Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

UPDATED DA - Attachment 9B - Preliminary Engineering Plans

of 22

Plans and drawings: the text below has words only, no drawings.

Very large file (50.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                            JOINS SHEET C402
                                                                                                                                                                                                                                                                                                        IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                    CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                   AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                      ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                        COMMENCEMENT OF EXCAVATION




                                                                                                                                                                                                                                                                                                   Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                   Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                   Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                   Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                 SCALE 1:250 (A1) - 1:500 (A3)     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                   services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                   contractor prior to commencement of works.

                                                                                                                       Approved
Checked -    CJT                                                                                                                                                          Drawing title -                      Project -   DOONAN RESOURCE          Site -                                       Project No.     244035       Sheet No.             C204
Design -    CJT        Drawn -    CJT
                                                                                                                                                                          SWEPT PATHS SHEET 4                              RECOVERY REDEVELOPMENT   561 EUMUNDI-NOOSA ROAD,                      Digital Ref :   C400 SWEPT PATHS         Issue :        A
Scales -    AS SHOWN                                                                                                   COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                                           Client -
                                                                                                                                                                                                                           NOOSA SHIRE COUNCIL      DOONAN                                         This Document is copyright and shall not be copied
                                                    A   13.02.2025   PRELIMINARY ISSUE                      CJT
                                                                                                                       ABN 59 137 305 992         PO BOX 16                                                                                                                                        without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                     (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                            for the Development and the Site Specified.
                                                   Issue Date                      Description             By          [email protected]
       c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C400 SWEPT PATHS.dwg                                                                                                                                                                             Plot 24 February 2025 - 11:31 AM
Log in to download the original file

UPDATED DA - Attachment 9B - Preliminary Engineering Plans.pdf · 50.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.