SUPERSEDED Decision Notice - 010.2008.00000170.001 [As Published] · 132008.170
-5-
34. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
(minimum storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank
is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
internal to the dwelling. All rainwater tanks are to be designed and installed in accordance
with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
of the plumbing application in conjunction with the building approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
Operational Works approval and any overflow shall be directed to the stormwater drainage
system.
35. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
existing drainage structures in Egret Street. Plans of the drainage design shall be prepared by
a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
36. The retaining walls and fencing proposed along the western boundary of the site shall be
designed and constructed such that they do not impede, concentrate or redirect overland flow
from the adjoining upstream properties onto any adjoining properties or to Council’s pathway.
The type of wall and fencing shall be clearly shown on the plans submitted for Building Works /
Operational Works approval.
37. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
provided on site prior to being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestor/gross pollutant trap, which shall be submitted to the Council for approval prior to
obtaining a Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
38. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
39. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
40. The existing sewer main that is located in the adjoining property at the rear, the side and the
front of the site and the ‘zone of influence’ (taken as the area within a 45-degree angle
measured from the invert of the sewer main to the finished surface level) shall be accurately
located and determined by a licensed Surveyor and shown on all plans submitted for
Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
As such the applicant shall amend Operational Works plans including Building plans to ensure
compliance.
Page 5 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2008.00000170.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 83 KB (small file)
- File type
No other editions are linked here.