31 March 2023
Approximately 140m2 of the access driveway, pavement and landscaped areas will bypass the
bioretention basins to allow the driveways to join neatly into the existing access road. The treated
areas will be over treated so the overall net water quality objectives are achieved for the
development.
Stormwater treatment will be implemented to remove sediments, nutrients, gross pollutants and
hydrocarbons in accordance with the requirements of Noosa Council and the State Planning Policy.
This development sits within a lot that has been allowed for in previous stormwater calculations,
therefore no detention is proposed for this development.
The proposed conceptual stormwater drainage layout is depicted on MPN Plan 9307-CP.1.01,
attached in Appendix 3.
5.4.2 Stormwater Quantity Management Strategy
The proposed development site will connect into the existing drainage system for the Noosa Civic
Subdivision. The sites minor flows will run through the existing pipe system whilst the major
overflows will overland flow down the internal roads prior to discharging to the Creek to the south
of the site. There will be no impacts to external properties as a result of the development flows
through the internal site system.
5.4.3 Stormwater Quality Management Strategy
In order to satisfy the requirements of the State Planning Policy July 2017 for the adequate
treatment of stormwater runoff, natural treatment solutions have been provided to remove
hydrocarbons, suspended solids and nutrients prior to being discharged from site.
5.4.3.1 Potential Pollutants Generated
The pollutants that could be potentially generated as a result of the development use are as
follows:
• Litter
• Sediment
• Nutrients (Nitrogen and Phosphorous)
• Hydrocarbons (oils and grease)
• Surfactants
• Pathogens/Faecal Coliforms (bacteria and viruses)
The MUSIC computer modelling program developed by the Co-operative Research Centre for
Catchment Hydrology was used to predict the performance of the proposed stormwater treatment
train.
At this stage the pollutants modelled in MUSIC are Total Suspended Solids (TSS), Total
Phosphorous (TP) and Total Nitrogen (TN).
Excellence with Economy in Engineering 8
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9300-
9399/9307/reports/31-03-23 stormwater management plan_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 5 - Amended Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.