Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 1 - Noise Report ANV

Attached to the e-mail Response to Submissions, Accoustic Report, Amended Proposal Plans, Ext to Decision Period - MCU17/0073.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

                      Figure 4 Lower Ground Floor Plan - Existing and New Alterations




   Noise generated by the proposed alterations will include:

          people inside the worship centre;
          people inside the offices;
          people inside the meeting room on the lower ground level;
          people on the friendship terrace; and
          air conditioning plant.


   Worship Centre, Offices and Meeting Room
   The worship centre will be used for worship services for the school and the congregation. The noise levels
   inside the worship centre will be the same as the services that are held in the existing naturally ventilated
   church building. While the worship centre will be closer to the residential boundary, it will be air conditioned

Acoustics Noise Vibration                                 7                            0145 GSL Church Alterations Rpt 02
Log in to download the original file

Attachment 1 - Noise Report ANV.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.