RFI - Attachment 6 - Amended Civil Engineering Report · MCU22/0094
Very large file (15.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
31 March 2023
11 GAS
There is no existing gas infrastructure in the vicinity of the site.
12 CODES
The following Noosa Shire Council Planning Codes have been addressed as part of this
development. These code responses are attached in Appendix 5.
• Earthworks;
• Existing Service Code;
• Erosion and Sediment Control; and
• Water Sensitive Design.
13 CONCLUSION
This Civil Engineering Report demonstrates that under the proposed plans, the development will
be adequately serviced for sewer and water from the proposed connections to the infrastructure
mains. Electricity and telecommunications will be provided to the lots with connections undertaken
in accordance with the requirements of the relevant authorities.
A new water connection will be made to the existing water main to the South-West of the site. A
new 1.5kL roof water tank will capture adequate rainwater to service toilet flushing for the
development year-round.
A new sewer connection to the existing manhole in the south west corner of the site will be
provided to service the development.
Access to the site will be from the future development road network for the site. All internal
roadworks completed on site, will be undertaken in accordance with the relevant Noosa Shire
Council and Australian Standards.
All earthworks undertaken on site will be compliant with all relevant Australian Standards to
minimise environmental impacts.
14 LIMITATONS OF REPORT
MPN have prepared this report for the proposed childcare centre development at Lot 4, Noosa
Business Centre, Eenie Creek Road Noosaville in accordance with MPN’s proposal to Stockwell.
This report is provided for the exclusive use of Stockwell for this specific project and its
requirements. It should not be used or relied upon by a third party and MPN accept no
responsibility for the use of this report by any party other than Stockwell.
Excellence with Economy in Engineering 9
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9300-
9399/9307/reports/31-03-23 civil engineering report_issue c.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 6 - Amended Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.