Skip to the record
Beware of cheap imitations.

Original source · versioned page text

UPDATED DA - Attachment 9B - Preliminary Engineering Plans

of 22

Plans and drawings: the text below has words only, no drawings.

Very large file (50.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                            LEGEND
                                                                                                                                                                                                                                                            EXISTING CONTOURS                               3.0
                                                                                                                                                                                                                                                                                                                                   IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                            EXISTING PAVEMENT                                                  CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                              AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                            PROPOSED EDGE OF BITUMEN                                             ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                   COMMENCEMENT OF EXCAVATION
                                                                                                                                                                                                                                                            PROPOSED PAVEMENT WIDENING

                                                                                                                                                                                                                                                            PROPOSED LANDSCAPING

                                                                                                                                                                                                                                                            PROPOSED DRIVEWAY (ARCHITECT)

                                                                                                                                                                                                                                                            PROPOSED DESIGN (ARCHITECT)
JOINS SHEET C401
JOINS SHEET C402




                                                                                                                                                                                                                                                                                                                              Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                              Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                              Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                              Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                            SCALE 1:250 (A1) - 1:500 (A3)     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                              services are to be confirmed and protected on site by the
                                                                                                                                   JOINS SHEET C402                                                                                                                                                                           contractor prior to commencement of works.

                                                                                                                                                      Approved
Checked -               CJT                                                                                                                                                                              Drawing title -       Project -   DOONAN RESOURCE                 Site -                                           Project No.     244035       Sheet No.             C400
Design -              CJT          Drawn -    CJT
                                                                                                                                                                                                         SWEPT PATHS SHEET 1               RECOVERY REDEVELOPMENT         561 EUMUNDI-NOOSA ROAD,                           Digital Ref :   C400 SWEPT PATHS         Issue :        A
Scales -              AS SHOWN                                                                                                                        COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                            Client -
                                                                                                                                                                                                                                           NOOSA SHIRE COUNCIL            DOONAN                                              This Document is copyright and shall not be copied
                                                                A   13.02.2025   PRELIMINARY ISSUE                      CJT
                                                                                                                                                      ABN 59 137 305 992         PO BOX 16                                                                                                                                    without written approval, nor shall it be used except
Document Stage -                   PRELIMINARY                                                                                                        (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                        for the Development and the Site Specified.
                                                               Issue Date                      Description             By                             [email protected]
                   c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C400 SWEPT PATHS.dwg                                                                                                                                                                                            Plot 24 February 2025 - 11:31 AM
Log in to download the original file

UPDATED DA - Attachment 9B - Preliminary Engineering Plans.pdf · 50.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.