Original source · versioned page text
Fencing Details URB-P0003847-000-SP-APPENDIX(2of2)-240719
Very large file (11.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ROOF ASSEMBLY
L/H Barge Cap
Ridge Cap
Roof Sheet
R/H Barge Cap
R/H Barge Cap
Ridge Beam
L/H Barge Cap
FIGURE 7.0
Use an adjustable spanner to turn up the pans at the ridge end of the Roof Sheets. This will prevent water flowing back under
the sheet (Figure 7.1).
Pan
FIGURE 7.1
Refer to the sheet layout below when installing Roof Sheets (Figure 7.2).
Sheet ‘Overlap’
Sheet ‘Underlap’
Roof Sheet
Sheet ‘Overlap’ towards
Roof Sheet the front of the Shed
FIGURE 7.2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.