SETTLERS COVE Noosa Council THE ESSENCL OF NOOSA STYL PO Box I41 TEWANTIN QLD 4565 6 September 2022 By email Dear Officer, Re: Operational Works Application - OPW22/0166 Response to Information Request Please refer the following responses in relation to Noosa Council Information Request dated 25/07/22. Item 1: Refer attached letter from Tectonic Geotechnical Engineers (19009-004- Rev0 - 01/09/22) which outlines the results of further geotechnical investigations of the site and verifies the suitability of the proposed rapid infiltration pits. Item 2: We note that the Settlers Cove site is quite uniform in geotechnical formation being comprised of deep windblown dune sands over all sites abutting Serenity Close. We also note that all of the previous six (6) residential unit developments completed by Cape Bouvard and of similar scale to that currently proposed have employed Rapid Infiltration Pits (RIPs) as the primary and sole means of stormwater disposal. All RIPs installed have operated without reported issue or surcharge other than a recent overtopping at Lumina Stage | which was traced back to clogged pre-filters which had not been serviced as per the approved Maintenance Plan; this has now been rectified by the body corporate. Notwithstanding the above commentary Tectonic Geotechnical were engaged to carry out further testing in the vicinity of the proposed RIPs and provide geotechnical comment; refer attached report 19009-004-Rev0 RIP Advice. Civil engineering design has been amended to include a sheet pile wall between the existing boulder retaining wall and RIPs as recommended by Tectonic (refer attached Alta drawings A6107-22-EW01 to EW03). Project Office Comer Banksia Avenue & Serenity Close. Noosa Heads Queensland 4567 PO Box 1923, Noosa Heads Queensland 4567. Telephone 1300 10 10 50 Facsimile 07 5448 0286 Email [email protected] www.settlerscove.com.au ANOTHER QUALITY DEVELOPMENT ny py Care Bouy a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Item 3: a) Refer attached amended architectural drawings 7200-A02-01 and 7200-A02-02 with template at Page 48 of AS2890.1 with a 2.4m (minimum) carpark width (as determined User Class 1A Table 1.1 page and Table 2.2 page 14) overlaid and demonstrating compliance. b & c) The apartment allocation of the carparks is as noted on attached architectural plans 7200-A02-01 and 7200-A02-02. d) The double carparks are typical approved tandem carparks with both spaces assigned to just one apartment. e) Please refer to attached additional Drawings TPO! to TP A6107-22- TPO1 to TP04 which demonstrate compliance. We trust this information satisfies the requirements necessary to advance the operational works application, though please don’t hesitate to contact the undersigned if required. Yours sincerely, CBD SETTLERS COVE PTY LTD for andjon behalf of CAPE BOUVARD DEVELOPMENTS PTY LTD / v dal SHANNON GILLARD DeVelopment Manager Mobs.0406 752 259 [email protected]
Used in these records
220906_Noosa Council Ltr _Lot 9 OWA RFI.pdfRelated documentApplication case desk ↗
About this file
- File size
- 91 KB (small file)
- File type
No other editions are linked here.