 APPENDIX 1:                    Preliminary Stormwater Quality Management Plan
                                        EROSION AND SEDIMENT CONTROL PROCEDURES
                                                                                                                                                        -
                                                                                                                -   -                               -   .   ~_..-
                                                                                               -,                             ’~   ._-~                             -’-




                                                                    Construction Phase


Objective   Minimise erosion of soils during civil works construction.

            Minimise loss of sediment from site during civil works construction.

            E&SC measures shall be designed to achieve discharges from the construction site during rainfall events (1 year ARI) to meet the following
            criteria:

                 ~      pH 6.5 to 8.5
                 ~      Suspended Solids < 50mg/L (80th percentile)
            Turbidity to be calibrated.

            Description                                                                                  Responsibility            Timeframe


            .   Install construction fencing to ensure works only occur within designated area.          .   Foreman               .      Prior   to          works
Actions
            .   Establish a single stabilised entry / exit point.                                                                         commencing
            .   Trucks shall use designated entry to site works areas and shall be washed down at a      .   Foreman               .
                                                                                                                                          Ongoing
                prior to exiting the site.
            .   Undertake drainage control measures including:                                           .   Foreman               .
                                                                                                                                          Ongoing
                           -

                                Bypass ’clean’ up-slope water around any soil disturbances
                           -
                               Transport stormwater through the work site in a non-erosive manner
                           -
                                Minimise hydraulic damage to the adopted erosion and sediment control
                                measures     during storm events.
            .   Undertake erosion control measures including:                                                                      .
                                                                                                                                          Ongoing
                           -
                                Limit the area of exposure
                                                                                                         .   Foreman
                           -
                                Progressive stabilisation of disturbed areas with native groundcovers
                           -
                                Heavy mulch to cover on disturbed areas open without activity for more
                               than 20 days
            .   Undertake sediment control measures including:                                                                     .
                                                                                                                                          Ongoing

Used in these records

About this file

File size
44.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - REC13_0015.pdf · 44.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.