Council archive · source document
Response to Information Request - REC13/0015
Very large file (44.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
PRE DEVELOPMENT Q100 Cooroy stg noosa 100-Year Duration=6 min, Inten=301.0 mmlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment 55: Existing roof+drive area
Runoff = 0.02080 [email protected] hrs, Volume= 0.010 MI, Depth= 37 mm
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 100-Year Duration=6 min, Inten=301.0 mm/hr
Area (m2) C Description
276.0 0.90 existing roof+DVE
276.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (meters) (m/m) (m/sec) (m3/s)
5.0 Direct Entry, existing roof
5.0 0.0 Total, Increased to minimum Tc = 6.0 min
Subcatchment 55: Existing roof+drive area
Hydrograph
II Runoff~
-
~
E
-
~
o
LL
o 1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 44.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.