180078 - Swimming Pool Stage 2 · 51901.3604.01
rev date issued details
A 17.07.18 AK Consultant Issue
Working Drawings
D.#. 01 02 03
Nominal W x H Size 1,200×2,200 4,295×2,200 1,690×2,200
Elevation
Operation Type Swing Surface Slider Double Swing
Glazing Clear Glass Clear Glass N/A
Finish Powdercoat Aluminium Powdercoat Aluminium Powdercoat Aluminium
Hardware Set Quaility Range Typically Quaility Range Typically Quaility Range Typically
Insect Screens N/A N/A N/A
To stack external over wall and window. Intergraled
Acoustic Ventilation
Notes aluminium reveal frame to external face of wall, allow for
Louvres:ACRAN or similar
structural supports as required.
D.#. 01 02 03
Size (W x H) 4,295×1,000 5,680×1,000 5,590×2,200
Elevation
Operation Type Fixed Fixed Louvres FIxed Louvres
Glazing Clear Glass N/A N/A
Finish Powdercoat Aluminium Powdercoat Aluminium Powdercoat Aluminium
Hardware Set N/A N/A N/A
Insect Screens N/A N/A N/A
Notes Acoustic Ventilation Louvres: ACRAN or similar Acoustic Ventilation Louvres: ACRAN or similar
legend
1. Glazing is to be free of embossed or transfer motifs unless required by window manufacturer, supplier, certifier or other. If required, allow for transfer motifs, 10mm wide band of frost tint with semi circular 14. All glazed elements must be sized to accommodate wind ratings determined by AS 4055 and nominated Structural Engineer
ends set in 60mm from window or door styles, positioned at typical motif height. Contractor to ensure motifs are not embedded within glazing. 15. Fit aluminium insect screens to all operable windows generally. Contractor to ensure all screens are removable (not fixed) for ease of window maintenance.
2. Door and Window Schedule shall be read in conjunction with Architectural Drawings. Any variations from this schedule must be notified to the Architect prior to ordering 16. Allow for retractable insect screens to all doors nominated with in the door/window schedule
3. Window & door sizes are nominal. Contractor to ensure windows and doors are fabricated to match exact framing / surround dimensions and allow for packing out of walls to accommodate door / 17. Contractor to allow for the supply and installation of ‘Prowler Proof Forcefield’ security screens to the doors/windows nominated in the door/window schedule (contractor to provide Architect with sample
window frame depths.. and discuss colour options prior to ordering).
4. Contractor to ensure that all window & door head heights are equal distance above finished floor level unless otherwise noted. 18. The following notation is used within the schedules for panels (as viewed from the outside; x = opening panel and o=fixed panel. Sliding doors shall use flush pulls and selected ‘D’ type handles. Standard
5. Contractor to provide Architect with all window and door order details and must wait for written confirmation from the Architect prior to placing order. moulded plastic ‘D’ handles shall not be used. Contractor to discuss handles with Architect prior to placing order.
6. All doors (and windows where applicable) to be keyed alike. 19. All louvre windows to be by ‘Breezeway’. Contractor to ensure louvre blades are 102mm wide to comply with BCA part 3.9.2 unless noted otherwise. Where louvres extend over 2100mm above finished
7. All fixings of windows and doors to be 316 grade stainless steel. floor levels, contractor to provide two aluminium poles fitted with a hook suitable for opening the louvre galleries. High louvre galleries to be fitted with an ‘eye’ mechanism suitable for use with a pole &
8. All windows and doors are to be ‘Commercial/Architectural Series’ aluminium framed section. Contractor to advise Architect if different section is required to achieve the type and size of glazing hook.
nominated in the schedule prior to ordering. Preference through out is for ‘slimline’ frames, maximising glass area. Options to be discussed with Architect. Frames to be high durability finish, suitable for 20. Where window openings occur over 1m above finished ground and do not have a balustrade the opening of the window must be limited to 100mm above finished floor level to allow for compliance with
environment, in selected colour unless noted otherwise. BCA 3.9.2 and 3.9.3 where applicable.
9. All external glazing to be low 'e' tinted glass. Thickness to glaziers specification.
10. All door sills to be set down unless noted otherwise. Contractor to allow for set down to timber joists & concrete slabs to ensure all doors opening onto external spaces finish flush with internal finished
floor level. Scheduled door heights do not allow for set downs.
11. Generally handles for all windows and doors are to be high-end fittings.
12. Colour to be confirmed.
13. Stacking doors to stack so that the are flush with the jamb offering full egress opening.
a: suite 6, 8 kingfisher drive, peregian beach, qld 4573
p: (07) 5471 3033 Resort Entry Alteration + Swimming Pool Scale 1:1, 1:100
sparks architects www.sparksarchitects.com
5 Quamby Pl, Noosa Heads QLD 4567 Culgoa Point Beach Resort 106 PO Door & Window Schedule WD 6.1
sparks architects pty. ltd. abn 89 124 611 721
qld architect's registration No. 3974 project client job no. drawn drawing dwg no.
GSPublisherVersion 10.188.1288.48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
180078 - Swimming Pool Stage 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.