Council archive · source document
231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175
Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
Form 3: Daily Log Sheet
Prepared By: Week Beginning:
MON TUE WED THU FRI SAT SUN
Date
Rainfall (mm)
CEMP Compliance
DESCRIPTION MON TUE WED THU FRI NOTES
Water
Ponding, runoff evident
Erosion evident
Functional diversion drains
Functional sediment fences, catch
dams and other sediment
containment devices
Waste
Site clean with no lose materials /
rubbish
Noise
Any significant noise
Ecology
Vegetation not included in works
impacted
Pest / weeds (e.g., Fire Ants)
Fauna spotted / impacted by
works
DETAILS
MON
TUE
WED
THU
FRI
Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd Page 36 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.