NOOSA COUNCIL Capital Schedule
for the period ending 27 January 2021
Report run date: 27-Jan-2021 13:42:15
500956 501033 500956 - Shire Pathway Renewal Program Annual - W4Q 332,000 332,000 332,000 160,038 162,789 14,[email protected]%
500967 500994 500967 - Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades 195,000 358,137 358,137 1,939 5,706 13,[email protected]%
510037 501032 510037 - Noosa Heads Main Beach Boardwalk LED Lighting Renewal 120,000 120,000 120,000 1,016 1,016 49,[email protected]%
510050 501049 510050 - Peregian Beach Boardwalk - U&R 0 230,000 230,000 14,900 2,896 [email protected]%
510051 501050 510051 - Noosa Heads Sunshine Beach Road Pathway Lighting - U&R 0 150,000 150,000 150,000 16 110,[email protected]%
510068 501066 510068 - Cooroora Trail Loop and Trail Hub 0 0 0 0 8,805 3,[email protected]%
Total Pathways & Boardwalks 1,113,000 1,662,705 1,888,002 463,655 276,372 245,071 14.64%
510048 501047 510048 - Public amenities renewal and upgrade works - U&R 0 220,000 220,000 189,634 154,591 08 70.27%
Total Public Amenities 0 220,000 220,000 189,634 154,591 0 70.27%
500957 501021 500957 - Shire Bus Shelter Disabled Compliant Program Annual - PTIAP 250,000 250,000 250,000 29,101 11,074 08 4.43%
Total Public Transport Infrastructure 250,000 250,000 250,000 29,101 11,074 0 4.43%
500959 501035 500959 - Shire Reseal & Rehabilitation Renewal Program Annual 3,091,726 3,091,726 3,091,726 3,091,726 3,110,216 1,304,[email protected]%
510017 510017 510017 - Damaged Guardrail Renewals (Various) 0 25,768 25,768 25,768 2,759 39,[email protected]%
510022 §10022 510022 - Sunrise Beach, Tingira Cres Emergent Slip Repair 0 0 0 0 5,405 7,[email protected]%
510025 510025 510025 - Sunshine Beach, Ross Cres Emergent Slip Repair 0 0 0 0 18,233 08 0.00%
510038 501034 510038 - Shire Sealed Road Network Rehabilitation and Reconstruction 790,000 790,000 790,000 98,750 0 08 0.00%
510047 501045 510047 - Tewantin Bypass Stage 1 0 600,000 600,000 215,937 132,253 116,[email protected]%
Total Sealed Roads Network 3,881,726 4,507,494 4,507,494 3,432,181 3,268,866 1,467,327 72.52%
510063 501061 510063 - Tewantin Netball Courts Upgrade - U&R 0 310,000 310,000 297,330 238,176 84,[email protected]%
Total Sports Ground and Facilities 0 310,000 310,000 297,330 238,176 84,847 76.83%
500916 500920 500916 - Gympie Terrace Stormwater 600,000 600,000 40,000 5,807 5,907 7,[email protected]%
500960 500988 500960 - Shire Bioretention Basin Renewals Program Annual 0 72,190 72,190 13,124 2,113 2,[email protected]%
500972 500999 500972 - Noosaville, Project Ave Stormwater Drainage Easement Upgrade 200,000 237,324 237,324 4,502 14,350 08 6.05%
510039 501036 510039 - Sunrise Beach Sobraon Street Slope Stabilisation - W4Q &LRCI 915,346 915,346 915,346 56,755 63,823 32,[email protected]%
Total Stormwater Drainage 1,715,346 1,824,860 1,264,860 80,188 86,194 41,913 6.81%
500546 500546 500546 - Whole of Shire Forward Planning & Design Program - Construct 500,000 500,000 500,000 186,260 140,929 19,[email protected]%
Page 43 of 100See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.