Council archive · source document
Response to Information Request - REC13/0015
Very large file (44.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
pathway, kerb & channel, driveways and parking bays. Please note that the
works will require a strip of land to be added to Lake Macdonald Drive road
reserve.
4. Please find attached a copy of Plans prepared by Callaghan & Toth (drawing
numbers 1225-04 & 05) showing details of the long section of Lake
Macdonald Drive and sections along the frontage including elevations of the
proposed driveways.
HYDRAULICS AND WATER QUALITY
5. Please find attached a Flood Search Certificate for the subject property (Ref:
Advanced Flood Search Certificate, 7 March 2013) .The Q100 inundation has
been added to the aforesaid Plan of the proposed Lot layout (Ref: 10-
3032A12)
6. Please find attached a Stormwater Management Plan for the development
prepared by Callaghan & Toth (Ref: Callaghan & Toth Stormwater Master
Plan 2013).
Please note that this submission completes our response to your Information
Request.
I thank you for your consideration in this matter.
~L
Max Watterson
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 44.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.