Site Stability
49. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or lands, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
50. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
51. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $3,034
PSP16 – Sewerage Headworks Contributions $7,460
PSP17 – Water Supply Headworks Contributions $4,725
PSP20 – Pathway Trunk Network Contributions $1,364
TOTAL Contribution Amount = $16,583
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the trading bank guarantee will be returned.
General
52. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
Page 7 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2008.00000170.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 83 KB (small file)
- File type
No other editions are linked here.