Council archive · source document
RFI - Attachment 5 - Amended Stormwater Management Plan · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (11.6 MB): may take a few minutes to open.
Original PDF page 35, section 1. The text section number identifies this passage in the reader.
31 March 2023
BIORETENTION BASIN MAINTENANCE CHECKLIST
Inspection Frequency 1 to 6 Monthly Date of Inspection
Location
Description
Asset ID
Site Visit by
Inspection Items Y N Actions Required (Details)
Sediment accumulation at inflow points?
Litter within basin?
Erosion at inlet or other key structures?
Traffic damage present?
Evidence of waste dumping?
Vegetation condition satisfactory (health,
weeds etc)?
Watering of vegetation required?
Replanting required?
Mowing required?
Clogging of drainage points (sediment or debris)?
Evidence of ponding?
Damage/Vandalism to structures present?
Surface clogging visible?
Filling of surface required?
Drainage System inspected?
Resetting of system required?
Excellence with Economy in Engineering 21
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9300-
9399/9307/reports/31-03-23 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 5 - Amended Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.