Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

UPDATED DA - Attachment 9B - Preliminary Engineering Plans

of 22

Plans and drawings: the text below has words only, no drawings.

Very large file (50.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                             IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                         CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                        AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                           ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                             COMMENCEMENT OF EXCAVATION




                                                                                                                                                                                                                                                                                        Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                        Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                        Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                        Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                     SCALE 1:750 (A1) - 1:1500 (A3)     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                        services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                        contractor prior to commencement of works.

                                                                                                                         Approved
Checked -    CJT                                                                                                                                                            Drawing title -         Project -   DOONAN RESOURCE          Site -                                       Project No.     244035       Sheet No.             C101
Design -    CJT        Drawn -     CJT
                                                                                                                                                                            OVERVIEW - SWEPT PATH               RECOVERY REDEVELOPMENT   561 EUMUNDI-NOOSA ROAD,                      Digital Ref :   C100 SITE OVERVIEW       Issue :        A
Scales -    AS SHOWN                                                                                                     COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE      ASSESSMENTS             Client -
                                                                                                                                                                                                                NOOSA SHIRE COUNCIL      DOONAN                                         This Document is copyright and shall not be copied
                                                    A   13.02.2025   PRELIMINARY ISSUE                       CJT
                                                                                                                         ABN 59 137 305 992         PO BOX 16                                                                                                                           without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                       (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                               for the Development and the Site Specified.
                                                   Issue Date                      Description              By           [email protected]
       c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C100 SITE OVERVIEW.dwg                                                                                                                                                                Plot 24 February 2025 - 11:31 AM
Log in to download the original file

UPDATED DA - Attachment 9B - Preliminary Engineering Plans.pdf · 50.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.