INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: ftick applicable boxes)
For more information refer to Guide 3. 7 " .
Unless you answered "none ofthe above" to 02, (0 (i) development on land contiguous* to a State controlled road and for
the application triggers referral to the Department LO (a) material change of use assessable against the planning scheme;
of Main Roads (OMA) as a referral agency. i
In certain circumstances DMR will be an advice Ci (b) reconfiguring a lot unless - .
agency, while in other circumstances OMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased:
Scene 2 the IF Regulation wil asst youto Oo) operational work (not associeted with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)—
associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (ii) development on land not contiguous to a State-controlled road and -
O(a) material change of use -
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
UO (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
[C1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
[XI (iii) none of the above
Clearing vegetation = 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12 . XX (i) material change of use -
Pee eee (a) assessable against the planning scheme;
a Lot Natural Resources and Sate (b) ona lot containing -
ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa « if there is no property map of assessable vegetation for the jot - remnant vegetation;
enurrence agency forthe application in relation (c)_ where the existing use of the land is a rural or environmental use; and
it you ticked 03() or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of El (ii) reconfiguring a fot -
whether vegetation clearing is proposed of not. we
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
D (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
CI (iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

It you Gicked (i) - te relevant Port Authority is the
assessment manager for the application.

If you ticked (ii) Queensland Transport is a
concurrence agency for the application.

 

O (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

O (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

& (iii) none of the above

 

4 Land contiquous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land Is within 100m of the State-controtled road; or that is part of a future State-

controiled road.

Page 2

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2399 - MCU - Lot Reconfig & Detached Houses (27) [As Published].pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.