Council archive · source document
Decision Notice - 010.2005.00000136.001 [As Published] · 142005.136
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 8
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Landscaping
1. The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
approved plans of development. The approved plans are titled and numbered:-
1.1. Landscape Schedule dated 27 April 2007 prepared by Arbour Essence;
1.2. Hard Landscape, Project No. U 484, Drawing No. LD1, Revision 5, dated April 2007 prepared by
Arbour Essence;
1.3. Soft Landscape, Project No. U 484, Drawing No. LD2, Revision 5, dated April 2007 prepared by
Arbour Essence;
and may be amended by these conditions and annotations detailed on the approved plans.
2. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
be visible at all times to ensure prompt access in case of emergency
3. The applicant must implement and maintain the landscape construction in accordance with the approved
amended landscape plan, planting schedule and horticultural industry best practices.
4. All trees shall be planted a minimum of 1 metre from all underground services.
5. Provide 2 x Elaeocarpus reticulates (200mm pot size) in the southwestern corner of the site. Refer to the
approved landscape plans for amendments and details.
6. This Development Permit lapses if the development has not happened by 30 May 2009, unless
application to extend the currency is approved by Council.
Frontage Works, Access, Car Parking, Stormwater Disposal, Sediment & Erosion Controls and Excavation of the
Site.
7. The development shall be carried out in accordance with Engineering/Consultant drawings Nos.
1656-1A dated 17 April 2007 by Construction Hydraulics
14332(A)-D1 dated 11 March 2007 by SCG consulting Engineers
0613-WD101E dated 15 December 2006 by Middap Ditchfield
or as modified herein.
8. Roof and surface runoff connection to Council’s drainage system shall be as shown on drawing No. 1656-
1A. Care must taken during construction with clearances from Council’s sewer main and Energex power
pole. Please note Council’s sewer is located in the footpath (location shown on drawing No. 1656-1A is
incorrect) and levels must be checked prior to laying pipe across the footpath.
9. Stormwater drainage line in the Peregian Esplanade pavement shall be backfilled with 300mm depth of
leanmix concrete. The pavement shall be restored with 30mm depth of asphaltic concrete (AC) surface to
match existing pavement levels.
10. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
These devices are to remain in place during the civil works and construction phases of the development.
The location and type of device to be installed shall be established at the “pre start” meeting with
Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@10083a36\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2005.00000136.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 34 KB (small file)
- File type
No other editions are linked here.