Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 24 April 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/170
Street address: 8 Egret Street Peregian Beach
Real property description: LOT: 293 P: 93112
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Material Change of Use - 08/0170 Multiple Housing Type 2 - Duplex
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Permit is 4 years from the date that this development
approval takes effect.
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are titled and numbered Site Plan – SK
1.1, Basement – SK 1.2, Ground Floor – SK 1.3, Upper Floor – SK 1.4, Roof Plan SK 1.5,
South Elevation – SK 2.1, East Elevation – SK 2.2, North Elevation – SK 2.3, West Elevation –
SK 2.4, Section A – SK 3.1, Section B – SK 3.2, Section C – SK 3.3 and Height Line Analysis
– SK 4.1 prepared by Sparks Architects and dated 31.01.08 and as may be amended by these
conditions.
Page 1 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
-2-
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting or other emissions.
3. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing to be setback 2 metres. The area of land between the fence and the front
property boundary shall be densely landscaped to screen any fencing.
4. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use.
5. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
be completed prior to the premises being occupied and maintained at all times thereafter. The
landscape plan shall clearly indicate the planting of:
5.1. Screening vegetation in the form of native trees and understorey plantings along a
portion of the southern property boundary between the fence and building wall to
ensure the visual amenity and privacy of the public pathway.
5.2. Dense screening vegetation in the form of native trees and understorey planting
adjacent to the eastern facade of each dwelling. This planting shall minimise the
visual impact of the dwellings upon the Egret Street streetscape.
5.3. One significant native tree (minimum 100 litre) adjacent to the south-eastern corner of
the southern dwelling, to minimise the visual impact of this dwelling on the Egret Street
streetscape.
5.4. Additional vegetation in the road reserve between the eastern boundary of the site and
Egret Street. Any grass provided shall be couch, free of weeds.
5.5. The Hoop Pine located on the north-eastern boundary of the site is to be retained and
as such, the stormwater pipe shall be relocated away from its root system.
6. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
6.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
6.2. Disposal for firewood.
6.3. Disposal for landscaping purposes.
6.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
6.5. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
6.6. The Applicant is advised that burning off is an unacceptable method of disposal.
7. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
8. The development shall not exceed a maximum height of 2 storeys and 8 metres above natural
and finished ground level.
9. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface required by the Planning Scheme.
Page 2 of 16
Page 3
-3-
10. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation rating System as defined by the AS/NZS 6400 (Water
Efficient Products – Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2). All tap ware and shower roses shall not exceed a maximum flow
of 9 litres per min. Dishwashers and washing machines are excluded from this requirement.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
12. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
13. The Development Permit for a material change of use of premises lapses if the use has not
happened by 24 April 2012, unless an application to extend the currency is approved by
Council.
14. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Land Development
Vehicle Access
15. A vehicular access driveway to serve the development shall be constructed from the Egret
Street frontage of the site with a maximum width of 3.0m.
16. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
17. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated fencing or vegetation near the driveway shall comply with the
minimum sight line requirements as defined in AS2890.1, section 3.2.4. The applicant shall
demonstrate compliance by illustrating these sight lines on the plans submitted for both
Operational Works approval and Building Works approval.
18. All vehicles shall enter and leave the site in a forward direction.
Car Parking
19. Carparking shall be provided within the site generally as shown on drawing number SK 1.1
prepared by Sparks Architects and dated 31 January 2008, except as modified herein.
20. The “guest” spaces shown on drawing number SK 1.1 prepared by Sparks Architects and
dated 31 January 2008 are to be relocated and aligned such that vehicles can access the
space in a forward gear, reverse out and exit the site in a forward gear in a total of 3
movements. The applicant shall demonstrate compliance by illustrating the vehicle paths on
the plans submitted for both Operational Works approval and Building Works approval.
21. The landscaping internal to the site adjacent to the driveway shall be designed such that the
vegetation does not impede sight lines for the vehicles manoeuvring within the site. The
applicant shall demonstrate compliance by illustrating these sight lines on the plans submitted
for both Operational Works approval and Building Works approval.
Page 3 of 16
Page 4
-4-
22. A minimum of 1 uncovered carpark space and 2 covered carpark spaces shall be provided on
site.
23. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.2m.
24. All “guest” or “visitor” spaces shall be clearly defined by line marking and sign posting each
space with appropriate similar wording. The type and extent of the line marking and sign
posting shall be clearly shown on all plans submitted for Operational Works approval.
25. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Vegetation Protection & Preservation
26. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Frontage Works
27. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Egret frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping
Plants & Guidelines. Grass shall be couch, free of weeds.
28. All driveways and parking areas shall be designed and constructed to ensure pedestrian
safety using non-slip materials, to produce an evenly graded surface finish, and to be in
accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design
for Access & Mobility.
29. The full length of the Egret Street frontage of the development site shall be upgraded by
providing kerb & channel. All associated and ancillary work including pavement correction to
the existing pavement, drainage works, modification of the footpath, and adjustments to the
existing infrastructure shall be undertaken to complete the frontage widening.
In this regard a specifications and plans detailing this work shall be prepared and submitted to
Council for approval prior to obtaining a Development Permit for Operational Works.
30. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
31. Roof Water & Stormwater Drainage of the development shall be generally as shown on
drawing number 1901-2 prepared by Construction Hydraulic and dated 20 March 2008, except
as modified herein.
32. The alignment of the drainage line and the location of the proposed connection manhole shall
be revised such that the direction of flow is consistent with Council’s existing line.
33. The amount of cover over the new drainage lines and the vertical and horizontal clearances to
the existing services in Egret Street shall be in accordance with Council standards or the
relevant authority guidelines. These clearances are to be clearly shown on any plans
submitted for Operational works approval.
Page 4 of 16
Page 5
-5-
34. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
(minimum storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank
is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
internal to the dwelling. All rainwater tanks are to be designed and installed in accordance
with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
of the plumbing application in conjunction with the building approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
Operational Works approval and any overflow shall be directed to the stormwater drainage
system.
35. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
existing drainage structures in Egret Street. Plans of the drainage design shall be prepared by
a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
36. The retaining walls and fencing proposed along the western boundary of the site shall be
designed and constructed such that they do not impede, concentrate or redirect overland flow
from the adjoining upstream properties onto any adjoining properties or to Council’s pathway.
The type of wall and fencing shall be clearly shown on the plans submitted for Building Works /
Operational Works approval.
37. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
provided on site prior to being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestor/gross pollutant trap, which shall be submitted to the Council for approval prior to
obtaining a Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
38. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
39. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
40. The existing sewer main that is located in the adjoining property at the rear, the side and the
front of the site and the ‘zone of influence’ (taken as the area within a 45-degree angle
measured from the invert of the sewer main to the finished surface level) shall be accurately
located and determined by a licensed Surveyor and shown on all plans submitted for
Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
As such the applicant shall amend Operational Works plans including Building plans to ensure
compliance.
Page 5 of 16
Page 6
-6-
Town Water Supply
41. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
42. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
43. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
44. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
shall be served by:
44.1. A single Body Corporate water meter to measure the total water consumption
(including fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
44.2. Individual water meters to each tenement capable of being separately rated, and
44.3. A fire service (fully testable single detector check with metered bypass), where
applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
reels).
Service Easements (Sewer)
45. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer main
and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide
overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans submitted
for Operational Works / Building Works approval. To this extent the surveyor shall certify that
the sewer and the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
46. No building or other structure shall be constructed or encroach over an easement.
Earthworks
47. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the additional ponding of water
on any adjoining lands or the blockage of, or interference with, any natural watercourses.
48. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site. Fences that are
affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification.
In this regard any fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
Page 6 of 16
Page 7
-7-
Site Stability
49. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or lands, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
50. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
51. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $3,034
PSP16 – Sewerage Headworks Contributions $7,460
PSP17 – Water Supply Headworks Contributions $4,725
PSP20 – Pathway Trunk Network Contributions $1,364
TOTAL Contribution Amount = $16,583
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the trading bank guarantee will be returned.
General
52. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
Page 7 of 16
Page 8
-8-
53. Digital detailed designs including drawings, calculations, specifications etc, shall be submitted
with any application for a Development Permit for Operational Works in respect of roadworks
and stormwater drainage works. The design shall be in accordance with Council’s Planning
Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks.
To avoid conflict with underground pipes or services, all existing and proposed services
required by the development shall be shown on the plans.
54. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
55. A construction management plan/strategy to ensure no damage occurs to Council services
shall be prepared by a suitably qualified Registered Professional Engineer and submitted to
Council in conjunction with any application for Operational Works.
56. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
57. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
58. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
59. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Environmental Health
60. The developer must provide a suitably screened imperviously paved area large enough for all
refuse and recycling containers.
61. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
fines apply for such offences.
62. Noise emission from air conditioning equipment shall comply with the following requirements:
62.1. The equipment shall be installed and located in a manner which prevents noise
nuisance beyond the subject land in accordance with the nuisance provisions of the
Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of
Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
62.2. Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at the nearest residential boundary. This is
required immediately after installation of the equipment and prior to any occupation of
the building, and in a format approved by Council.
62.3. A person must not use equipment on any day if it makes or causes noise to be made–
62.3.1. Before 7am or after 10pm: More than the lower of either –
Page 8 of 16
Page 9
-9-
40 d(B)A
3 d(B)A above the background noise level
62.3.2. From 7am to 7pm: More than the lower of either –
50 d(B)A
5 d(B)A above the background noise level
From 7pm to 10pm: More than 3 d(B)A above the background noise level
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Unexploded Ordnance Concurrence Environmental GPO Box 27771 Brisbane
Agency Protection Agency Qld 4001
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
SK1.1 Site Plan 31.01.08
SK1.2 Basement 31.01.08
SK1.3 Ground Floor 31.01.08
SK1.4 Upper Floor 31.01.08
SK1.5 Roof Plan 31.01.08
SK2.1 South Elevation 31.01.08
SK2.2 East Elevation 31.01.08
SK2.3 North Elevation 31.01.08
SK2.4 West Elevation 31.01.08
SK3.1 Section A 31.01.08
SK3.2 Section B 31.01.08
SK3.3 Section C 31.01.08
SK4.1 Height Line Analysis 31.01.08
1901-2 Roof Water & Stormwater Drainage 20.03.08
Page 9 of 16
Page 10
- 10 -
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
Existing Development Approved Development
Existing Use Class Approved Use Class
Existing Quantity Approved Quantity
/ Use / Use
Multiple Housing -
Detached House Vacant Land 2 x 3 Bedroom Units
Type 2 – Duplex
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $3,875 and is subject to variations in the Consumer
Price Index, All Groups Brisbane from December 2007 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
4. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
4.1. On a Sunday or public holiday, at any time; or
4.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
5. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
course. On the spot fines apply for such offences.
6. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
Page 10 of 16
Page 11
- 11 -
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
Not Applicable.
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
A preliminary approval under section 3.1.6 of Integrated Planning Act 1997 has been granted and as
such the level of assessment and applicable codes for any development approval resulting from this
approval are identified in the conditions.
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Building Works Duplex Dwelling
Operational Works Landscaping, Carparking & Access, Frontage Works,
Stormwater Drainage & Erosion and Sediment
Control.
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not Applicable.
12 SUBMISSIONS
Not Applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
Page 11 of 16
Page 12
- 12 -
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Murray Bell
PLANNING OFFICER
Page 12 of 16
Page 13
- 13 -
List of Submitters
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
<
Page 13 of 16
[OCR of page images]
-13-
Sunshine Coast _ List of Submitters
‘ 3 INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Regional Council
Page 13 of 16
Page 14
- 14 -
Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
<
Page 14 of 16
[OCR of page images]
-14-
j Referral Agency Conditions
S U N 3 h | N € C oast INTEGRATED reagan cy. 1997 & 1998 REGULATION
Regional Council
Page 14 of 16
Page 15
- 15 -
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
(5) If an application is processed under section
The following is an extract from the Integrated 6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4). application are available only for the aspects of the
development that would have required public
Division 8 - Appeals to court relating to
notification under the repealed Act.
development applications
Appeals by applicants (6) If an application involves assessment
4.1.27.(1) An applicant for a development against a concurrence agency code, appeal rights
application may appeal to the court against any of for submitters for the application are not available
the following- against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application; Appeals by advice agency submitters
(b) a matter stated in a development approval, 4.1.29.(1) An advice agency may, within the limits
including any condition applying to the of its jurisdiction, appeal to the court about the
development, and the identification of a code giving of a development approval for a
1
under section 3.1.6; development application if-
(c) the decision to give a preliminary approval (a) the development application involves impact
when a development permit was applied for; assessment; and
(d) the length of a currency period; (b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to
the application as a submission for an appeal.
(2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the business days after the day the decision notice or
decision notice or negotiated decision notice is negotiated decision notice is given to the advice
given to the applicant. agency as a submitter.
(3) An appeal under subsection (1)(e) may be Appeals for matters arising after approval given
started at any time after the last day a decision on (co-respondents)
the matter should have been made. 4.1.30.(1) For a development approval given for a
Appeals by submitters development application, a person to whom any of
the following notices have been given may appeal
4.1.28.(1) A submitter for a development
to the court against the decision in the notice-
application may appeal to the court about-
(a) a notice giving a decision on a request for
(a) the giving of a development approval, including
extension of the currency period for an
any conditions (or lack of conditions) or other
approval;
provisions of the approval; or
(b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
a minor change to an approval.
(2) The appeal must be started within 20
(2) The appeal must be started within 20
business days (the “submitters appeal period”)
business days after the day the notice of the
after the day the decision notice or negotiated
decision is given to the person.
decision notice is given to the submitter.
(3) Subsection (1)(a) does not apply if the
(3) If a person withdraws a submission before
approval resulted from a development
the application is decided, the person may not
application (superseded planning scheme)
appeal the decision.
that was assessed as if it were an
(4) If an application involves both impact application under a superseded planning
assessment and code assessment, appeal rights scheme.
for submitters are available only for the part of the
(4) Also, a person who has made a request
application involving impact assessment.
mentioned in subsection (1) may appeal to
the court against a deemed refusal of the
request.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 15 of 16
Page 16
- 16 -
(5) An appeal under subsection (4) may be (2) The appeal must be started within 20
started at any time after the last day the business days after the day notice of the decision
decision on the matter should have been is given to the applicant.
made. For Building Works Only
Division 9 - Appeals to court about other Rights of appeal conferred by Section 4.2.9 of the
matters Integrated Planning Act 1997 as follows:
Appeals for matters arising after approval given Division 3 – Appeals to tribunals relating to
(no co-respondents) development applications
4.1.31.(1) A person to whom any of the following Appeals by applicants
notices have been given may appeal to the court
4.2.9(1) An applicant for a development application
against the decision in the notice-
may appeal to the Building and Development
(a) a notice giving a decision on a request to Tribunal against any of the following-
change or cancel a condition of a development
approval. (a) the refusal, or the refusal in part, of a
2 development application;
(b) a notice under section 6.1.44 giving a decision
to change or cancel a condition of a (b) a matter stated in a development approval,
development approval. including any condition applying to the
development, and the identification of a code
(2) The appeal must be started within 20 under section 3.1.6;
3
business days after the day the notice of the
decision is given to the person. (c) the decision to give a preliminary approval when a
development permit was applied for;
(3) Also, a person who has made a request
(d) the length of a period mentioned in section 3.5.21
mentioned in subsection (1)(a) may appeal
currency period;
to the court against a deemed refusal of the
request. (e) a deemed refusal.
(4) An appeal under subsection (3) may be (2) An appeal under subsection (1)(a) to (d) must
started at any time after the last day the be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
decision on the matter should have been
negotiated decision notice is given to the applicant.
made.
(3) An appeal under subsection (1)(e) may be
Appeals against decisions to change approval started at any time after the last day a decision on the
conditions under the repealed Act matter should have been made.
4.1.33A.(1) A person who is dissatisfied with a The Registrar for the Building and Development
decision made on an application to change the Tribunal may be contacted at the website
conditions attached to an approval given under http://www.localgovernment.qld.gov.au/
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override
agency in certain circumstances) local planning instrument)
Page 16 of 16
Used in these records
SUPERSEDED Decision Notice - 010.2008.00000170.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 83 KB (small file)
- File type
No other editions are linked here.