Council archive · source document
Response to Information Request - REC13/0015
Very large file (44.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Duration=10 min, Inten=173.2 mrnlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment 2S: lots 1 to 4 + road
Runoff = 0.15029 [email protected] hrs, Volume= 0.109 MI, Depth= 29 mm
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=10 min, Inten=173.2 mm/hr
Area (m2) C Description
3718.5 0.84 road+lots
3,718.5 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (meters) (m/m) (m/sec) (m3/s)
6.0 Direct Entry, lots+road
Subcatchment 2S: lots 1 to 4 + road
Hydrograph
II Runoff~
-
III
;:;-
E
-
~
u:::
C=O.84
1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 44.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.