Council archive · source document
09/1474 - Preliminary Building Works [As Published] · 172009.1474
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
SECTION:
HERITAGE
Section it must ‘be ate or -all appl Sppliations that require ‘completion of the IDAS Assessment Checklist
141A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
[XJ No-Gotor.18 = (_] Yes
Sd reeset et ame Der crane Osho
1.4B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
[X] No - Goto 01.2 oa Yes
= wee ae renege Ne oe ee
[REMOVING QUARRY MATERIAL; WILDRIVERAREA
co sitlieaecate oe etd cee Be
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
LX No-Gotoar3 (_] Yes
ENVIRONMENTALLY. RELEVANT. ACTIVITY; WikD. RIVER AREAS
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
IX] No-Gotoa14 ([] Yes
2 erent esa “arsgnang sce sow . vias, mee
, ITS OF A PORT : wo. + FS &
14 Is any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
IX] No - Goto. at.5
0 Yes
& 2. table 2 tens
setts FISH HABITAT AREA <
a Jy
apek Bhece * se See
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
EX] No - Goto. 01.6
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
COMMUNITY INFRASTRUCTURE oof.
1.6 ls any part of the premises designated for community infrastructure?
DX] No - Goto 01.7
LJ Yes
IF Re
WASTE WATER MANAGEMENT
he at RAR Mab stem RAPES oF Neen MO EO om
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
w No -Endof Section? ([_] Yes
fle 7 fah'e 2 ten *
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1474 - Preliminary Building Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.