Council archive · source document
Response to Information Request - REC13/0015
Very large file (44.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
)
,.
PRE DEVELOPMENT Q10 Cooroy stg 1 noosa to-Year Duration=6 min, Inten=20B.9 mrn/hr
Prepared by {enter here}
your company name Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment 2S: lots 1 to 4 less roof+dve
[48]Hint: Peak<CiA due to short duration
Runoff = 0.05663 [email protected] hrs, Volume= 0.027 MI, Depth= 13 mm
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Area (m2) C Description
2,195.0 0.74 LIGHT GRASS ON clay
2,195.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (meters) (m/m) (m/sec) (m3/s)
10.0 Direct Entry, GRASS OVER clay
Subcatchment 2S: lots 1 to 4 less roof+dve
Hydrograph
’IRunoff~
-
I/)
;;;-
E
-
3:
..2
LL
o 1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 44.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.