Council archive · source document
Response to Information Request - REC13/0015
Very large file (44.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
.
Post DEVELOPMENT Q100Cooroy st noosa 100-Year Duration=10 min, Inten=250.8 mmlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method -
Pond routing by Stor-Ind method
5ubcatchment 25: lots 1 to 4 + road Runoff Area=3,718.5 m2 100.00% Impervious Runoff Depth=51 mm
Tc=6.0 min C=1.00 Runoff=0.25908 m3/s 0.188 MI
Reach 2R: (new Reach) Inflow=0.08122 m3/s 0.030 MI
Outflow=0.08122 m3/s 0.030 MI
Reach 3R: (new Reach) Inflow=0.15147 m3/s 0.158 MI
Outflow=0.15147 m3/s 0.158 MI
Pond 2P: 47sqm Bioretention Peak Elev=102.578 m Storage=0.035 MI Inflow=0.25908 m3/s 0.188 MI
Primary=0.08122 m3/s 0.030 MI Secondary=0.15147 m3/s 0.158 MI Outflow=0.23270 m3/s 0.188 MI
Total Runoff Area = 0.3719 ha Runoff Volume = 0.188 MI Average Runoff Depth 51 mm=
0.00% Pervious = 0.0000 ha 100.00% Impervious 0.3719 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 44.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.