220906_Noosa Council Ltr _Lot 9 OWA RFI · OPW22/0166

Attached to the e-mail OPW22/0166 - Response to Request for Information.

of 2

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

SETTLERS COVE

Noosa Council THE ESSENCL OF NOOSA STYL
PO Box I41
TEWANTIN QLD 4565

 

 

 

6 September 2022

By email

Dear Officer,

Re: Operational Works Application - OPW22/0166
Response to Information Request

Please refer the following responses in relation to Noosa Council Information Request
dated 25/07/22.

Item 1: Refer attached letter from Tectonic Geotechnical Engineers (19009-004-
Rev0 - 01/09/22) which outlines the results of further geotechnical
investigations of the site and verifies the suitability of the proposed rapid
infiltration pits.

Item 2: We note that the Settlers Cove site is quite uniform in geotechnical
formation being comprised of deep windblown dune sands over all sites
abutting Serenity Close.

We also note that all of the previous six (6) residential unit developments
completed by Cape Bouvard and of similar scale to that currently proposed
have employed Rapid Infiltration Pits (RIPs) as the primary and sole means
of stormwater disposal.

All RIPs installed have operated without reported issue or surcharge other
than a recent overtopping at Lumina Stage | which was traced back to
clogged pre-filters which had not been serviced as per the approved
Maintenance Plan; this has now been rectified by the body corporate.

Notwithstanding the above commentary Tectonic Geotechnical were
engaged to carry out further testing in the vicinity of the proposed RIPs and
provide geotechnical comment; refer attached report 19009-004-Rev0 RIP
Advice.

Civil engineering design has been amended to include a sheet pile wall
between the existing boulder retaining wall and RIPs as recommended by
Tectonic (refer attached Alta drawings A6107-22-EW01 to EW03).

Project Office Comer Banksia Avenue & Serenity Close. Noosa Heads Queensland 4567
PO Box 1923, Noosa Heads Queensland 4567. Telephone 1300 10 10 50 Facsimile 07 5448 0286 Email [email protected] www.settlerscove.com.au

 

ANOTHER QUALITY DEVELOPMENT ny py Care Bouy a
Full text of the other 1 page

Page 2

Item 3:

a) Refer attached amended architectural drawings 7200-A02-01 and
7200-A02-02 with template at Page 48 of AS2890.1 with a 2.4m
(minimum) carpark width (as determined User Class 1A Table 1.1 page and
Table 2.2 page 14) overlaid and demonstrating compliance.

b & c) The apartment allocation of the carparks is as noted on attached
architectural plans 7200-A02-01 and 7200-A02-02.

d) The double carparks are typical approved tandem carparks with both
spaces assigned to just one apartment.

e) Please refer to attached additional Drawings TPO! to TP A6107-22-
TPO1 to TP04 which demonstrate compliance.

We trust this information satisfies the requirements necessary to advance the operational
works application, though please don’t hesitate to contact the undersigned if required.

Yours sincerely,

CBD SETTLERS COVE PTY LTD
for andjon behalf of CAPE BOUVARD DEVELOPMENTS PTY LTD

/
v

dal

SHANNON GILLARD
DeVelopment Manager
Mobs.0406 752 259

[email protected]

Used in these records

About this file

File size
91 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

220906_Noosa Council Ltr _Lot 9 OWA RFI.pdf · 91 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.