Original source · versioned page text
Delegated Report - Code - Planning OPW25 0121 (As Published)
a. Delineate all planting to grassed area interfaces with a minimum spade cut edge.
b. Ensure amenity or sales signage and ancillary infrastructure is not installed within the
road reserve.
c. Ensure permanent irrigation is not installed within the road reserve.
d. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
foreign matter including anthropogenic waste, rock, soil/sediment contamination and is
applied to all planting areas to ensure a minimum 100mm depth once settled.
*(Refer to Advisory Notes)
61. Public amenity trees* must:
a. Meet AS2303 Tree Stock for Landscape Use
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
c. Be located from services and infrastructure a minimum of:
ii. 6m from electricity poles and pillars.
iii. 4m from street lighting.
iv. 2m from stormwater catchment pits.
v. 2m from any adjoining driveway.
*(Refer to Advisory Note)
62. Turfed areas must be must be free of pest, diseases and weeds and level with adjoining
surfaces.
Covenant Area Rehabilitation
63. Covenant Area Rehabilitation works must be supervised, undertaken and certified by
qualified persons*. All works must be completed in accordance with this Decision Notice and
the approved Covenant Rehabilitation Plan.
*(Refer to Advisory Notes)
Covenant Area Fencing
64. Fencing of the covenant areas must be in accordance with the approved Covenant
Rehabilitation Plan.
VEGETATION PROTECTION
Retention of Existing Trees and Vegetation
65. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
Vegetation Clearing
66. Fauna or fauna habitat relating to minor approved tree removal/clearing works must be
managed by a qualified person*.
*(Refer to Advisory Note)
67. All tree and vegetation removal works must be undertaken by a qualified person*.
*(Refer to Advisory Note)
Fauna Management
68. A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance with the approved Fauna Management
Plan; and the Nature Conservation Act 1992.
Page 16 of 22
Document Set ID: 24187118
Version: 9, Version Date: 04/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original