Council archive · source document
Response to Information Request - REC13/0015
Very large file (44.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
.
PRE DEVELOPMENT Q100 Cooroy stg noosa 100-Year Duration=6 min, Inten=301.0 mmlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method Pond routing by Stor-Ind method
-
5ubcatchment 25: lots 1 to 4 less Runoff Area=2,195.0 m2 0.00% Impervious Runoff Depth=21 mm
Tc=10.0 min C=0.88 Runoff=0.09704 m3/s 0.047 MI
5ubcatchment 55: Existing roof+drive area Runoff Area=276.0 m2 0.00% Impervious Runoff Depth=37 mm
Tc=6.0 min C=0.90 Runoff=0.02080 m3/s 0.010 MI
5ubcatchment 65: existing road Runoff Area=1,247.5 m2 100.00% Impervious Runoff Depth=41 mm
Tc=6.0 min C=1.00 Runoff=O.1 0445 m3/s 0.051 MI
Reach 4R: (new Reach) Inflow=0.22229 m3/s 0.108 MI
Outflow=0.22229 m3/s 0.108 MI
Total Runoff Area = 0.3719 ha Runoff Volume = 0.108 MI Average Runoff Depth 29 mm=
66.45% Pervious = 0.2471 ha 33.55% Impervious 0.1248 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 44.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.