Skip to the record
Beware of cheap imitations.

Council archive · source document

07/2399 - MCU - Lot Reconfig & Detached Houses (27) [As Published] · 132007.2399

of 35

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part F, Version 2.0, 4 October 2004

   

Reconfiguring a lot E a

 

 

 

 

 

 

Comptetion of all applicable questions on Part F is mandatory for all applications involving the reconfiguring of a lot (including freehokt subdivision, community
title subdivision, subdivision by lease, etc.).
Nature of the application 1. This application is for: (tick one (1) or both # applicable)
A develo idisipeslisodsaeenany ical Development permit - provide details below eg. stage 1: freehold subdivision of 25 lots, realignment of a
inthe approval process and does not boundary, creation of an access easement) _
authorise development to occur. Two (2) staged residential subdivision; Stage 1: one (1) lot into two (2) lots and Stage 2:
one (1) lot into twenty-seven (27) residential lots and common property (Community Title
@ Scheme) and creating an access easement
AND/OR

( Preliminary approval -provite details below eg. stages 2, 3 and 4: freehold subdivision of 75 lots,
realignment of a boundary, creation of an access easement)

The subject land 2. Number of existing lots: [One (1)

The information requested in Q2 & 3 is
necessary for statistical and planning 3

. Total area of land in application: (if staged, total area of the land in this st
PUTBOSES. 62.45 hectares

4. How the subject land is identified in the planning scheme: (name the zone, precinct etc.)
| Special Facilities zone (under the superseded planning scheme) |

 

 

5. Current use of the land: (# vacant, also identify the previous use)
| Golf course, cub house, tennis courts, spa, fitness centre and vacant land ]
6. Are there buildings or structures existing on the land?
CNo
e@ [1 YES - complete Q7
Indicate which one of the following circumstances applies:

(All existing buildings and structures on the land will be demolished as part of the
development / redevelopment of the site; or

™

[ed Some existing buildings and structures on the land are proposed to be retained as part of

the development / redevelopment of the site - indicate on the plans prepared in response to Question
6 above, those buildings or structures proposed to be retained

@

Existing services on the land:(eg. water & sewerage) - attach plan identifying location if appropriate)
Water, sewerage, drainage, electricity and telecommunications - please refer to the
Engineering Report prepared by TATE Professional Engineers

 

 

 

 

wo

, Are there any existing easements over the land?
CINO

[IX] YES - attech plan identifying easement location & purposa

The proposal 10. Total area of land in the development pemit minus any balance area
The information requested in Q10-13 is [ 3.06 hectares

necessary for statisticat and planning
purposes.

 

 

11. Number of proposed lots: Twenty seven (27) residential lots, common property and a
balance lot

 

 

 

 

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2399 - MCU - Lot Reconfig & Detached Houses (27) [As Published].pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.