EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solution
Noosa Childcare Centre Lot 4
11 May 2022
            PERFORMANCE OUTCOMES                                                    ACCEPTABLE OUTCOMES                                               RESPONSE

Erosion and drainage control, sediment capture and stormwater runoff

PO1                                                              AO1.1                                                           RO1
Development design, density, layout, and staging                 Construction works are designed, planned and executed           All Erosion and Sediment control for construction
provide for erosion control, drainage control and                with respect to the principles of erosion reduction,            activities will be completed in accordance with the
sediment capture and treatment during the                        drainage management and sediment capture in                     IECA guidelines. Further information is provided within
construction phase.                                              accordance with Appendix 2, Table A of the Queensland           the stormwater management plan.
                                                                 State Planning Policy and
                                                                 International Erosion Control Association Best
                                                                 Practice Erosion and Sediment Control
                                                                 (BPESC) 2008;
                                                                 AND
                                                                 AO1.2
                                                                 Construction works are designed and managed to
                                                                 restrict the extent of clearing and soil exposure to that
                                                                 necessary for access, and safe construction;
                                                                 AND
                                                                 AO1.3
                                                                 Clean stormwater is diverted or managed around or
                                                                 through the site without increasing the concentration of
                                                                 total suspended solids or other contaminants in the flow
                                                                 and without causing erosion (onsite or offsite);
                                                                 AND
                                                                 AO1.4
                                                                 Cleared areas are effectively stabilised prior to rainfall if
                                                                 works are delayed or works are
                                                                 not intended to occur immediately;




l:\9000-9999\9300-9399\9307\codes\11-05-22 erosion and sediment control code.docx

Used in these records

About this file

File size
15.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment 6 - Amended Civil Engineering Report.pdf · 15.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.