Council archive · source document
07/2399 - MCU - Lot Reconfig & Detached Houses (27) [As Published] · 132007.2399
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 State-controlled road matters 2. The application involves: ftick applicable boxes) For more information refer to Guide 3. 7 " . Unless you answered "none ofthe above" to 02, (0 (i) development on land contiguous* to a State controlled road and for the application triggers referral to the Department LO (a) material change of use assessable against the planning scheme; of Main Roads (OMA) as a referral agency. i In certain circumstances DMR will be an advice Ci (b) reconfiguring a lot unless - . agency, while in other circumstances OMR will « the total number of lots is not increased; and be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased: Scene 2 the IF Regulation wil asst youto Oo) operational work (not associeted with a material change of use assessable against the concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)— associated with access to a State-controlled road; or « for filling or excavation; or « involving the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a State-controlled road. (1 (ii) development on land not contiguous to a State-controlled road and - O(a) material change of use - * assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; UO (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation and exceeding the thresholds set by that schedule; [C1 (©) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) above)— « assessable against the local government's planning scheme; and « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule. [XI (iii) none of the above Clearing vegetation = 3. The application involves: (tick applicable box/es) For more information refer to Guide 12 . XX (i) material change of use - Pee eee (a) assessable against the planning scheme; a Lot Natural Resources and Sate (b) ona lot containing - ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or manager for the application, NRWisa « if there is no property map of assessable vegetation for the jot - remnant vegetation; enurrence agency forthe application in relation (c)_ where the existing use of the land is a rural or environmental use; and it you ticked 03() or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 referral to NRW for assessment regardless of El (ii) reconfiguring a fot - whether vegetation clearing is proposed of not. we (a) ona lot containing a category 1, 2 or 3 area shown on a property map of assessable vegetation or, if there is no property map of assessable vegetation for the lot, remnant vegetation; (b) where the size of the lot before the reconfiguration is 2 hectares or larger; (c) where 2 or more lots are created; and (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 D (iii) operational work - (a) for the clearing of native vegetation where the vegetation clearing is made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of Form 1 CI (iv) none of the above. Strategic port land 4. The application involves: For more information refer to Guide 11. It you Gicked (i) - te relevant Port Authority is the assessment manager for the application. If you ticked (ii) Queensland Transport is a concurrence agency for the application. O (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI Act) - complete Part | of Form 1 O (ii) a material change of use that is inconsistent with the land use plan approved under the TI Act for the strategic port land - complete Part | of Form 1 & (iii) none of the above 4 Land contiquous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land Is within 100m of the State-controtled road; or that is part of a future State- controiled road. Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2399 - MCU - Lot Reconfig & Detached Houses (27) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.