Council archive · source document
231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175
Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
Form 4: Stormwater Management, Erosion & Sediment Control
Prepared By: ……………………………………………….………………………… Date: ……………………………..…………….
Position: ……………………………………………………………………………………….….……………………………………………..
In Place Absent Maintenance
Required
Diversion Drains
Sediment Traps/Detention Basins
Grassing & Rehabilitation
Silt Curtains and Fences
Hay Bales
Energy Dissipaters
Bunding
Comments:……………………………………………………………………………………………………………………..………………
…..……………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………….……..
Maintenance Requirements
Yes No
Water Running
Scouring
Erosion
Sedimentation
Debris
Slumping
No Action Necessary
Action Required
Action Determined: ………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
Action Authorized: …………………………………… Position: ………………………………………..
Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd Page 38 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.