APPROVED PLAN
MCU21/0212
NOOSA COUNCIL
15 SEPTEMBER 2022
A B C
site boundary
coastal setback
2.0m setback
site boundary
roof
RL39.790
rnd01
2400
rnd01
roof terrace ngl +8m at line of building
RL37.870 skl01
level 01
RL37.390
fen01 ngl +8m
3250
rnd01 gls01 scr01 scr01 scr01
stn01
ground level
RL34.140
rnd01 stn01
3240
lower ground fen01
RL30.900
ngl
1 elevation south
- 1 : 100
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
E
F
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane boundary elevations SD 300.03 H SCALE 1 : 100
elevation south
JB G 19.08.22 DA RFI Response
Sunshine Beach
JB H 01.09.22 DA Approval Set schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Document Set ID: 22110405
Version: 1, Version Date: 20/09/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.