8.0 CONCULSION The stormwater management report demonstrates under the detailed plans the proposed residential development at , Lot 1 on RP203032, 20 Kauri Street, Cooroy meets the quantity and quality stormwater requirements as described in this report. If the proposed development maintains pre-development drainage patterns and flow rates to the lawful points of discharge, are the existing stormwater drainage reserve on the western boundary of the site and the Kauri Street kerb and channel. Sediment generated during the construction phase is to be dealt with in accordance with a Silt and Sediment Control plan and is to be kept on-site throughout construction. The proposed development does not trigger the State Planning Policy 2017 stormwater quality treatment objectives. A water storage tank for re-use has been incorporated into the proposed development to promote stormwater harvesting. On-site detention has been provided to maintain existing peak flow rates and to ensure a non-worsening to flooding of downstream properties. On-site detention is proposed to be contained with an underground tank and the designed to contain all flows up to a Q100 (1% AEP) storm event. The subject site is not affected by localised flooding. SCG Consulting Engineers Page 17 SCG Ref: 33114(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.