Callaghan & Toth
1. Bioretention Basin has been placed in a proposed Drainage Reserve adjacent to Lake
MacDonald Drive. One (1)bio-retention basin is proposed with an area of 25m2. It has
layer depth of 0.5m and an extended detention depth of 0.3m. The size and
a filter
depth of the systems have been designed in accordance with Figure 4.2. The bio-
retention basin drains to a gully within the site.
4.2.3 Rainfall Data
The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/92-
31/12/01. The choice of the data was based on the mean annual rainfall for Cooroy being
similar to the mean annual rainfall for Lake MacDonald Drive:
The mean Annual Rainfall for Cooroy 92 -
02 = 1585mm
The MUSIC Modelling Guidelines for South East Queensland -
Version 1 December 2010
details that Cooroy data for 1973 to 1983 should be used. This data has an annual average
Rainfall of 1600mm. It is considered that the 10 year period from 1992 2002 has a relatively
-
close mean annual Rainfall to the recommended 10 year period and as such is acceptable to
use in this case.
4.3 MUSIC Modelling Results
The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC Version 5 is capable of incorporating rainwater
re-use in the model. These features have been used in making comparisons between different
stormwater management systems for this report.
4.3.1 Water Quality Objectives
This model meets the pollution load reduction target as detailed in Water by Design Deemed to
Comply Solutions Storm water Quality Management (South East Queensland) version 1.0-
-
Table A-2. The following have been included in Appendix 2.
. The treatment train effectiveness for the system.
. The MUSIC Version 5 Summary Report.
The information above indicates that the new lots will achieve reductions in pollutant loads as
detailed in Table 4.2 below.
TABLE 4.2: COMPARISON OF LOAD REDUCTIONS
Parameter MUSIC POLLUTANT
REDUCTION LOAD
RESULT REDUCTION
TARGETS
Flow 1.4%
Total Suspended Solids 94.7% 80%
Total Phosphorous 73.6% 60%
Total Nitrogen 60.9% 45%
11
55 Lake MacDonalld Drive -
Stage 1 SMP Revl.doc May 2013 1225
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 44.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.