Original source · versioned page text
Bushfire Hazard Assessment & Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan - v1 NCES REF: ELK 2016-04 Lot 70 on M37807 – 28 Elkhorn Drive, Tewantin 9.0 REFERENCES Bradstock, Gill & Williams. 2012. Flammable Australia: fire regimes, biodiversity and ecosystems in a changing world. CSIRO, Collingwood, Victoria. Department of Emergency Services (2003). Appendix 3 & 8 State Planning Policy 1/03 Guideline: ‘Mitigating the Adverse Impacts of Flood, Bushfire and Landslide’. Brisbane. Gould, McCaw, Cheney, Ellis & Matthews. 2007. Field Guide – Fuel assessment and fire behaviour in dry eucalypt open forest. Ensis-CSIRO, Canberra, ACT and Department of Environment and Conservation, Perth, WA. Southeast Queensland Fire and Biodiversity Consortium – Operational Manual. Bushfire Hazard Overlay Code. Noosa Plan 2009. Noosa Council. Webster. 2002. The Complete Bushfire Safety Book. Random House (Aust) Pty Ltd. © 2016 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.