extenstons to this timeframe dre at the assessment manager's discretion. notice of
Notification
a Each applicanon and any supporting material must be kept available for inspection and purchase compliance
from the time the assessment manger receives the application until the end of any appeal period or i
the application is withdrawn or lapses. 3 20 bd. 48b.d? 3 months :
‘ For a submission to be properly made (and attract 34 party appeal rights) the submission must be : ’
received in wring on or before the last day of the notification period.
This period may be extended. NOTIFICATION
6 While the assessment manager may start assessing the application at any time, they may not decide
the application during the first 10 business days afier the day the decision making period STAGE
commences, unless the applicant has given the assessment manager written notice that they do not
intend to take action under Sectron 3.5.9 or 3.5.10.
be
This pertod must not include business days between 20 December and 5 January of the following
_
year, For applications made afler 31March 2007, a 30 6.d. novification period applies instead ofa Disclaimer
15 bd. notification period if the application involves any of the following — This document has been prepared for your information. Whilst DLGPSR believes this information will be of assistance to you, itis
" provided on the bass thal you are responsible for making your own assessment of the information provided DLGPSR expressly
: 3 or more concurrence agencies Tigclaims al Hability (incloding but not limited 10 liability for negligence) for errars or omissions of any kind whatsoever or for any loss
. . - Gacloding direc or indirect losses), damage or other consequences which may aise from your reliance on the motetial contained in tis
All or part of the development is assessable under a planning scheme AND is a eene crhis information in issued on the undertaking that DLGPSR is not, through the issue ofthis information, giving any legal of
prescribed under a regulation other professional service. Readers are encouraged to seck independent advice if they have any cancers about the material cantained in
this document
. The application is for a preliminary approval under IPA 53.1.6
8 Applicant provides ussessment manager with written notice of when the application wus referred.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 34 pages
Page 2
e
IDAS FLOWCHART
For an application involving- + Public notification * — Information request issued
+ IDAS Referral agencies
APPLICATION INFORMATION & REFERRAL STAGE
STAGE
40bd. i tO bas 42 months?
DECISION
STAGE
Time frames 20bd56 > Sbd. +
Application Assessment Assessment Applicant responds Assessment Assessment
lodged & manager gives _ manager gives to assessment manager manager manager
accepted information request assesses & issues decision
7 decides pi notice
- icati advises
Applicant refers Concurrence Applicant Concurrence application IDAS referral
app ie " agency responds to agency's responses agencies of
avaliable for public lo gives concurrence decision
scrutiny? IDAS relerral information agency
agencies
request
i 3 months 10 bd 5 42 months? i 30.b.d. less up to 10 b.d. for
: : information request®
Note: b.d. = business days
'
Uf the application is for a brothel, the assessment manager must also provide the Prostitution Public submissions
Licensing Authority with a copy of the application and a written notice stating whether the forwarded to Assessment
development application is reguired to be subject to Code or impact Assessment, within 10 business i assessment manager‘ 7 manager
days after receiving the development application. receives
32 Extensions to this timeframe dre at the assessment manager's discretion. notice of
Each application and any supporting material must be kept available for inspection and purchase
from the time the assessment manger receives the application until the end of any appeal period or i
the application is withdrawn or lapses. 3 20 bd. 15 bd? 3 months :
compliance
For a submission to be properly made (and attract 3 party appeal rights) the submission must be
received in writing on or before the last day of the notification period.
This pertod may be extended. NOTIFICATION
While the assessment manager may start assessing the application at any time, they muy not decide
the application during the first 10 business days after the day the decision making period ST AGE
conmences, uniess the applicant has given the assessment manager written notice that they do not
intend to takg action under Section 3.5.9 or 3.5.19.
This period must not include business days between 20 December and 5 January of the following —
year. For applications made after 31March 2007, a 30 8.d. notification period applies instead of a Disclaimer
15 bd, notification period if the application involves any of the following— This document has been prepared for your information. Whilst DLGPSR believes this infarmation will be of assistance to you, itis
provided on the basis that you are responsible for making your own assessment of the information provided, DLGPSR expressly
disclaims all liability (including but not limited to liabitity for negfigence) for errors or omissions of any kind whatsoever or for any loss
. . . , including direct or indirect losses), damage or other consequences which may arise from yous reliance on the matetial contained in this
All or part of the development is assessable under u planning scheme AND is document, This information is issued on the undertaking that DLGPSR is not, through the issue of this information, giving any legal or
prescribed under a regulation other professional service. Readers are encouraged to seek independent advice if they have any concerns about the material contained in
: The application is for a preliminary approval under [PA 53.1.6 this document
: 3 or more concurrence agencies
8 Applicunt provides assessment manager with written notice of when the application was referred.
Page 3
NOOSA Checklist - Applications Involving Land hoe Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. ry ee 4..° APPLICATION FORMS ~ 4.1 Form 1 Part A 1.1.1. Ensure that the form is fully completed. J 1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. 1.1.2.1. If there are multipte owners, the consent of each owner is required. 1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required. 1.2 Form1 Part B-O Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [VY] 1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed. CZ) 2; REFERRALINFORMATION 0 J 7 OL Tn 2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. [4] 3. ° ENVIRONMENTALLY RELEVANT ACTIVITIES” = 3.1. Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. 4, ‘ FORM 2 - REQUEST TO CHANGE APPROVAL * . 4.1 Ensure that items 1-28 have been checked and/or completed including information regarding applicant details and owners consent. 5. PLANS me r 5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! ( Works) accompanies the application. In addition ensure that each set is complete. §.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is 7 unbound. 6. “SUPPORTINGINFORMATION” “77 a St a 6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration ( and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. [~] 6.2 ‘In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 7. «FEE? ? aoe ke OTT, OR ae dhe a eat 8 7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees, Ww accompanies the application or has been paid. 7.2. Ensure that the fee which has been paid is recorded on the application form. 4 Receiving Officer eS coca OP BD Dec cetseee Date ....... 224. | TT Having completed this form and accepted the lication, please deliver both to the following IDAS Application Receiving trays:- * Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section. «Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. e Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the Land Development Section. « Inall other circumstances — AOP1's desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. SEP! g:\ant\forms\application checklist.doc
Page 4
21 November, 2007 Chief Executive Officer Noosa Council PO Box 141 TEWANTIN QLD 4565 Dear Sir, NOOSA SPRINGS - DEVELOPMENT APPLICATION (PRECINCT J) An area of land surrounded by the Noosa Springs golf course, in our view, is suitable for a twenty-seven (27) lot residential subdivision. For the purpose of the development application and its associated reports, drawings and other documents it is described as Precinct J. Enclosed for your attention are the following: 1. IDAS Form 1 Development Application (a) Part A - Common details (b) Part D - Material change of use (c) Part F - Reconfiguring a lot (d) Part J - Clearing native vegetation (e) Attachment 1 - Development application (superseded planning scheme) (f) IDAS Assessment Checklist 2. Reports/documents folder (6 sets) 3. Cheque payable to Noosa Council in the sum of $40,835 being the application fee in respect of this matter. The development applications for all stages of Noosa Springs have been assessed against the superseded planning scheme. Development has generally proceeded in accordance with the approved Plan of Development and the expected outcomes it incorporates. As this is the last major development approval in respect of Noosa Springs, we are advised it is appropriate for it to be assessed against the superseded planning scheme. We would be grateful if you would proceed with the assessment of the above development application at your earliest convenience. We look forward to receiving an acknowledgement notice as soon as possible. Of course, if you require any further information at this stage please do not hesitate to contact the writer. Yours sincerely StarCo Developments Pty Ltd Phil Starkey GENERAL MANAGER STARCO DEVELOPMENTS PTY LTD sn 59 010 290 605 Resort Drive, PO Box 1184, Noosa Heads, Queensland 4567 (07) 5440 3333 [@ (07) 5440 3399 [email protected]
Page 5
INTEGRATED PLANNING ACT 1997 Attachment 1, Version 2.0, 4 October 2004 Development application (superseded planning scheme) | ’ ATTACHMENT The completion of Attachment 4 is mandatory where an applicant is: requesting the assessment of a proposal against a superseded planning scheme; or notifying of their intent to carry out development that would have been self-assessable or exempt under a superseded planning scheme. A development application (superseded planning scheme) must be made within 2 years after the day the planning scheme or planning scheme policy creating the superseded planning scheme or policy was adopted. Nature of the application If (a) appties this form is required to be accompanied by Form 1 Part A and any other applicable Part (depending on the nature of the proposal) and the Checklist for determining referrals if appticable. If (b) appties this form is required to be accompanied by Form 1 Part A only. A development application (superseded planning scheme) is an application made only to a local government as the assessment manager in which the applicant requests the application be assessed under a superseded planning scheme. The local government has discretion to agree or het agree with the request. The local government must advise In the acknowledgment Notice whether the application will be assessed under the superseded planning scheme (as requested) or the existing planning scheme. An application for a development application to be assessed against a superseded planning scheme must be made within 2 years from the day the superseded planning scheme was superseded. 1. This application: [XJ (i) requests that the proposal be assessed against the provisions of a superseded planning scheme - also complete Part A and other applicable Parts of Form 1 OR C1 (ii) notifies of the intention to carry out development that would have been self- assessable or exempt under a superseded planning scheme - atso complete Part A only, No other part of Form 1 is required to be completed in this Instance 2. Provide details of the superseded planning scheme: The superseded planning scheme is the "Shire of Noosa Planning Scheme’ in force immediately before it was superseded by the "Noosa Plan" which commenced on 34 February 2006 PLEASE NOTE ATTACHMENT 1 of Form 1 cannot be accepted by the assessment manger unless accompanied by PART A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (applicable to assessment manager) DATE RECEIVED REFERENCE NUMBER/S
Page 6
INTEGRATED PLANNING ACT 1997
Form 1 Development Application
y Common details
Part A, Version 2.4, 29 May 2006
PARY
sh
The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (t) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www. ipa.ald.goyv.au.
Any Information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land
All land the subject of the appication, must be
identified. However, a description of the land is not
fequired in retation to 2 mobile ar temporary
1.
Street address: fncluding house number, street name, suburb/iocality name & postcode) {if applicable)
{ Links Drive, Noosa Springs Drive and Resort Drive, Noosa Heads QLD 4567 |
Environmentaly Relevant Activity (ERA), 2. Name of water body or watercourse, within which the development is proposed: (¢ applicable)
Advice for comoletina G2 - Q2 apples if [ Not applicable ]
development is proposed within a water body or =
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing @3 - Most land can be
idenied by a bt on plan description, These detas [ Lot 3 on $P178323 ]
cape aed tom fe 4 orthrovgh ite 4 The above description is for: @ick applicable box)
However, ifthe land on which the development is _ [XJ (i) the land on which the development is proposed; or
Broposod does nat havo 2 ton lan desert (8. C (ii) the land adjoining the water body or watercourse, within which the development is
watercourse) provide ~ roposed; or
{1) the lot on plan description for the se Propo
adjoining/adjacent tand: or 1 (ili) the water body or watercourse.
© CTOncisdconted (ce nusetonBay, |S. Shop/tenancy number. 6. Storey /level: 7. Total area of tand: (m? or ha):
Medea fac sorassna Ql 3! cos aor to [ Not applicable | [ Not applicable | [ Not applicable |
Aiea ot comtetina 28 20 PS tz, [8 Local government area in which the land is situated: (eg, Esk Hervey Bay, Wooceo et.) (¥ applicable)
Note: Areas below high water mark are pot within a | Noosa Shire Councit |
Jocal government's area unless provided for under the - - -
Local Government Act 1993, 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing 9 - Q9 apples if i . , Jue) (if acntt
devebpment is on strategis portland ora statenic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port tnd tidal area. For more detals refer to Guide {1 [ Not applicable |
Proposal! details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
@ Wa boatman | Golf course, club house, tennis courts, spa, fitness centre and vacant land
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
Two (2) staged residential subdivision; Stage 1: one (1) lot into two (2) lots and Stage 2:
one (1) lot into twenty-seven (27) residential lots and common property (Community Title
Scheme), access easement and re-alignment of existing 18 hole of golf course
Other applicable parts of Form 1 12, Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, etc)
Pat A must be ed by other
CO ee | Foe rmeton about | Part D, Part F, Part J and Attachment 1 |
when a part of Form 1 may apply refer to Guide 1,
Applicant detalls 13. Applicant's name: 15. Contact person:
ei nel mitaheedioad [ StarCo Developments Pty Ltd | | Philip Starkey |
When signing and fodging this application 14. Contact number: 16. Facsimile number/e-mail address:
The appicant is responsible for ensuring the
information provided i corect. The assessment 07 $440 3333 a 07 5440 3399
manager, any referral agency & the Chief Executive
fwhere applicable) will rely on this information when | 17. Postal address:
assessing and deciding the application.
+ acoftact person
must be shown. 18.
Sy Ss FZ
So
Page 7
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Land owner's consent (if appiicabie) 20. Land owner's consent to the making of this applicatipa=== eee,
Section 3.2.1(3) of the IPA prescribes that an Name Y
appfication must contaln, of be supported by, the
written consent of the land owneris, if the application . .
involves: {i) StarCo Holdings Pty Ltd
() améerialchangeofuse; = FE
(reconfiguration of a lot,
(i) work on land below high-water mark & not within a (ii)
canal as defined under the Coastal Protection and} fees
Management Act 1995.0 ves
(1) work on rail corridor land defined under the (ii)
Transport infrastructure Act 1998.0 Pee eee eee
Section 3.8.1(2}(a) of the IPA provides that .
tandowner's consent is pot required for a mobile of (iv)
femooravERA© ene ee een ee eee eee eee ee eee cence eee
For more information refer to Guide 4, (v)
Resource entitlement (if eppiicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entitlement be given for applications that co
involve a prescribed State resources. NO - goto Q24 O YES - go to Q22
Section 3.2.1(1 IPA prescribes th . os . .
Soy ate hee ete eaystas” 122. This application is accompanied by evidence: (tick applicable box)
Without avidence of the resource entitlement. (i) of the allocation of, or entitlement to, the resource - attach evidence and go to 023(v)
Rater to schedule 10 of the Integrated Planning O (ii) the chief executive of the department administering the resource is satisfied the
Reguteton 1968 thet prescribes the nature of evidence is consistent with an allocation i roe -
racic bythe Stet a suppl ofthe, Bdsog of the development nt with an al of, or entitlement to, the resource - go
development application. - . . .. . . .
CO (iii) the chief executive of the department administering the resource is satisfied the
development application in the absence of an allocation of, or
entitlement to, the resource ~ go to Q23
Advice for completing 023 23. Evidence of the resource entitlement:
gman oO & mandatory It evidence (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (f
Resources, Mines and Water is mandatory where the i. applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
Section 3,2.1(5A) aflows the resource mae to Imit
the time the evidence may be used. Q23 (vi) must be tii iti
camped the idence bre tos (iii) Position of “aes officer
(v) Date
(vi) pen date of evidence a
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
dooumpbibn, rae apo he aoe raion os Kl Yes (NO - the assessment manager may refuse to accept this application on the
must be completed for alloter applications, grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
An application should be accompanied by detalls to : q
support the proposal & enable the assessment Plan / Drawing / Report Number Title Date
manager, referral agencies and any person viewing
the application during public scrutiny of public Development Proposal Report
‘notification to understand the scope of the proposal (i) Noosa Springs - Precinct J with attached drawings and Nov 2007
and any patential impact. reports
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other retevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
DATE
| Fee ®) RECEIVED
[es7/2394 |
[Sie PSPS Fa
Page 8
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Notification of Engagement of Private Certifier (Optional format)
To. Council. { have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement. / / Accreditation Number. Name: ____ Signature:
Page 9
INTEGRATED PLANNING ACT 1997 Part D, Version 2.0, 4 October 2004
WW Form 1 Development Application
Material change of use
i
assessable against a local government's planning scheme &
a.
Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a loca! govemments planning scheme.
Nature of the application 1. This application is for: (tick 1 or both if applicable)
A development permit autores _ (C) Preliminary approval for a material change of use of premises including conceptual
approvals a stepinthe approval process design for any associated works that require approval under the planning scheme (Le.
and does not authorise development to occur. consideration of the proposal concept)
AND/OR
@ EX] Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of "gross floor area” go to ‘ Sg: i"
the planning scheme against which the [ Special Facilities zone (under the superseded planning scheme) |
application wil be assessed.
3. Existing gross floor area: (if applicable) [ Not applicable ]
4. Are there any existing easements on the land?
ONo
(J YES - attach plans of the focation and details of the purpose of the easement
Material change of use detalls 5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
Partly vacant land and partly golf course to residential subdivision comprising twenty
seven (27) dwelling houses and common property and realignment of existing 18" hole of
golf course
6. Number of employees: | Not applicable |
e@ 7. Operating days and hours: | Not applicable |
Associated building works details (if | Site cover: Not applicable
applicable)
For the definition of "site cover’, ‘gross floor ross floor area: Not applicable
area” and ‘storey’ go to the planning scheme 9. Gross floor area: PP
inst which th ion will be , :
sessed ‘he epplcaton 10. Number of on-site car parking spaces: [ Not applicable _ |
11. Number of storeys / maximum height above natural ground: Not applicable
12. Number of employees Not applicable
13. Hours and days the use will operate | Not applicable |
Associated operational works details 114. Details of associated operational works (eg. landscaping, cut and fill, drainage, road works etc.)
if applicable]
fH apphecabie) [ Landscaping, drainage, road works, servicing and bulk earthworks |
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
Page 10
INTEGRATED PLANNING ACT 1997 Part D, Version 2.0, 4 October 2004 DATE RECEIVED REFERENCE NUMBERIS
Page 11
INTEGRATED PLANNING ACT 1997 Part F, Version 2.0, 4 October 2004 Reconfiguring a lot E a Comptetion of all applicable questions on Part F is mandatory for all applications involving the reconfiguring of a lot (including freehokt subdivision, community title subdivision, subdivision by lease, etc.). Nature of the application 1. This application is for: (tick one (1) or both # applicable) A develo idisipeslisodsaeenany ical Development permit - provide details below eg. stage 1: freehold subdivision of 25 lots, realignment of a inthe approval process and does not boundary, creation of an access easement) _ authorise development to occur. Two (2) staged residential subdivision; Stage 1: one (1) lot into two (2) lots and Stage 2: one (1) lot into twenty-seven (27) residential lots and common property (Community Title @ Scheme) and creating an access easement AND/OR ( Preliminary approval -provite details below eg. stages 2, 3 and 4: freehold subdivision of 75 lots, realignment of a boundary, creation of an access easement) The subject land 2. Number of existing lots: [One (1) The information requested in Q2 & 3 is necessary for statistical and planning 3 . Total area of land in application: (if staged, total area of the land in this st PUTBOSES. 62.45 hectares 4. How the subject land is identified in the planning scheme: (name the zone, precinct etc.) | Special Facilities zone (under the superseded planning scheme) | 5. Current use of the land: (# vacant, also identify the previous use) | Golf course, cub house, tennis courts, spa, fitness centre and vacant land ] 6. Are there buildings or structures existing on the land? CNo e@ [1 YES - complete Q7 Indicate which one of the following circumstances applies: (All existing buildings and structures on the land will be demolished as part of the development / redevelopment of the site; or ™ [ed Some existing buildings and structures on the land are proposed to be retained as part of the development / redevelopment of the site - indicate on the plans prepared in response to Question 6 above, those buildings or structures proposed to be retained @ Existing services on the land:(eg. water & sewerage) - attach plan identifying location if appropriate) Water, sewerage, drainage, electricity and telecommunications - please refer to the Engineering Report prepared by TATE Professional Engineers wo , Are there any existing easements over the land? CINO [IX] YES - attech plan identifying easement location & purposa The proposal 10. Total area of land in the development pemit minus any balance area The information requested in Q10-13 is [ 3.06 hectares necessary for statisticat and planning purposes. 11. Number of proposed lots: Twenty seven (27) residential lots, common property and a balance lot
Page 12
INTEGRATED PLANNING ACT 1997 Part F, Version 2.0, 4 October 2004 12. Number of additional residential lots proposed in development permit: (7 eppicable) | Twenty seven (27) | 13. Estate name & stage number: (applicable 7 the application is for a stage or stages of an overall subdivision proposal) [ Noosa Springs - Precinct J ] 14. Area of land to be contributed for community purposes: (# applicable) | Not applicable ] 15. Length of new road to be constructed: (i applicable) [ Not applicable ] PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1. e OFFICE USE ONLY applicable to assessment manager) DATE RECEIVED REFERENCE NUMBER/S
Page 13
INTEGRATED PLANNING ACT 1997
Part J, Version 4.1, 4 September 2006
Form 1 Development Application
; ; _ tS
Clearing native vegetation &
CG
~
Completion of all appticable questions on Part J is mandatory for all applications involving assessment against the Vegetation Management Act 1999
(VMA) for the clearing of vegetation.
Part J does not apply to vegetation clearing assessable against a Council's planning scheme or local law. Where the clearing is assessable against the
planning scheme, Part E of the form applies.
12 Veaetati sari
For further information about vegetation clearing under the VMA refer to
8 of the IPA.
Nature of application
Operational work: clearing of native vegetation is
fagutated under the VMA.
Schedule 8 of the IPA makes the clearing of
vegetation to which the VMA applies assessable
development.
However, the clearing of native vegetation in
certain circumstances is exempt development
under Schedule § of the IPA.
Exempt development inctudes, for example,
clearing to the extent necessary fo build a single
residence on a lot and any reasonably associated
building or structure, if the building of the residence:
has been approved under the IPA; and clearing that
{s for essential management or routine
management as defined in Schedule 10 of the IPA.
Material change of use (MCU): an MCU
application that meets the referral triggers in Q1(b)
must be referred to NRMW for concurrence
assessment, using this form.
Reconfiguration of alot (RaL): a Ral that meets
the referral triggers in Q1{c) must be referred to
NRMW for concurrence assessment, using this
form.
1.
This application is for. (tick applicable box) -
(J (a) operational work for the clearing of vegetation where the clearing is made assessable
under Schedule 8 of the IPA - complete 02, 3, 4, 5&6
EX (b) a material change of use if — complete Q7 only
{i) the lot contains -
a. acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
b. if there is no property map of assessable vegetation for the lot - remnant
vegetation; and
{ii) the existing use is a rural or environmental use; and
{iii} the size of the land is 2 hectares or targer.
XI (c)_ reconfiguration of a lot if - complete 07 only
{i) _ the lot contains -
a. acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
b. if there is no property map of assessable vegetation for the lot - remnant
vegetation; and
(ii) the size of the lot before the reconfiguration is 2 hectares or larger; and
(iii) 2 or more lots are created; and
{iv) the size of any lot created is 25 hectares or smaller.
Type of clearing
Q2 and 3 only apply if the application is for
operational work for the clearing of vegetation as
identified in Q1(a) above.
The type of vegetation clearing (Le. clearing for a ‘relevant purpose’) proposed by this application is: (tick
applicable box/es) -
(2 (i) under a project declared to be a significant project under the State Development and
Public Works Organisation Act 1971, section 26;
D (ii) necessary to control non-native plants and declared pests;
LD (ii) to ensure public safety;
LD (iv) ‘for establishing a necessary fence, firebreak, road or other built infrastructure, if there is
No suitable altemative site for the fence, firebreak, road or infrastructure;
(1 (vy) as the natural and ordinary consequence of other assessable development for which a
development approval as defined under the Integrated Planning Act 1997 (IPA) was
given, or a development application as defined under the IPA was made before 16 May
2003;
DD (vi) for fodder harvesting;
D Wii) for thinning;
LD Will) for clearing of encroachment,
D0 (00) for an extractive industry;
1 (*) for clearing regrowth on leases issued under the Land Act 1994 for agriculture and
grazing purposes.
Page 14
INTEGRATED PLANNING ACT 1997
Type of clearing (com)
Q3 only applies if the application is for operational
work for the clearing of vegetation as identified in
Qi fa) above.
Section 22A( 1) of the VMA provides that, if a
vegetation clearing application is not for a relevant
purpose the application is taken not to be a property
made application and the assessment manager
must refuse to receive the appication.
An application is for a relevant purpose if the chief
executive of NRMW ts satisfied the proposed
clearing is a relevant purpose. Relevant purposes
are prescribed under section 22A(2) of the VMA.
Adyica for completing Q3
Confirmation from the chief execute NRMW or
delegate that the appication is for a relevant
purpose fs required for all vegetation caring
applications.
Part J, Version 4.1, 4 September 2006
. Ig this application accompanied by confirmation that the chief executive of NRMW is satisfied the
vegetation clearing application is for the relevant purpose/s identified in question 2?
OYes
Ono
Confirmation is provided by either: (tick appicable box):
(A letter of confirmation from the chief executive of NRMW, or delegate, is attached to this
application;
OR
(1 The applicant requests that the chief executive of NRMW or delegate, considers whether
the vegetation clearing application is for the relevant purpose identified in question 2 and
completes the section below:
Submissions seeking confirmation from the chief Name of Delegated Officer
executive NRMW or delegate must incuude
information that demonstrates how the iti
wera oa that gona ho proposed Position of Delegated Officer
Submissions ae accepted at al NRMW Service Signature of Delegated
Centres and wit be forwarded fo the nearest Officer
Vegetation Services office.
Date / /
Note: If confirmation is not provided, this application is not a properly made application.
Property vegetation management ._ Is a PVMP attached to this application?
plan (PVMP} Cyes
A property vegetation management pian (PVMP)
tiust accompany al vagetation clearing [1 NO - a PvMP must accompany all applications for vegetation clearing
applications and must contain aff the information
Wentified in Q5 & 6.
The PVMP is to refer to the vagetation identified In
Q1 above.
The PVMP may also include any other information
the applicant considers will assist in the
assessment of the application.
For an apptcation for operational work, the relevant
code is the regional vegetation management code
applying to the area of the application.
tig a not a requirement for a PVMP to be provided
with an MCU and/or Ral application that is referred
to NRMW for the assessment of clearing.
, The PVMP accompanying this application addresses the following matters: (tick # applicable)
(2 (i) the location and extent of the area proposed to be cleared - complete 06;
(CJ (ii) the purpose of the clearing;
(1) (iti) details of the way the proposed clearing meets the performance requirements of the
relevant code or policy for the area.
. The location and extent of the area proposed to be cleared in this application is shown by —
CO {a) a map showing ~
(1 (i) the boundary of the area on an image base; and
C (ii) five (5) or more points visible in the image base that correspond to identifiable
fixed features; and
D (iii) the Map Grid of Australia 1994 coordinates and zone references for each point,
acquired by GPS or similar system of satellites that receives and processes
information, and
(CC (iv) a description of the feature that each point represents;
OR
(CJ (b) a description of the boundary of the area by reference to Map Grid of Australia 1994
coordinates and zone references for the area.
Page 15
INTEGRATED PLANNING ACT 1997
Clearing as a result of a MCU or RaL
Q7 only applies to MCU and Ral. appications.
This information fs required for al MCU and Ral
applications.
For a MCU application the relevant poScy is the
NRMW policy for assessing material change of use
applications.
For a Ral application the relevant policy is the
NRMW policy for assessing reconfiguration of a bt
applications.
Note: Clearing as part of and as a consequence of
the MCU/Ral Includes:
{a) clearing of assessable vegetation that willbe
approved of authorised by the MCU/RaL
approval,
{b) additional clearing under exemptions that would
apply as a result of the approvak and
{c) clearing that will be necessary to accommodate
the proposed use and development of the
premises.
Where clearing of remnant vegetation is not
identified in the appication, any future clearing of
the remnant vegetation will require a separate
approval.
7.
Part J, Version 4.1, 4 September 2006
Confirm by ticking the applicable box(es), that the following details are provided in plans and
written information supporting the application:
{1 (i) Details of how the application meets the performance requirements of the NRMW
concurrence agency policy for Material Change of Use (MCU) and/or the NRMW
concurrence agency policy for Reconfiguration of a Lot (RaL).
J (i) The location and extent of:
- —_ allinfrastructure associated with the development, including proposed building
envelopes and underground or above ground services;
= all proposed aflotment boundaries;
= all proposed roads, easements, vehicle and pedestrian access and parking;
= any proposed clearing or consequential clearing that will result from the development
including firebreaks and fire management lines, excavations and stockpiling of soil and
clearing that will be necessary in order maintain the infrastructure proposed, following
its construction.
Please note: A copy of the original MCU and/or RaL application and Acknowledgement Notice
must be provided when referred to NRMW.
PLEASE NOTE: PART J of Form 1 cannot be accepted by the assessment manager unless accompanied by PART A. The assessment manager may refuse to accept
an application that, at the time of lodgement, fais to provide all applicable information requested by Part A and any other relevant part of Form 1,
OFFICE USE ONLY (appticable to assessment manager)
DATE RECEIVED
REFERENCE
NUMBER/S
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Form 1 Development Application
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist’)
IMPORTANT NOTE FOR ALL APPLICANTS:
1, This checklist was formerly referred to as the “Referrals Checklist”. Some of the 'Guides' to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Counci etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4 Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. It is the responsibility of the applicant to accurately complete this checklist.
6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005,
7. Depending on the nature of the application, an applicable State entity may be ether the assessment manager or an IDAS referral agency for the application.
8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2,
9. To assist you in answering the following questions a series of guides are available free from the IPA website www. ipa.ald.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
11. Section 3 provides advice about the referrais that can be required for applications for building work assessable against the Buikting Regulation 2006.
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4. (C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered ‘none of the above" to Qt, .
the appiicaion requires by the . has not been made - complete Part G of Form 1
administering authority? CO (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
fan entity, other than the administering Made - complete Part G of Form 1
authority, is the assessment manager for the X (iii) none of the above
appiication, the administering authority Is a
concurrence agency for the application in retation
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Ky of Form 1
for approval where an allocation under the Water
Act 2000 is required.
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY {applicable to assessment manager}
[ DATE RECEIVED [ REFERENCE NUMBERS
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an appication is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relavant focal goverment (for a devolved ERA) or the Queenstand Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 State-controlled road matters 2. The application involves: ftick applicable boxes) For more information refer to Guide 3. 7 " . Unless you answered "none ofthe above" to 02, (0 (i) development on land contiguous* to a State controlled road and for the application triggers referral to the Department LO (a) material change of use assessable against the planning scheme; of Main Roads (OMA) as a referral agency. i In certain circumstances DMR will be an advice Ci (b) reconfiguring a lot unless - . agency, while in other circumstances OMR will « the total number of lots is not increased; and be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased: Scene 2 the IF Regulation wil asst youto Oo) operational work (not associeted with a material change of use assessable against the concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)— associated with access to a State-controlled road; or « for filling or excavation; or « involving the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a State-controlled road. (1 (ii) development on land not contiguous to a State-controlled road and - O(a) material change of use - * assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; UO (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation and exceeding the thresholds set by that schedule; [C1 (©) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) above)— « assessable against the local government's planning scheme; and « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule. [XI (iii) none of the above Clearing vegetation = 3. The application involves: (tick applicable box/es) For more information refer to Guide 12 . XX (i) material change of use - Pee eee (a) assessable against the planning scheme; a Lot Natural Resources and Sate (b) ona lot containing - ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or manager for the application, NRWisa « if there is no property map of assessable vegetation for the jot - remnant vegetation; enurrence agency forthe application in relation (c)_ where the existing use of the land is a rural or environmental use; and it you ticked 03() or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 referral to NRW for assessment regardless of El (ii) reconfiguring a fot - whether vegetation clearing is proposed of not. we (a) ona lot containing a category 1, 2 or 3 area shown on a property map of assessable vegetation or, if there is no property map of assessable vegetation for the lot, remnant vegetation; (b) where the size of the lot before the reconfiguration is 2 hectares or larger; (c) where 2 or more lots are created; and (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 D (iii) operational work - (a) for the clearing of native vegetation where the vegetation clearing is made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of Form 1 CI (iv) none of the above. Strategic port land 4. The application involves: For more information refer to Guide 11. It you Gicked (i) - te relevant Port Authority is the assessment manager for the application. If you ticked (ii) Queensland Transport is a concurrence agency for the application. O (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI Act) - complete Part | of Form 1 O (ii) a material change of use that is inconsistent with the land use plan approved under the TI Act for the strategic port land - complete Part | of Form 1 & (iii) none of the above 4 Land contiquous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land Is within 100m of the State-controtled road; or that is part of a future State- controiled road. Page 2
Page 18
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 Apri 2007
was
Acid sulfate soils 5. The application involves development on land situated in an identified5 local government area
For more information refer to Guide 10, and where the surface of the land is: (tick applicable box)
Unless you answered “none of the above" to 05, (J (i) below 20m AHD® and the development will involve the excavation of 1000m3or more of
Tae cpiiatcn Feauites assessment by soil or sediment at or below 5m AHD, or
(NRW). (1 (ii) at or betow 5m AHD and the development will involve filling the site with 1000m: or more
Hf an agency other than NRW is the assessment of material
manages for the application, NRW is an advice .
agency for the application in relation to this C1 (ili) none of the above
matter.
Major hazard facilities or possible /6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more Information refer to Guide 17. NO
Ifyou answered YES’ to Q6, the application a
requires assessment by he Department of C1 YES - complete Part L of Form 1
Ememency Services .
{fan agency other than DES Is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.
Water related development under the |7, The application involves:
Water Act 2000 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items (a) ~ (f), refer (tick applicable box/es)
to Guide 15. For mare information about item . . os oe .
() refer to uid 4 Daas me enticaton C1 (a) in a watercourse, lake or spring, (eg. 2 pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ka, Ks, Ke, of Ks of Form 1 whichever is applicable;
Unless you answered “none of the above” to. Q7, i -
te skate res acessmen bye C) (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
“ex ates . 1 ’
. ( (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
Wan agency atherthan NRW s be assessment by a water resource plan, for use for purposes other than stock and/or domestic
caraerce agency fre apa US - complete Part Ki of Form 1;
relation to this matter. (J (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
( (e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ke of Form 1;
1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form 1
(C1) (g) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
(ii) none of the above.
Removal of quarry material froma |8. Does the application involve development for the removal of quarry material from a watercourse?
watercourse
For more information refer to Guide 16.
you answered “YES" to Q8, the application
fequires assessment by the Department of
Natural Resourres and Water (NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application In
telation to this matter.
Note; Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse Is also an
Environmentally Relevant Activity (ERA).
requiring an allocation notice under the Water Act 2000?
XJ No
(17 YES - complete Parts Kr and G af Form 1
The identified local government areas are: Aurukun, Bowen, Brisbane, Sroadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Coobola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Jehnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pina Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Australian Height Datum (AHD).
The declared ground water areas are listed in Guide
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.
Page 19
INTEGRATED PLANNING ACT 1997
Operational work that Is tidal work or
work in coastal management district
For more information refer to Guide 18. For
More information about prescribed tidal work In
loca govemment tidal areas refer to Guide 24.
Unless you answered ‘none of the above” to 09,
the application requires assessment by the
Environmental Protection Agency (EPA).
(fan agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
telation to this matter.
Local government is the assessment manager
for ail prescribed tidal work.
Operational work below high water
mark
For more Information refer to Guide 18. For
more information about prescribed tidal work in
local govemment fidal areas refer to Guide 24.
Unless you answered ‘none of the above" to
Q10, the application triggers referral to
Qtd) as a concurrence agency.
Local government is the assessment manager
for all prescribed tidal work.
9.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: { tick the applicable boxes)
Di
D iti)
O iii)
& ivy)
tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
tidal work that is prescribed tidal work'' other than in a canal'2 -complete Part P of Form 1; oF
carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a} to () below are ticked.
C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal wate) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal’? intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water,
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
temoving or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark: or
none of the above.
0)
Ot)
Od)
Oe)
OW
Oo)
C0 th)
OW
10. The application involves operational work that is: ( tick the applicable boxes)
(i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
CL (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
CO (ili) carried out within a coastal management district'S under the Coastal Act and for -
XI (iv)
O(a)
OH (b)
O(c)
disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;
teclaiming land under tidal water - complete Part M of Form 1; OF
constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 7;
none of the above.
Coastal management
For more information refer to Guide 18.
Unless you answered “none of the above" to
Q11, the application requires assessment by tha
Environmental Protection Agency (EPA).
if an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
11.
The application involves: (tick the applicable box/es)
a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'®
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA‘ of at least 1000m2
« the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lof’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? - complete Part M of Form 1
none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works comp'etely or partly within a local government tidal area.
12 Canal means canal as defined under tha Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works comptetely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
Page 20
INTEGRATED PLANNING ACT 1997 Development within the limits of a port For more information refer to Guide 18. For information about prescribed fidal work refer to Guide 24. if you answered "YES" to 012, the application triggers referral to the Port Authority. The Port Authority is a concurrence agency if the development is — * within 200m of a shipping channel or an entry and exit shipping corridor for the port * within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage or spoil grounds, ¢ within 1000m of a planned port facility identified in a land use plan approved under the Transport Infrastructure Act 1994. In all other situation the Port Authority is an advice agency, IDAS Assessment Checklist, Version 20, 2 April 2007 . Does the application involve development below high water mark'® and within the limits of a port under the Transport Infrastructure Act 1994? Bd No (2 YES - compkte Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work Marinas For more information refer to Guide 18. For information about whether a marina Is prescribed tidal work refer to Guide 24. The local govemmentis the assessment manager for all prescribed tidal work. Ifyou answered "YES" to Q13, the application triggers referral to Service as an advice agency. 13. Does the application involve operational work that is tidal work for a marina’? with more than 6 vessel berths? NO LD YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work Tidal works in strategic port land tidal] 14, Does the application involve tidal works within a strategic port land tidal area2?? areas NO For more information refer to Guida 18. (YES - complete Part M of Form 1 Uniess you answered “NO” to 014, the refevant Pont Authority is the assessment manager for the application and the Environmental Protection Agency (EPA) and Queenstand Transport (QT) are concurrence agencies for the application. Heritage 15. Does the application involve development in a heritage registered place as defined under the For further Information refer to Guide 19. \f you answered “YES” to Q15, the application triggers referral to the Queensland Heritage Council as concurrence agency for the application. Unless you answered ‘none of the abave” to Queensland Heritage Act 1992? Ne) (YES - complete Part C of Form 1 15(b)The application involves: (tick applicable boxes) Q15(b), the application involves referral to the CI (i) amaterial change of use assessable against the planning scheme and the lot shares a q as an advice common boundary with a protected area or registered place under the Queensland agency for the application Heritage Act 1992; (CI (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; [XI (iii) none of the above. Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and For more information, including a list of the declared catchment areas within Queensland, refer to Guide 13, Unless you answered "none of the above" to Q16, the application requires assessment by the Department of Natural Resources and Water (NRW). If an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in felation to this matter. involves: (tick the applicable box/es) C(I) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares; (7 (ii) development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994; [XI (iii) none of the above 18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. 19 Marina is defined in the Transport Operations (Maritime Pollition) Regulation 1995. 20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page §
Page 21
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Applications involving development on land
designated for community infrastructure may
tigger this referral.
For more information refer to schedule 2 of the
IP Reguiation.
If you answered "YES" to Q19, the appfication
fequires assessment by the chief executive of
tha isteri authorising
the development for the designated purpose.
If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the apptication in retation to this
matter.
Contaminated land 17. The application involves: fick the applicable box/es)
Applications involving material change of use j 7 ii i: -
and! or reconfiguring alot may tigger ts Ov reconfiguring a fot for which all of part of the premises are
referral. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
For more Information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above" to * item 6, including the exemption otherwise provided for by paragraph (e); or
17, the application requires we « item 7, including the exemption otherwise provided for a mining activity or petroleum
agency other than EPA is the assessment activity; or . . .
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in .
rdlien tots nantes ; ordnance - complete Part N of Form 1
O (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
[1 (iii) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
For more information refer to schecke 2of the IP 0 (i) reconfiguring a fot where any part of the lot is -
Uniess you answered ‘none of the above" to ° subject to an easement in favour of a distribution entity or transmission entity under the
18, the application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
agen i easement ed it that Act; or
@ favout of as advice agency. » situated within 100m of a substation site;
O (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
LD (iii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
CL (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
[XI (v)_ none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development —
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
(KINO
0 Yes
Page 6
Page 22
INTEGRATED PLANNING ACT 1997
SEQ Regional Pian
For more information refer to schedule 2 of the
IP Regulation.
Refer to Chapter 2, pat SA and schedule 10 of
the and schedule
2 of the Regulatory Provisions for relevant
definitions.
Untess you answered ‘none of the above" to
Q20, the application requires assessment by the
Office of Urban Management (OUM).
Fisheries matters
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above" to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(OPISF).
If an agency other than DPI8F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
felation to items (i) - (iv) and an advice agency
in relation to item (v).
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
(1 (i) amaterial change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
O (i) anurban activity -
(2 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(2 sinan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
impact assessment is required under the relevant planning scheme
(5 (ii) intensive animal husbandry, or
C1 (ii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
(0 (i) anurban activity and not specified in section 2.4(2); or
(ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
{c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
{d) in the Investigation Area for —
0 (i) anurban activity and not specified in section 2.10(2);
CI (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
CL (iii) intensive animal husbandry
(ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
{iii) none of the above
O
&
21. The application involves: (tick the applicable box/es)
(1 (i) an assessable material change of use for aquaculture - complete Part 0: of Form 1:
O (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
O (ili) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
[XJ (vi) none of the above.
Page 7
Page 23
INTEGRATED PLANNING ACT 1997 integration of land use and public transport For more information refer to Guide 23, schedule 8A of the IPA, & schedule 2 of the IP Requlation. Unless you answered ‘none of the above’, the application tiggers referral to QT as a concurrence agency. Railway safety and efficiency For more information refer to Guide 23, schedute 8A of the [PA & schedute 2 of the IP Reaulation. Unless you answered ‘none of the above”, the appiication tiggers referral to QT as a Concurrence agency. Moonie to Brisbane pipeline For more information refer to schedule 2of the IP Reautation. Uniess you answered ‘none of the above’, the application tiggers referral to the holder of pipeline licence No 1 issued under the Petroleum Act 1923, currently Santas QNT Pty Ltd, for advice. IDAS Assessment Checklist, Version 20, 2 Apri 2007 22. The application involves: (tick the applicable box/es)— 24, C (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that schedule. CO (ii) reconfiguring a fot— O(a) on land that is completely or partly within a public transport corridor, and the total number of lots increases; C1 (b) on land that is completely or party within a future public transport corridor or an airport's public safety area; [1 (©) on land that is within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000m? or greater: (0 (d) _ for a residential purpose within the 25 ANEF contour for an airport; CJ (e) fora residential purpose resulting in 100 or more allotments. D (ii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, on land that— Oa) is completely or partly within a public transport corridor or a future public transport corridor; 1 (b) _ will result in work that encroaches into an airport's operational airspace. Ld (iv) none of the above. . The application involves: (tick the applicable box/es)— OD (i) amateriat change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that schedule. OO (ii) reconfiguring a tot O(a) onland that is completely or party within a future public transport corridor, future railway land or a railway tunnel easement; CO (b) on land that is within 400m of a Citytrain passenger railway station or a future Citytrain passenger railway station, and the total site area is 5000m2 or greater; on land that abuts rail corridor land, commercial corridor land or future railway land, and the total number of lots increases; on land that abuts rail corridor land, commercial corridor land or future railway land and an easement abutting the corridor or future railway land is created; Oe) onland that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and the total number of lots increases; C1 (f) _ fora residential purpose resulting in 100 or more allotments. C1 (iii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, involving extracting, excavating or filling greater than 50m3, on land that— O(a) _ is completely or partly within rail corridor land or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; (1 (b) _ is completely or partly within future railway land, or a railway tunnel easement; C1 (c) abuts rail corridor land, commercial corridor and or future railway land, and the work is within 25m of the railway boundary. [XI (iv) none of the above. The application involves the easement for the construction or operation of the Moonie to Brisbane strategic pipeline, and involves: (tick the applicable box/es)— (1 (i) a material change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be located wholly or partly in the easement. O (ii) reconfiguring a lot L (iii) operational work assessable against the planning scheme, that is filling, excavation, compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the work is located wholly or partly in the easement. EX (iv) none of the above. O@ Od Page 8
Page 24
INTEGRATED PLANNING ACT 1997 Koala habitat area For more information, refer to Guide 26 and schedule 2 of the P Regulation. Untess you answered "none of the above’, the application requires referraé to the Environmental Protection Agency as a concurrence agency. Wild river area For more information, refer to Guide 27 If you answered YES to Q26, you must also complete section 2 of this checklist. This wil enable you to determine if your application can proceed in a wild river area and which referral agency will assess your application against the Wild Rivers Code, or if the proposed development ts “prohibited* in a wild river area. Note: Development can be ‘prohibited’ in a wild fiver area because the application cannot be accepted by the assessment manager. Preliminary Approval Hf you answered YES to Q27, the application Department of Local IDAS Assessment Checklist, Version 20, 2 Apri 2007 25. The application involves: (tick the applicable box/es)— 1 (i) a material change of use of premises in a koala conservation area or koala sustainability area made assessable under a planning scheme, that is not for a domestic activity and will result in — (1 (a) clearing of native vegetation over an area greater than 2500m?; ( (b)_ anew building and any reasonably associated structure with a total footprint greater than 1000m?; C1 (c)_ anextension to an existing building and any reasonably associated structure if the extension has a total footprint greater than 1000m2; (J (d) extracting gravel, rock or sand from an area greater than 5000m?; 1 €€) excavating or filling an area greater than 5000m?; (1 (f) additional traffic in a koala conservation area or koala sustainability area, between 6p.m. on a day and 6a.m. on the following day. (C1 (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will Tesult in — LJ (a) an increased number of lots; LU (b) clearing of native vegetation over an area greater than 2500m?, OO (ili) operational work in a koala conservation area or koala sustainability area made assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation over an area greater than 2500m2. CF (iv) operational work in a koala conservation area or koala sustainability area made assessable under a planning scheme (not associated with a material change of use mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity and will result in - 1 (2) clearing of native vegetation over an area greater than 2500m2; (CO (b) extracting gravel, rock or sand from an area greater than 5000m2; C1 (c) excavating or filling an area greater than 5000m?. [XI (v) none of the above. 26. Does the application involve development in a wild river area declared under the Wild Rivers Act 2005? Ne) OC Yes 27. Does the application involve a development for which preliminary approval is sought under Section 3.1.6 of the integrated Planning Act 1997? No (Yes Wetlands Domestic activity means the construction or use of a single residence on a lot and any reasonably: associated building or structure. Examples of a building or structure that could be reasonably associated with a single residence include: caretaker's residence, granny flat, building or structure used for a home business. Note: Wetland is defined in the Integrated Planning Regulation 1998. Unless you answered ‘none of the above” to Q28, the application involves referral to the Environmental Protection Agency as an advice agency for the application, 28. The application involves: (tick the applicable boxes) - CU (i) a material change of use, other than for a domestic activity, assessable against the planning scheme that is in or within 100m of a wetland; O (ii) reconfiguring a lot - In or within 100m of a wetland that will result in LD (a) more than 10 lots being created; or (1 (b) lots tess than 5 hectares; [1 (ili) none of the above Page 9
Page 25
INTEGRATED PLANNING ACT 1997 Conservation Estate Urban purposes is defined in the Integrated Planning Act 1997 as “purposes for which land is used in cities or towns, including residential, industial, sporting, recreation and commercial Purposes, but not including environmental, conservation, rural, natura or widemess area purposes”. Unless you answered "none of the above" to Q29, the application involves referral to the fi i as an advice agency for the application. IDAS Assessment Checklist, Version 20, 2 Apri 2007 29. The application involves: (tick the applicable box/es)— C (i) a material change of use for urban purposes that is in or within 100m of any of the following - CJ (a) a protected area, forest reserve, critical habitat or area of Major interest under the Nature Conservation Act 1992:; (1 (b) a State forest or timber reserve under the Forestry Act 1959; (J (c) a marine park under the Marine Parks Act 2004; (1 (4) arecreation area under the Recreation Area Management Act 1988; (Je) a world heritage area listed under the World Heritage Convention; (1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977. [1 (ii) reconfiguring a lot if - EX] (a) any part of the lot is situated in, or within 100m of, any of the following - [XI (i) a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992; C1 (ii) a State forest or timber reserve under the Forestry Act 1959; C1 (iii) a marine park under the Marine Parks Act 2004; CO (iv) arecreation area under the Recreation Area Management Act 1988; (1 (v) a world heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977; and EX] (b) the reconfiguration involves more than 10 lots being created, or any lot tesulting from the reconfiguring is less than 5ha; C1 (iii) none of the above. Page 10
Page 26
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
SECTION 2 - ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)
Wild River Area
ti the responsibility of the appticant to
determine # the development is proposed In
awild river area.
tnformation about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www. new.did.cov.au or
contacting the department by email on:
Note on Referrals
Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For information regarding development in a wild
iver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide Information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
May vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.
Apptications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for davelopment activities which may be made
including those In a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.
Which wild river area is the development proposed in?
The proposed development is to be located in: (tick the applicable box/es)
J i) a high preservation area (HPA);
(ii) a preservation area (PA) ;
(0 iil) a wild river floodplain management area (FMA);
(J iv) a wild river nominated waterway;
(J v) a designated urban area (DUA).
Environmentally relevant activities
(ERAs) in a designated urban area
\fyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.
If you answered NO to Q2, please complete the
temaining questions in Section 2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
0 NO oO YES (ensure you have completed Part G of Form 1)
Clearing native vegetation
\f YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Gulde 27 for a list of relevant purposes for
which an application may be made in a HPA.
{f YES and you bicked Q4 box i) the application
May be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box il)
the application will not be accepted.
Note: if clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
Is the application operational work for clearing native vegetation in a HPA?
oO NO oO YES (ensure you have completed Part J of Form 1)
If YES, is the clearing?
(C1 ji) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
(1 ii) in a HPA outside a registered area of agriculture?
Page 11
Page 27
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas
Ifyou answered YES to 05, and ticked any
baxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.
If you answered YES to Q5 and ticked bex j) in
Q6, your apptication is required to be referred to
the EPA.
Note: {f specified works are proposed in a local
govemment area, it is prescribed tidal work - the
relevant local goverment will be the
assessment manager with the EPA as a
concurrence agency
lf you answered YES to Q5, and ticked box ii) or
ii) in Q6, your application requires referral to
DPIF.
if you answered NO to Q5 and ticked box i) in
Q86, the application will not be accepted.
it you answered NO to Q5, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Cade. Applications for purposes other
than specified works or as described above will
not be accepted.
\f you answered NO at Q5 and ticked box ili) In
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27
Residential, commercial or industrial
development
Ifyou answered YES to Q7, your application is
Not subject to wild ver requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild 8
(ver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.
Ifyou answered NO to Q7 and ticked either box
i) oil) In QB, the assessing agency is the
relevant local govemmment. The application must
be assessed against and must comply with the
Wild Rivers Code.
6.
IDAS Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)
Lino Cl yes
The application is for one or more of the following:
(J i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF
O ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF
O iti) Building or operational works in a fish habitat area (ensure you have completed Part Q2 of Form 1).
Is the application for residential, commercial or industrial development in a designated urban
area?
Ne) L] Yes
If NO, does the application for residential, commercial or industrial development involve:
J i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or
oO ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).
Animal husbandry activities
if you answered YES to Q9 your application
fequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted If proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
oO NO oO YES (ensure you have completed Part R of Form 1)
Agricultural activities
lf you answered YES to Q10, your application
tequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if propased in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
aL
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?
(No
If YES is the application for:
(J i) a material change of use; or
O ii) operational works.
oO YES (ensure you have completed Part Q of Form 1)
Page 12
Page 28
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
‘The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.
If you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 ji) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Witd
Rivers Code, otherwise the works become
assessable development for which an application
Is required and must be assessed by NRW
against the retevant part of the Wild Rivers Code
and must comply with the code.
if you ticked Q13 iii) your application Is not
‘subject to wild fiver requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Works that interfere with overland
flow water
The relevant wild river declaration will state
works that interfere with overland flow water that
are dither self assessable, assessable or exempt
from wild river requirements.
If you ticked Q151), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
If you ticked 15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
{f you ticked Q15 iii) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted.
Ifyou answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with water in a
watercourse
Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (induding dams or weirs,
stream realignment or stream diversion) will not
be accepted.
ina PA, applications for Instream dams and
weirs may be accepted in nominated waterways.
if you ticked box ii) in Q19, your application will
not be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
ew. nw. cid. gov.au or contacting the
department by email on:
13.
16.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
oO NO O YES (ensure you have completed Part Ks of Form 1)
(fF YES, is the application for works stated in the relevant wild river deciaration to be?
Ci) assessable works
(FJ ii) self-assessable works
C0 iii) exempt works
Does the application involve works that interfere with overland flow water ina FMA?
| NO oO YES (ensure you have completed Part Kio of Form 1}
If YES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works
(J ii) self-assessable works
(iii) exempt works
Does the application involve building or raising waterway barrier works in a PA?
| NO (77 YES (ensure you have completed Part Os of Form 1)
Does the application involve aquaculture in a PA?
C) No (21 YES (ensure you have completed Part O: of Form 1)
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
O NO oO YES (ensure you have completed the relevant Part K of Form 1)
If YES,
(J i) The application is for an instream dam or weir; or
LJ ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 13
Page 29
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
fequire referral to the EPA. The assessment of
20.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?
(No (J YES (ensure you have completed Part G of Formt)
some ERAs is assessed by NRW, others have 121. |s the application for an ERA 20 instream?
been devalved to DPIF, NRW or defegated
local goverment (see EPA website for more oO NO O YES
information on devolved ERAs)
If you answered NO to Q20 you do not need to i it i ?
conplate Os 21.24. 22. Is a quarry allocation notice held for the proposed ERA 20 instream?
it you answered YES to 020 and the LC] No Dyes
development is in a PA, your application must be
a Wa ae Clan 23. Does the application involve any of the following in a HPA?
With the code, unless the proposal isto i) a level 2 ERA 11, (and is for specified works or a residential complex)
pee isinlaaltaaahes i bailbalal i) an ERA 19 (dredging)
requirements (see Q2}._ You will be able to iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
determine if ication will not be accepted : j .
forthe lon arewaing 021-024, the Wild Rivers Act 2005, and Environmental Protection Act 1994)
tye arsvered NOto 021, you 9 eat need to iv) an ERA 22 {out of stream)
fe 022. If you answer [0 O21 you
ze requed to complete O22 LJNno C1 yes
lf you answered NO to Q22, the application will
notbe accepted. Ifyou answered YES t0Q22, 124 Is the proposed development for ERA 20 (out of stream) and;
the application must be assessed by NRW — inaFMA: and
against the Wild Rivers Code and must compty
with the code.
If you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to 023, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
Ifyou answered YES to 024 the application will
not be accepted. If you answered NO to 024,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
ifthe development is proposed in a designated
urban area there may be no wild river
tequirements. See Section 2.02.
Note: AH appfications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban atea).
— not low impact; and
— not for a residential complex in the area, or for specified works.
Ono Oyes
Documentation
Ifyou answered NO to Q25, your application
May be subject to an information request and
processing of the application may be delayed.
25. Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?
Cno Dyes
2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14
Page 30
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
SECTION 3-
BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1.
For more information go to schedule 2 table 1 and
schedule 2A of the IP Reautation.
Assessment petiod 15 days. No response is a
deemed refusal.
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
fequires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.
Fire safety for budget accommodation | 2.
For more information go to schedule 2 of the {P
Beaulation
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.
Spray painting 3.
For more information go to schedule 2 of the |P
Reautation
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.
Retail meat premises 4.
For more information go to schedule 2 of the IP
Reaulation
An application may trigger referral to Safe Food Qid as a concurrence agency if the application involves a
retail meat premises.
Private health facilities 5.
For mare information go to schedule 2 of the IP.
Regulation
An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.
Workplace area less than 23m? 6.
For mare information go to schedule 2 of the IP.
Regulation
An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?
Land contiguous to a State-controlled | 7.
toad
For mora information go to schedule 2 of the IP
Beaylation
An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.
Pastoral workers accommodation 8.
For more information go to schedule 2 of the 1P
Regulation
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application invoNves pastoral workers accommodation.
Child care centre 9.
For mare information go to schedule 2 of the IP.
Regulation
An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.
Coastal development 10.
For more information go to schedule 2 of the IP
Requtation
An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line22.
Heritage 11.
For more information go to schedule 2 of the IP
Reaulation
An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.
Fisheries matters 12.
For more Information go to schedule 2 of the IP
‘Regulation
An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.
Integration of land use and public 413.
transport
For more information go to schedule 2 of the IP.
Reaulation
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace”,
Railway safety and efficiency 14,
For mora information go to schedule 2 of the [P
Regulation
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local govemment for an application, it is taken to be a deemed
Tefusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of 15.
particular building work for single
detached class 4 building or class 10
building or structure
For more information go to schedule 2 table 1 of the
(P Requtation.
Assessment period 15 days. No response is a
deemed approval.
An application will trigger a referral to the local government if it is :
e fora single detached class 1 building or class 10 structure; and
e the local govemment has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.
Coastal building ines ave prescribed under ihe Coastal Protection and Management Act 1995.
7) Operational airspace is as defined in State Ptanning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities".
Page 15
Page 31
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local goverment as the concurrence agency.
For more information go to schedule 2 table 4 of the
IP Regulation.
Assessment period 15 days. No response is a
deemed tefusal.
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
(P-Regutation, 18. An application may trigger referral to the local govemment as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.
deemed retusa. 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For mora information go ip schedule 2 table 1 of the been completed.
IP Reautation.
Assessment period 15 days, No response is a
deemed refusal.
Higher risk personal appearance 21. An application may trigger referral to the local govemment as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the © complies with the performance criteria of the Queensland Development code part 15; and
IP Regulation and the QDC part 15. © the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. No response is a
deemed refusal.
Building work for residential service |22. An application for building work for premises in which residential care service under the Residential
For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
JP Requtation and the QDC part 20. referral to the local government as the concurrence agency.
Assessment period 15 days. No response is a
deemed refuse.
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding feferral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Requtation.
Assessment period 5 days. No response Is a
deemed refusal.
Building work for rainwater tank In 24. An application may trigger referral to the local government as the concurrence agency to determine if the
designated rainwater tank area
For more information go to schedule 2 table 1 of the
{P.Reautation and the QOC part 25.
Assessment period 15 days. No response is a
deemed refusal.
building work or structure complies with the relevant performance criteria if -
© Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and
¢ Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 16
Page 32
BC RIE Noosa COUNCIL
ea oo PAYMENT REQUEST FORM
Supporting documentation must be attached for all payments
Creditor No.
If a requisition for purchase order has been done DO NOT USE THIS FORM.
PAY TO:
(Max 40 Spaces) Sfrarce Dew eta pyren ote Pl
ADDRESS:
(2 lines only) P oO —_— di HY
Nees A_ltEeap$
POSTCODE: (25%]
F PAYMENT — Please tick appropriate box
Gi REFUND C) REIMBURSEMENT ( FBT form may be required)
Q) TRUST BOND RELEASE ‘ Q) ponation
(Grants Qs wasirry cam
(2 _ SUPERANNUATION PAYMENT (PAYROLL USE ONLY) (} Leaats REQUEST
(2 CONFERENCE REGISTRATION QO) PERFORMANCE PAYMENTS
() EMPLOYEE DEDUCTIONS (PAYROLL USE ONLY) QO) oTHER (AS SPECIFIED)
a. Details — Please tick the appropriate box if applicable (See
for more Information
{.] ABN holder. If yes, ABN #:
CJ Registered for Gst
FBT DETAILS ~ Please indicate if applicable
Q Fringe Benefits Tax Dectaration is required and is attached with a photocopy of receipt
INVOICEOCUMENTREF § [3[Sle[Clelal | I iL |
Ledger Number GL Narrative
General Ledger No. Sub A/c or Activity GST Amount (Description., Receipt No., Property No. etc)
Or Work order Task $ :
/ ol* 31 |" 3 o less Le trnnwol ef. Orerpe Aj
I Vv
ha ‘ “3 Sebed
O CeECECoceecoo
Total Payment “rs
Tac Gal Te WEES GRU GONADS Ghaiged WTS GIRGGT GROW GHMIGT BONS ware
‘satisfactorily performed and according to an agraement with the above named AND that they were
nacessarily required for council AND that the charges were fair and reasonable OR that appropriate
‘authorisation for this paymant has been recalvad by me in accordance with council's established
procedures.
‘SSGNATURE OF REQUESTING OFFICER
DATE:
1 cortty that this payment is being made in mocordance with the established payment
procodures of tre councd snd in accordance with the requirements of tee Local Gover nent
Act and that such payment is in accordance with the adopted budget of council ard that the
‘authorisation of this payment Is In accordance with my detegated authority Frit.
PS Kren
SIGNATURE OF AUTHORISED OFFICER /
pare THC ST
| PRININAME OF REQUESTING OFFICER
FAINT NAME OF AUTHORISED OFFICER
Instruction to AP Team
_
Hold Cheque for: (Ri Sth
(Please refer to Accounts Payable Procedures doc. to ensure correct use of form) ,
Page 33
xm LAND USE SECTION FEES ary MONACO. : RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES , - ae : Material Change-of Use Eodelnpact “ES (Consisten) ingso 521 insistent 521 Assessment under Superseded Planning Scheme : 521 Modification to a Development Permit . . 521 Extension of a Currency Period ‘ 521 Operational Works - Landscaping 521 @ Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour , 522 ADVERTISING Purchase Advertised Applications 523 JETTIES Jetty Application Fee 524 Jetty Bond 51 (Category 4) BONDS Performance Bond 51 (Category 9) SIGNS Registration Fee , . 222 a FEE . Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ ‘ChHO¥3BS-.C0 NAME: Qirarcm Don netope wats ADDRESS: PO. Gar Py MEOSA ite aN ¢ FILENO: O71 | Sapre 2399 DATE: —— 27@fnlor RECEIPT NO: "38034 Signature of TP Officer: (2\ A-reare , AUTHORITY NO: Zz 13 / 2007 / expe g / | 1394 ¥ € ES Bets pooh be be. hep ete of,
Page 34
CALCULATION OF FEES APPLICATION | FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION 3 (4SSO OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Page 35
ioe
DEVELOPMENT FEES & CONTRIBUTIONS
(Cashier. Please Retum to Admin Officer, Development)
Lat
APPLICATION AND. GENERAL:FEES- ‘AMOUNT. | RECEIPT TYPE | BONDS - Bond Refund Details
Application Fees 24520 — 540 Payee Name:
Road / Drainage Plan Exam 541 Address:
Road / Drainage Field Inspection 542
Legal Document Examination aA70 543
Sealing Fee - Survey Plans, Legal Documents 544
Sale of Documents, Policy Lists, Misc 545 | CALCULATIONS ” |
Bonding Admin Fee (Contributions, uncompleted works) 546 Lot Calculation
Closed Circuit TV inspection 568 2 wes . 2350 Avery si3q “eo Do ‘a
Pre-lodgement Meeting Fee 549 Slots IGT Brecesy AO "
CONTRIBUTIONS. _ AMOUNT __|_RECEIPT. TYPE | Plan Examination Calculation
Developer Contribution ~ Landscaping 550
Developer Contribution - Road Other than PSP §53
Developer Contribution - Drainage Other than PSP 554
Developer Contribution --Pathway Other than PSP 685 Inspection Calculation
Developer Contrib. - In Lieu Off St Parking (PSP13 Car parking) 556
Developer Contribution - Other Parks and Community 580 ‘ROADWORKS CONTRIBUTIONS 3. ne
ICS - Community Land (Not currently active) 560 Catchment: :
{CS - Public Transport 561
ICS - Sewerage (PSP Rural) 657 Road/Section:
ICS ~ Sewerage (PSP Coastal) 613
(CS — Sewerage - South Peregian (PSP Maroochy) 681 | APPLICATION DETAILS - _ %y vee
ICS - Water Supply (PSP) 614 Payee Name:
ACS ~ Sport and Recreation Land (PSP Parks) §59 Address:
ICS - Drainage (PSP Noosaville Master & Ward Street) 581 :
ICS = Road (CMRNICP} If BA not entered then use 594 583
ICS - Pathway (PSP) 584 .
. : Development Location:
Total of Fees Paid (Excluding Bonds) $ 25500
CPI Date: J AMOUNT __| RECEIPT TYPE | File Numbers or Reference:
Security Deposits/Performance/Maintenance/Uncompleted Works Bond 51 (Cat 9)
Total of Fees Paid (Including Bonds) $ 25500 Date application properly made:
SS0be4
Receipt No:
| Receipt Date:
PJLand Developmenl/FEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc
Used in these records
07/2399 - MCU - Lot Reconfig & Detached Houses (27) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.