Queensland S Government Author Caroline Plank Council Reference 2007/2399 Client Reference Precinct J NRW Reference 1C0108NAM0002_NO07610 Department of Directorate / Unit Planning & Development Natural Resources and Water Phone 07 5451 2408 mgs 7 February 2008 Chief Executive Officer Noosa Council PO Box 141 Tewantin QLD 4565 Attention Kerri Coyle Dear Sir APPLICATION FOR MATERIAL CHANGE OF USE AND RECONFIGURING A LOT ON LOT 3 $P178323 (LESLIE DRIVE, NOOSA HEADS) -— REFERRAL AGENCY RESPONSE The Chief Executive of the Department of Natural Resources and Water (NRW) advises that the Referral Agency Response for the application—prepared pursuant to section 3.3.16 of the Integrated Planning Act 1997—is enclosed. A copy of the Referral Agency Response has been sent to the applicant. : NRW looks forward to receiving a copy of the Decision Notice for the application in due course. Should you have any questions please contact Ms Caroline Plank on (07) 5451 2408, quoting the reference number !CO108NAMO0002. Yours sincerely a Ken Murray Principal Natural Resource Officer South East Region / Enc: NRW Referral Agency Response . Department of Natural Resources & Water Centenary Square Building, Currie Street, Nambour. Q 4560 PO Box 573, Nambour. Q 4560 Telephone + 61 7 5451 2222 Facsimile + 61 7 5451 2260 Website www.nrw.gid.gov.au ABN 83 705 539 586
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
Referral Agency Response 8 3.3.16 Integrated Planning Act 1997 1. Application information 1.2 Applicant’s name StarCo Developments Pty Ltd 1.3 Property description Lot 3 SP178323 1.4 Assessment Manager/Reference Noosa Council 2007/2399 1.5 Departmental Reference el VAS Case No: 2008/000104 File Ref. No: NOO7610 Trackjob No: ICO108NAMO0002 1.6 Type of development sought by the application Material Change of Use and Operational Works Concurrence Agency Matters Vegetation Management Act 1999 The chief executive of NRW would like to inform the assessment manager that NRW has no concurrence agency requirements in regard to the application. Reasons for the concurrence agency response NRW has assessed the application against the Concurrence Agency Policy for Material Change of Use (MCU) 23 August 2007/ Concurrence Agency Policy for Reconfiguring a Lot (RaL) 23 August 2007 and has determined that the application meets the requirements of Criteria Table B, because clearing as a result of the MCU/RaL will only occur— , e for an urban purpose in an urban area on freehold land e in remnant vegetation that does not contain an endangered regional ecosystem, where there is no PMAV for the area subject to the clearing. Advice Agency Matters State Planning Policy 2/02 - Planning and Managing Development Involving Acid Sulfate Soils (SPP 2/02) The Chief Executive of the Department of Natural Resources and Water provides the * following advice to the Assessment Manager on matters relating to State Planning Policy 2/02 — Planning and Managing Development Involving Acid Sulfate Soils (SPP 2/02). Outcome 1 of SPP 2/02 The SPP aims to ensure that development involving acid sulphate soils (ASS) be planned and managed to avoid potential adverse impacts on the natural and built environment and human health. With respect to development assessment, Outcome 1 must be achieved: "When undertaking development to which this SPP applies, the release of acid and associated metal contaminants into the environment is avoided by: ¢ not disturbing acid sulfate soils when excavating or otherwise removing soil or sediment, extracting groundwater or filling land; / « or treating and, if required, undertaking ongoing management of any disturbed acid sulfate soils and drainage waters.”
Page 3
If the disturbance of ASS cannot be avoided, the potential impacts of that disturbance must be treated and managed to: e neutralise existing acidity and prevent the generation of acid and metal contaminants; and e avoid releasing surface or groundwater flows containing acid and metal contaminants into the environment. The following advice is offered on whether the application demonstrates that the proposed development can achieve Outcome 1 of SPP 2/02. . Background ASS mapping’ shows part of the site in an area mapped as likely t to contain ASS, with the remainder low probability. Geology mapping shows the site as quaternary coastal wetlands. Surface elevations range from 1.5m to 9m AHD. The planning reports states that excavations below 5m AHD are not anticipated, however they are not able to rule this out due to exact details only being known once Council have approved and conditioned the application. Accordingly, they request that preparation of an ASSMP be imposed as a condition. The Engineering Report states that filling of the south west corner of the site will be required, with minimal earthworks in the remainder of the site to provide the cut to fill earthworks for the new roadworks profile, and infrastructure trenching. A lake appears to be proposed as part of the realignment of the 18" tee. ASS Investigation Report The following advice is offered on the preliminary ASS investigation undertaken iby Golder Associates and dated October 2007. NRW notes that the report is preliminary due to details of the proposed earthworks and buildings were not known at the time of reporting. The ASS investigation revealed the presence of ASS in the southwest corner of the site. With respect to SPP 2/02 and related guidelines’, the ASS investigation is deficient in the following areas: e the number of boreholes — 2 were tested as part of the ASS investigation - instead of 6; e the number of samples analysed - 6 in the two boreholes, instead of 6 per borehole. NRW support the proposal to drill 4 additional boreholes once more detailed information is available on the proposed development. In order for the ASS investigation to be consistent with SPP 2/02 and related guidelines, NRW recommend further ASS investigations which address the deficiencies detailed above. ‘ Acid Sulfate Soils - Tweed Heads to Nerang River. NR&M, 2003 > NR&M & DLGP, (2002) State Planning Policy 2/02 Guideline Ahern CR, Ahern MR and Powell 8 (1998). Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in Queensland. Department of Natural Resources, Indooroopilly. Ahern CR, McElnea AE and Sullivan LA (2004). Acid Sulfate Soils Laboratory Methods Guidelines. In Queensland Acid Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly. Dear SE, Moore NG, Dobos SK, Watling KM and Ahern CR (2002). Soil Management Guidelines. In Queensiand Acid Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly. Dear SE, Moore NG, Watling KM, Fahl D and Dobos SK (2004). Legislation and Policy Guide. In Queensiand Acid Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly, The Department of Natural Resources and Water ICO108NAM0002 . 20f5
Page 4
ASS Management Plan An ASS management plan (ASSMP) has not been undertaken, due to details of earthworks not being available, however basic management strategies have been mentioned in the ASS investigation. Referral Agency Recommendations NRW consider that the information provided with the application does not adequately demonstrate that the proposed development can achieve Outcome 1 of SPP 2/02. In order for the ASS investigation to be consistent with SPP 2/02 and related guidelines, NRW recommend further investigations as detailed above. This could be undertaken as a condition of approval. NRW recommend that an ASSMP be undertaken consistent with SPP 2/02 and related guidelines. This could be undertaken as a condition of approval. While NRW offers this advice under SPP 2/02, it remains the duty of care of the site owner not to cause Environmental Harm as defined under the Environmental Protection Act 1994. - . Third Party Matters The Chief Executive of the Department of Natural Resources and Water provides the following advice to assist the Assessment Manager to fully consider the application. Aboriginal Cultural Heritage Act 2003 NRW also takes this opportunity to advise Council of the responsibilities of applicants under the Aboriginal Cultural Heritage Act 2003. Council may wish to include this information as an Advisory Note on the Decision Notice issued for the application. Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage (the "cultural heritage duty of care"). Maximum penalties for breaching the duty of care are $750,000 for a corporation and $75,000 for an individual. Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if they are acting in accordance with cultural heritage duty of care guidelines gazetted under the Aboriginal Cultural Heritage Act 2003, available on the NRW website, or in accordance with an agreement with the Aboriginal party for the area or a cultural heritage management plan approved under part 7 of the Aboriginal Cultural Heritage Act 2003. Applicants are also-encouraged to undertake a search of the Aboriginal Cultural’ Heritage Database and the Aboriginal Cultural Heritage Register, administered by the Cultural Heritage Coordination Unit, Department of Natural Resources and Water. Application forms to undertake a free search of the Cultural Heritage Register and the Database may be obtained by contacting the Cultural Heritage Coordination Unit on (07) 3238 3838 or on the NRW website www.nnw.qid.gov.au/cultural heritage. . Authorised Delegate Signature Ao ~ Ken Murray Principal Natural Resource Officer The Department of Natural Resources and Water ICO108NAM0002 . 30f5
Page 5
a South East Region 7 February 2008 The Department of Natural Resources and Water ICO108NAMO002 4o0f5
Page 6
Glossary Clearing as a result of the MCU/RaL includes: e Clearing as a result of the MCU; and e Clearing as a result of the RaL. Clearing as a result of the MCU includes: e clearing of assessable vegetation that will result from the change in use, consisting of any of the following - clearing for infrastructure—including buildings, stormwater management systems, water supply and sewerage systems—that are proposed as part __ of the MCU application — clearing for roads, vehicle parking, vehicle and pedestrian access, utilities corridors, services, fences, firebreaks and fire management lines that are proposed as part of the MCU application - Clearing that may not be necessary for developing infrastructure but is associated with the use applied for. . And e clearing of assessable vegetation that will become exempt if the development application is approved. This includes any of the following examples — clearing for routine management and essential management purposes associated with the approved development including clearing to maintain proposed infrastructure, facilities, roads, access routes, utilities, services and fences, and clearing to maintain the safety of persons and property that will be associated with the development - clearing for necessary fire breaks and fire management lines associated with the development. This will be assessed as follows i. all built infrastructure other than underground services, roads and . fences will be assessed as requiring clearing for firebreaks with a width of 1.5 times the height of the tallest vegetation adjacent to the infrastructure, or 20m, whichever is the greater. However, evidence may be provided to NRW that confirms that an alternative firebreak width is required that is consistent with the State Planning Policy (SPP) 1/03 Guideline ii all proposed allotment boundaries will be assessed as requiring clearing for fire management lines with a width of 10m constructed. on either side of the allotment boundary, unless NRW is provided with evidence that confirms that an alternative width of fire management line is required or an alternative configuration of fire management lines are required that is consistent with the SPP 1/03 Guideline iii, in the case of evidence being presented that demonstrates alternative fire management guidelines as being sufficient and consistent with the SPP 1/03, NRW may condition the development so that the full extent of exempt clearing prescribed for essential management under Schedule 8 of the IPA cannot be carried out by current or future landholders ~ where there is a concurrent application for Reconfiguring of a Lot (RaL) for the same land that has not yet been decided—clearing as a result of the RaL as set out in the Ral Policy item 2 will be assessed. The Department of Natural Resources and Water ICO108NAMO0002 5o0f§
Used in these records
07/2399 - Referral Agency Response - DNRW (Concurrence & Advice) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 284 KB (small file)
- File type
No other editions are linked here.