Attachment 4
Revised SWMP
Response to Council’s Further Advice

MCU21/0117 + OPW21/0199




                                       DATE


[OCR of page images]
KG

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

Attachment 4
Revised SWMP

Response to Council's Further Advice

MCU21/0117 + OPW21/0199

rgstrategic.com.au

 
Full text of the other 59 pages

Page 2

     STORMWATER ENGINEERING REPORT

     The Belvedere on Pearl
     5 Pearl Street
     Cooroy, QLD 4563
     Project No.: 21011

     Version: 3.0
     Version Date: 03/11/21




                                                                                                  Page 1 of
                                                                                                  29

P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 3

            PROJECT INFORMATION



            Client:                              4CD Developments

            Site Location:                       5 Pearl Street / 54 Elm Street, Cooroy QLD 4563

            Lot & Plan:                          Lot 2 RP153798 & Lot 2 RP64750

            Proposed Development: ‘The Belvedere on Pearl’ residential development




            RECOR Consulting

            Project Reference:                   21011

            Contact Person:                      Benjamin Parry

            Contact Phone:                       (07) 5211 1003




            Document Control:




                      VERSION                        PREPARED              REVIEWED                DATE

                        1.0                             B. Parry            M. Poynter           02/07/2021


                        2.0                             B. Parry            M. Poynter           16/08/2021

                        3.0                             B. Parry            M. Poynter           03/11/2021




                                                                                                                     Page i
P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566         E [email protected]       recorconsulting.com

Page 4

            TABLE OF CONTENTS

            PROJECT INFORMATION .................................................................................................................................... I
            TABLE OF CONTENTS ........................................................................................................................................ II
            1. INTRODUCTION ............................................................................................................................................ 1
            2. SITE DETAILS ................................................................................................................................................. 1
               2. 1. E X I S T I N G S I T E D E S C R I P T I O N ................................................................................ 1
               2. 2. E X I S T I N G D R A I N A G E P A T T E R N S ............................................................................. 3
                 2.2.1 Existing Stormwater Infrastructure .................................................................................................... 3
                 2.2.1.1.          Roof Drainage ......................................................................................................................... 3
                 2.2.1.1.          Upstream Catchments............................................................................................................. 4
                 2.2.1 Existing Stormwater Catchments ....................................................................................................... 5
               2. 3. P R O P O S E D D E V E L O P M E N T D R A I N A G E P A T T E R N .......................................................... 5
                 2.3.1 Stormwater Concept .......................................................................................................................... 5
                 2.3.2 Developed Stormwater Catchments................................................................................................... 6
               2. 4. F L O O D C O N S I D E R A T I O N S .................................................................................... 7
            3. STORMWATER QUANTITY ............................................................................................................................ 7
               3. 1. D I S C H A R G E T O P E A R L S T R E E T ............................................................................... 7
            4. STORMWATER QUALITY ............................................................................................................................... 9
               4. 1. C O N S T R U C T I O N P H A S E ...................................................................................... 10
                 4.1.1 Erosion and Sediment Control Measures ......................................................................................... 10
                 4.1.2 Erosion and Sediment Control Monitoring ....................................................................................... 11
               4. 2. O P E R A T I O N A L ................................................................................................ 11
                 4.2.1 MUSIC Modelling ............................................................................................................................. 12
                 4.2.1.1.          Rainwater Tanks ................................................................................................................... 13
                 4.2.1.1.          Pit Inserts .............................................................................................................................. 15
                 4.2.1.1.          Bioretention Areas ................................................................................................................ 16
                 4.2.1.2.          MUSIC modelling results ....................................................................................................... 17
                 4.2.2 Operational Maintenance ................................................................................................................ 18
            5. CONCLUSION .............................................................................................................................................. 19
                                   PROPOSED DEVELOPMENT PLANS ........................................................................................ 21
                                   EXAMPLE ESC DEFECT DOCUMENTATION TEMPLATE ............................................................ 22
                                   ECOSOL LITTER BASKET TECHNICAL SPECIFICATION .............................................................. 24
                                   BIORETENTION INSPECTION CHECKLIST ................................................................................ 25




P +61 7 5211 1003                  A 37 Mary St, Noosaville Qld 4566                               E [email protected]                                 recorconsulting.com

Page 5

            1. INTRODUCTION
            RECOR Consulting has been commissioned to prepare a Stormwater Management Report
            to accompany a development application for a proposed residential unit development in
            Pearl Street, Cooroy.

            This report examines the stormwater management considerations for the existing and
            proposed development site and assesses how the run-off from the site is to be managed in
            accordance with Noosa Shire Council requirements for stormwater drainage.


            2. SITE DETAILS
                    2. 1. E X I S T I N G S I T E D E S C R I P T I O N

            The existing site is made up of two adjoining properties, Lot 2 on RP64750 and Lot 2 on
            RP153798, with street frontages on Elm Street and Pearl Street, Cooroy, respectively. The
            neighbouring properties to the south-west, east and north-west are residential in nature,
            with the land to the north-east designated as environmental open space on the Council
            mapping service.




                                  Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2021)


                                                                                                                 Page 1 of 26
P +61 7 5211 1003               A 37 Mary St, Noosaville Qld 4566         E [email protected]   recorconsulting.com

Page 6

            Lot 2 on RP64750 is accessed from the 21.456m frontage at 54 Elm St. The site has an area
            covering 1,516.4m² and currently houses a dilapidated detached dwelling and two free
            standing sheds on the western end of the site, and unmaintained vegetation on the eastern
            end.




                             Figure 2.2 – 54 Elm Street, view east from driveway access.

            Lot 2 on RP153798 has a 30.175m frontage which provides access to the property from 5
            Pearl Street. The site covers 758.2m² and contains a detached dwelling and double bay
            shed with predominately grass to the rear of the property.




                         Figure 2.3 – 5 Pearl Street, view west from south-eastern corner.

            The two sites cover a combined area of 2,274.6m², made up of approximately 418m² of roof
            area and 124m² of paved surfaces.

                                                                                                       Page 2 of 26
P +61 7 5211 1003       A 37 Mary St, Noosaville Qld 4566    E [email protected]      recorconsulting.com

Page 7

                    2. 2. E X I S T I N G D R A I N A G E P A T T E R N S

                        2.2.1 Existing Stormwater Infrastructure

            Data obtained from the detailed survey and Council’s interactive mapping show that there
            is no existing stormwater infrastructure on either of the site frontages nor property
            boundaries. Table drains convey stormwater drainage from the street along both Elm Street
            and Pearl Street.

            The nearest stormwater infrastructure is an existing 300mm diameter pipe located on the
            southern side of Pearl Street, which is eventually conveyed through stormwater
            infrastructure on Lot 0 SP260162 and Lot 48 C56013 towards an open drain on Lot 5
            CP889589 to the north-east of the site.

            Stormwater within the northern verge on Pearl St is conveyed through table drains and
            driveway crossovers before being discharged beneath the driveway at 11 Pearl St into the
            concrete box culvert and subsequent 1350 diameter stormwater pipe that discharges to the
            open drain to the north.

            The surface run-off from the site drains towards the north-eastern corner of the lots into the
            adjacent properties along the north and eastern boundary. No natural drainage channels
            occur within the lots causing the stormwater to drain as overland sheet flow across slopes
            of typically between 3% and 6%. From the north-eastern corner of the lot, the external
            natural topography indicates the surface water is conveyed overland towards the open
            drain on Lot 5 CP889589.

                             2.2.1.1.        Roof Drainage

            Within Lot 2 RP 64750, the roof drainage from the main dwelling is collected in gutters and
            downpipes that appear to discharge toward the northern boundary as overland flow as no
            alternative discharge point including was located on site nor into the road reserve. Neither
            of the free-standing shed structures had gutters, so water from these areas would contribute
            directly to overland flows.




                                                                                                                   Page 3 of 26
P +61 7 5211 1003               A 37 Mary St, Noosaville Qld 4566           E [email protected]   recorconsulting.com

Page 8

                    Figure 2.4 – Lot 2 RP 64750, roof downpipe draining towards northern boundary.

            Roof run-off from the dwelling on Lot 2 RP 153798 is similarly collected in downpipes
            however no outlet could be located within the property nor within the street drainage. It is
            assumed that this water must be discharged as overland flow on site as surface levels along
            the frontage are typically higher than within the property making gravity drainage to the
            street unlikely.

            Roof water from the garage on this property is collected and conveyed to a water tank on
            site of approximately 10,000L, with overflows discharged as overland flow within the
            property.

                         2.2.1.1.       Upstream Catchments

            Contour maps of the locality indicate that upstream surface run-off from the adjacent
            property on Lot 1 RP 153798 may enter Lot 2 RP 153798 as overland flow along the
            boundary, however no evidence of this was able to be observed on site. Roof water from
            the dwelling on the upstream property appears to discharge directly to the table drain on
            pearl street through a piped outlet.

            Surface run-off from the road reserve is typically collected in the table drains along the street
            frontage and does not appear to enter the site.



                                                                                                            Page 4 of 26
P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566    E [email protected]        recorconsulting.com

Page 9

                        2.2.1 Existing Stormwater Catchments

            A schematic layout plan of the existing drainage catchments as described in the previous
            sections is shown below in Figure 2.5 – Existing Catchments Plan.




                                                   Figure 2.5 – Existing Catchments Plan.



                    2. 3. P R O P O S E D D E V E L O P M E N T D R A I N A G E P A T T E R N

                        2.3.1 Stormwater Concept

            Under existing conditions, the stormwater leaves the property as overland surface flows into
            the adjoining properties to the east and north of the proposed development. The lawful
            point of discharge for the proposed development will be to the stormwater network in Pearl
            Street, which will have the benefit of reducing the impact of nuisance overland flows on the
            adjoining property owners and ensuring the runoff is discharged in a controlled manner
            into Council’s drainage network.

            Roof run-off will be collected and flow via downpipes into four slim-line rainwater tanks with
            overflow into the internal drainage network within the site. Each tank is a nominal 5kL, with
            2.5kL allocated to reuse purposes and the remaining 2.5kL per tank being dedicated for
            attenuation. To minimise pollutants entering the run-off, first flush diverters will be installed
            to divert the initial capture of roof water to irrigation of the vegetated areas on site.

            Finished surface levels will fall runoff to either stormwater pits or towards one of two
            bioretention areas at the east and west of the property. The bioretention areas will provide
            stormwater quality improvements to the run-off, as well as serving to provide additional
            attenuation.



                                                                                                                   Page 5 of 26
P +61 7 5211 1003              A 37 Mary St, Noosaville Qld 4566            E [email protected]   recorconsulting.com

Page 10

            The collected run-off will be conveyed to the south-east of the site into a new stormwater
            line to be constructed within the Pearl Street road reserve. The new stormwater line will
            connect into the council owned 1350mm diameter pipeline located to the east of the
            development in front of Lot 0 SP 260162.

            A stormwater drainage line will be installed along the southwestern boundary with Lot 1 on
            RP153798 with inlet pits to collect the surface run-off from the upstream catchments and
            divert it around the site directly to the discharge point from the site. Similarly, a slotted drain
            will be installed across the driveway at the property boundary to intercept upstream flows
            and convey them directly to the discharge point from the site.

            The roof and allotment drainage system for the proposed site shall be designed to comply
            with:

                    1. Noosa Shire Council Planning Scheme Policy (PSP) - Engineering Design Standards
                       – Roads, drainage and earthworks;

                    2. The Queensland Urban Drainage Manual (QUDM), and;

                    3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.

                       2.3.2 Developed Stormwater Catchments




                                               Figure 2.6 – Proposed Catchments Plan




                                                                                                              Page 6 of 26
P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566       E [email protected]      recorconsulting.com

Page 11

                    2. 4. F L O O D C O N S I D E R A T I O N S

            The Noosa Shire Council Intramaps Flood Hazard Overlays show that the proposed
            development site is not likely to be subject to flooding or inundation up to and including
            that during an extreme (500 year) flood event.



            3. STORMWATER QUANTITY
                    3. 1. D I S C H A R G E T O P E A R L S T R E E T

            As the existing site and upstream catchments currently drain overland into private and state-
            owned property to the north and the proposal seeks to discharge the run-off to the legal
            point of discharge in Pearl Street, a comparison of the pre-development discharges to post-
            development discharges for the site’s drainage catchments is not appropriate. To
            demonstrate that the discharges will not cause nuisance to upstream or downstream
            properties, the proposed drainage line to be constructed in Pearl Street has been modelled
            using the 1% AEP storm event, allowing a 20% increase to rainfall intensity to account for
            climate change impacts (2090 climate change factor for RCP8.5 scenario).

            Based on contours of the locality, the typical surface run-off will drain northeast towards the
            existing drainage channel north of Lot 0 SP 260162. The existing catchment is
            predominately comprised of the road and verge strips draining to the table drain. The area
            considered to contribute to the street drainage system is shown in Figure 2.6 – Proposed
            Catchments Plan as the external catchments. Due to existing run-off from the table drain
            upstream of the site now being captured in the new stormwater line, the total run-off in the
            table drain is reduced from the existing conditions, providing a potential improvement to
            any localised flooding or surface flow issues.

            To ensure sufficient capacity exists in the stormwater network, the upstream catchment
            draining into the existing stormwater infrastructure has been estimated based on the Noosa
            Council contour and stormwater infrastructure maps, with an estimated catchment area of
            6.7Ha as shown below in Figure 3.1 – Existing stormwater network catchment. This volume
            was modelled as a constant inflow rate upstream of the proposed connection point to
            simulate the full catchment draining through the piped network at the time of the design
            storm.




                                                                                                               Page 7 of 26
P +61 7 5211 1003              A 37 Mary St, Noosaville Qld 4566        E [email protected]   recorconsulting.com

Page 12

                                  Figure 3.1 – Existing stormwater network catchment

            The peak storm events for the development were modelled in 12D, with the catchment
            hydrology configured in accordance the Bureau of Meteorology’s IFD curves (increased by
            the climate change factor) for the locality and a minimum time of concentration of 5 minutes
            for each catchment. The model was run for the ensemble of storm events for storm durations
            up to 12 hours to simulate the pipe hydraulics under a range of different rainfall patterns.

            The developed site and the external catchments as described above that have been used
            in the modelling are shown below in Table 3.1-Development Catchment Areas.

                                         Table 3.1-Development Catchment Areas

                                    Catchment               Area (Ha)   Fraction Impervious

                                    C1                      0.017       100

                                    C2                      0.020       100

                                    C3                      0.028       100



                                                                                                               Page 8 of 26
P +61 7 5211 1003       A 37 Mary St, Noosaville Qld 4566               E [email protected]   recorconsulting.com

Page 13

                                    C4                      0.017   100

                                    C5                      0.017   100

                                    C6                      0.035   37.5

                                    C7                      0.003   0

                                    C8                      0.010   0

                                    C9                      0.019   0

                                    C10                     0.017   90.4

                                    C11                     0.037   54.7

                                    C12                     0.008   0

                                    E1                      0.044   20.4

                                    E2                      0.067   29.3

                                    E3                      0.037   76.9

                                    E4                      0.020   100

                                    E5                      0.033   23.1

                                    E6                      0.018   33.2

                                    E7                      0.082   51.5

                                    E8                      0.001   100



            The modelling demonstrates that there is sufficient capacity in the proposed stormwater
            network and the existing downstream network to accommodate the 1% AEP storm event
            without relying on overland flows. The modelling also demonstrates that the storage areas,
            comprised of the 4 5,000L rainwater tanks (2.5KL/tank attenuation portion only – reuse
            portion considered full at time of storms) and the bioretention areas provide sufficient
            capacity so that the internal drainage network is not exceeded for the 1% AEP storm event.
            The output of the hydraulic modelling showing the maximum Hydraulic Grade Lines (HGL)
            for the development is provided in the Drainage Longsections within Appendix A Proposed
            Development Plans.


            4. STORMWATER QUALITY
            The following sections discuss the stormwater quality considerations for the construction
            and operational phase of the development. Refer to Appendix A Proposed Development
            Plans for the proposed stormwater drainage layout plan.


                                                                                                           Page 9 of 26
P +61 7 5211 1003       A 37 Mary St, Noosaville Qld 4566           E [email protected]   recorconsulting.com

Page 14

                    4. 1. C O N S T R U C T I O N P H A S E

                        4.1.1 Erosion and Sediment Control Measures

            During construction it is necessary to manage the stormwater run-off to avoid pollution of
            downstream waterways from sediments and gross pollutants from the site. Best practice
            erosion and sediment controls shall be installed to minimise the discharge of typically
            sediment heavy run-off from the site in accordance with the objectives of Appendix 2 of the
            SPP (July 2017) shown below in Figure 4.1.




               Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives

            Refer to Appendix A Proposed Development Plans which contains the site-specific ESC Plan
            prepared for the development. The measures proposed for the site include:

                    1. Sediment fencing is to be installed along the northern and eastern boundaries of the
                       site to capture sediment from leaving the site. Drainage paths are to be inspected to
                       ensure the sediment fences are not being bypassed as a result.

                    2. A shakedown area to be installed at the construction entry/exit to the site to minimise
                       sediment being transported to and from the site.


                                                                                                              Page 10 of 26
P +61 7 5211 1003              A 37 Mary St, Noosaville Qld 4566   E [email protected]       recorconsulting.com

Page 15

                    3. Filter sock sediment traps are to be used in the table drains downstream of works
                       within the road reserve.

            In addition to these measures, stockpiles and construction materials are not permitted to be
            stored within the road reserve and shall be contained using sediment fencing downstream
            of these areas, turfed diversion swales are to be provided at upstream boundaries to reduce
            flows to earthworks areas and sediment disposal from the site shall be undertaken to the
            satisfaction of Noosa Shire Council.

                        4.1.2 Erosion and Sediment Control Monitoring

            The control measures described above must be maintained in an effective operational
            condition during the construction works. Regular inspections should be carried out by the
            contractor and any defects in erosion and sediment control devices specified for the site
            are to be remedied as soon as practicable. Any damage to either temporary or permanent
            water quality control structures is to be immediately rectified at the contractor’s expense.
            The inspection of the ESC devices is to be carried out as follows:

                             1. Routine Inspection – is to be carried out daily while work is being carried out
                                on site, or weekly while works are not being carried out.
                             2. Preventative inspection – to be carried out a maximum of 24 hours before
                                rain is forecast.
                             3. Reactive inspection – to be carried out within 18 hours of a rainfall event
                                sufficient to mobilise surface sediment on the site.

            Documentation of these defects is to be carried out, recording the date the defect was
            identified, a description of the defect, the cause of the defect and measures that can be
            implemented to reduce the likelihood of the defect occurring in the future. Once the
            device has been repaired, the date of repair and the solution implemented should also be
            recorded in the documentation. An example template for this documentation has been
            provided in Appendix B Example ESC Defect Documentation Template.


                    4. 2. O P E R A T I O N A L

            The development is to comply with the Noosa Council Water Quality and Drainage Code,
            AO6.2 which states:

            “All stormwater runoff is treated to achieve maximum removal of nutrients, gross pollutants
            and suspended solids as determined by cost to efficiency ratios. (e.g. bioretention basins
            must be sized to achieve at least 80% reduction in total suspended solids, 60% reduction in
            total phosphorous, 45% reduction in total nitrogen and 90% reduction in gross pollutants
            >5mm).”

            It is proposed that the following measures to be implemented will provide the required
            level of stormwater quality improvement to minimise impacts to the downstream network:

                    •   First-flush divertors will be installed for roof-water drainage to divert initial run-off
                        capture to irrigation of the vegetated areas on site.



                                                                                                                    Page 11 of 26
P +61 7 5211 1003              A 37 Mary St, Noosaville Qld 4566     E [email protected]          recorconsulting.com

Page 16

                    •   4 x 5,000L Slimline Rainwater tanks will be used to capture roof run-off, with 50% of
                        the tank volume allocated to reuse, and 50% to attenuation storage.
                    •   2 Bioretention areas will be used to treat and detain stormwater run-off from
                        driveway areas.
                    •   Ecosol Litter baskets (or similar) with 200µm mesh are to be provided within all
                        field inlet pits minimise sediment and gross pollutants from entering the drainage
                        line. Refer to Appendix C Ecosol Litter Basket Technical Specification for details.

                        4.2.1 MUSIC Modelling

            The proposed development and the above treatment train have been modelled in MUSIC
            (Model for Urban Stormwater Improvement Conceptualisation) software in accordance
            with the Water by Design MUSIC Guidelines 2018.

            The climatic data has been modelled using the rainfall and PET data at station 40059
            (Cooroy Composite) in 6-minute timesteps. The rainfall run-off parameters have been set
            as defined for the Southeast Queensland region, shown below in Figure 4.2 - Rainfall run-
            off parameters for SEQ




                                          Figure 4.2 - Rainfall run-off parameters for SEQ

            The source nodes have been created using a split catchment approach, with the roof,
            driveway and other ground areas separated with stochastic pollutant generation for each
            of the surface types as per Table 4.1 - Urban Residential Split Node Pollutant Generation
            Parameters. The area and impervious fractions for each catchment are actual values based
            on the design plans.


                         Table 4.1 - Urban Residential Split Node Pollutant Generation Parameters

             Flow Type                         TSS LOG¹º           TP LOG¹º VALUES                TN LOG¹º VALUES



                                                                                                                      Page 12 of 26
P +61 7 5211 1003            A 37 Mary St, Noosaville Qld 4566       E [email protected]             recorconsulting.com

Page 17

                           Surface          Mean              St. Dev   Mean          St. Dev         Mean    St. Dev
                           Type
             Baseflow  Roof                    N/A              N/A       N/A            N/A           N/A      N/A
                       Driveway                1.00             0.34     -0.97           0.31          0.20     0.20
                       Ground                  1.00             0.34     -0.97           0.31          0.20     0.20
             Stormflow Roof                    1.30             0.39     -0.89           0.31          0.26     0.23
                       Driveway                2.43             0.39     -0.30           0.31          0.26     0.23
                       Ground                  2.18             0.39     -0.47           0.31          0.26     0.23

            The proposed treatment train has been modelled as shown in Figure 4.3 - MUSIC
            Stormwater Treatment Train. The details of the treatments are described in the following
            sections




                                      Figure 4.3 - MUSIC Stormwater Treatment Train



                        4.2.1.1.       Rainwater Tanks

            The rainwater tanks collecting roof water are connected to the source nodes representing
            their drained catchments. Each of the tanks to be provided is modelled as a 5kL storage
            volume, with 2.5kL allocated for re-use (assumed to be full at beginning of the modelling)
            and the remaining portion being for attenuation purposes.




                                                                                                                        Page 13 of 26
P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566              E [email protected]           recorconsulting.com

Page 18

                                              Figure 4.4 – Typical Tank node configuration

            Each tank is to be fitted with a first flush diverter to remove the typically sediment laden
            initial volume from the tanks. This is modelled by assuming a 25L flush for run-off draining
            to each tank distributed over the roof area equating to a 0.12mm increase to the rainfall
            threshold on the upstream roof source node.

            The tanks will be plumbed for internal and external reuse which has been modelled in
            accordance with the MUSIC guidelines. The reuse demands have been determined as
            follows.

                    -   Internal Reuse

                           o     All homes are assumed to be fitted with full water saving devices,

                                      ▪     26L/Person/day for laundry

                                      ▪     21L/Person/day for toilets

                           o     ½ Pod C roof run-off

                                      ▪     2x2 bed = 3.2 persons

                                      ▪     3.2 * 47L = 150.4L/day

                                                                                                                Page 14 of 26
P +61 7 5211 1003              A 37 Mary St, Noosaville Qld 4566         E [email protected]   recorconsulting.com

Page 19

                           o     ½ Pod C & Pod B roof run-off

                                      ▪     2x2 bed = 3.2 persons

                                      ▪     2x3 bed = 4.6 persons

                                      ▪     7.8 * 47L = 367L/day

                           o     ½ Pod A roof run-off

                                      ▪     2x2 bed = 3.2 persons

                                      ▪     3.2 * 47L = 150.4L/day

                    -   External Reuse

                           o     75% of the pervious area in proximity to the tank will be irrigated at
                                 548mm/year

                           o     ½ Pod C roof run-off

                                      ▪     0.75 * 110m² * 0.548 = 45kL/year

                           o     ½ Pod C & Pod B roof run-off

                                      ▪     0.75 * 162m² * 0.548 = 67kL/year

                           o     ½ Pod A roof run-off

                                      ▪     0.75 * 40m² * 0.548 = 16kL/year


                           4.2.1.1.         Pit Inserts

            All grated inlet pits within the development are to be fitted with Ecosol Litter baskets with
            200µm filter Bags. These have been certified by the manufacturer as having the pollutant
            removal efficiencies shown in Figure 4.5 - Ecosol Litter Basket Pollutant Removal Efficiencies.
            The inserts are modelled using generic treatment nodes, with a high flow bypass of 53L/s
            and concentration-based capture efficiency set in accordance with manufacturers
            guidelines. Refer to Appendix C Ecosol Litter Basket Technical Specification for further
            details on the devices.




                                                                                                             Page 15 of 26
P +61 7 5211 1003              A 37 Mary St, Noosaville Qld 4566      E [email protected]   recorconsulting.com

Page 20

                          Figure 4.5 - Ecosol Litter Basket Pollutant Removal Efficiencies


                      4.2.1.1.       Bioretention Areas

            Two 12.5m² bioretention areas are to be provided within the development to capture and
            treat surface run-off from road areas as well as overflows from attenuation tanks. The
            bioretention areas are modelled in accordance with the Water by Design MUSIC Guidelines
            2018 with the node configuration for one of the areas shown below in Figure 4.6 –
            Bioretention Node details.




                                                                                                       Page 16 of 26
P +61 7 5211 1003       A 37 Mary St, Noosaville Qld 4566    E [email protected]      recorconsulting.com

Page 21

                                               Figure 4.6 – Bioretention Node details

            Table 4.2 – Bioretention Area Plantings below based on the Brisbane City Council Water
            Sensitive Urban Design Engineering Guidelines presents a sample of suitable plants that
            shall be used to provide effective removal of nutrients in the areas.

                                              Table 4.2 – Bioretention Area Plantings

                                                                                                                           Planting
                                                                                                                           Density
             Scientific Name                                   Common Name                      Form         Height (mm)   (Qty/m²)
             Myoporum parvifolium                              Creeping Boobialla               Prostrate           150    4-6
             Cymbopogon refractus                              Barbed Wire Grass                Tufted              300    8-10
             Cyperus polystachyos                              Bunchy Sedge                     Tufted              600    6-8
             Dianella brevipendunculata                        Flax Lily                        Tufted              500    4-6
             Dianella caerulea cv ‘Breeze’                     Blue Flax-lily                   Tufted              600    4-6
             Dianella caerulea cv ‘Little Jess’                Blue Flax-lily                   Tufted              400    4-6
             Dianella longifolia var. longifolia               Pale Flax-lily                   Tufted              550    6-8
             Dichelachne crinita                               Long Haired Plume Grass          Tufted              200    6-8
             Erograstis elongata cv ‘Elvera’                   Elvera                           Tufted              300    6-8
             Imperata cylindrica                               Blady Grass                      Tufted              500    4-6
             Lepidosperma laterale                             Variable Sword Sedge             Tufted              750    8-10
             Lomandra confertifolia                            Matting Lomandra                 Tufted              300    4-6
             Lomandra confertifolia subs pallida               Mat Rush                         Tufted              400    4-6
             Lomandra longifolia                               Matt Rush                        Tufted             1000    4-6
             Lomandra longifolia cv 'Tanika'                   Tanika                           Tufted              500    4-6
             Poa labillardiere cv ‘Eskdale’                    Eskdale                          Tufted              450    6-8
             Themeda australis                                 Kangaroo Grass                   Tufted              400    6-8
             Themeda australis cv ‘Mingo                       Mingo                            Tufted              200    8-10



                        4.2.1.2.        MUSIC modelling results

            The proposed treatment train is able to achieve the required water quality improvements
            as shown below in Table 4.3 - MUSIC Modelling results.

                                                Table 4.3 - MUSIC Modelling results

                                                      Sources              Residual           Percentage        Percentage
                                                                           Load               Target            Reduction

             Total Suspended Solids (kg/yr)              454.08                 88.35                 80             80.54

             Total Phosphorus (kg/yr)                     0.938                 0.312                 60             66.75

             Total Nitrogen (kg/yr)                       5.661                 3.06                  45             45.95

             Gross Pollutants (kg/yr)                    50.581                 4.902                 90             90.31




                                                                                                                                  Page 17 of 26
P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566                    E [email protected]            recorconsulting.com

Page 22

                     4.2.2 Operational Maintenance

            Periodic maintenance and monitoring of stormwater infrastructure proposed for this
            development should be carried out to ensure they are operating effectively during the
            post-construction phase. After the on-maintenance period, the responsibility for these
            maintenance activities shall be the body corporate for the site who may appoint a suitably
            qualified maintenance contractor to undertake these activities.

            The field inlet grates, pits and underground pipes shall be inspected for blockage or
            damage at least 6 monthly or after significant rainfall event. Any blockages shall be
            cleared from the system, and damage assessed to determine if it impacts on the function
            of the system or may pose a hazard that will require repair.

            The litter baskets shall be maintained in accordance with the manufacturer’s specifications.
            Refer to Appendix C Ecosol Litter Basket Technical Specification for further details.

            The bioretention areas shall be maintained following a schedule of routine inspections
            undertaken after every significant rainfall event (30mm of rainfall in a 24-hour period) or on
            a three (3) monthly basis within the first twelve (12) months and on a six (6) monthly basis
            thereafter. The inspection shall ensure the proper functioning and condition of the
            bioretention area and ensure that the planting and vegetation health is suitably
            maintained. An inspection checklist from the Healthy Waterways Technical Design
            Guidelines for Southeast Queensland has been provided in Appendix D Bioretention
            Inspection Checklist that provides the structure for the inspections to be undertaken.

            In addition to regular inspections, the first 4 months of establishment of the bioretention
            areas requires a watering frequency of:

               i.    Week 1 - 6 - 5 times per week

               ii.   Week 6-10 – 3 times per week

              iii.   Week 11-15 – 2 times per week

            After 5 months, watering frequency shall be adjusted based on the local conditions to
            ensure plants are maintained in a healthy state.




                                                                                                          Page 18 of 26
P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566   E [email protected]        recorconsulting.com

Page 23

            5. CONCLUSION

            This Stormwater Management Report has outlined how the stormwater run-off from the site
            is to be managed to minimise any adverse impacts to the downstream catchments.

            The existing site and upstream catchments’ drainage patterns currently discharge from the
            site as overland nuisance surface flows into adjacent properties to the north and east of the
            proposed development site. The legal point of discharge for the site will be to the
            stormwater drainage system on Pearl Street. As none of the existing catchments currently
            drain to the street, a pre-development to post-development comparison of site discharges
            is not suitable for the development. The network infrastructure has instead been modelled
            to demonstrate sufficient capacity exists withing the existing network to carry the
            developments discharge.

            The proposed development site, and the upstream and downstream catchments draining
            to the Pearl Street drainage system have been modelled under the 1% AEP storm event with
            a climate change increase factor of 20% being applied to represent the RCP8.5 scenario to
            2090. The modelling shows that with the combination of rainwater/attenuation tanks and
            bio-gardens, the proposed stormwater network within the site, the proposed drainage line
            in Pearl Street and the existing infrastructure (being the legal point of discharge for the
            development) are sufficiently sized to carry the 1% AEP design storm without exceeding the
            capacity of the existing network.

            During construction, erosion and sediment control measures including downstream
            sediment fencing of the property boundaries and of stockpile areas, a construction
            shakedown area at the entry/exit of the site and upstream diversion banks are to be
            implemented to minimise sediment and gross pollutants impacting the downstream
            receiving environment. These measures are to be inspected and maintained regularly
            during construction.

            In the operational phase of the development, a stormwater treatment train will provide
            quality improvements as required by the Noosa Council Planning Scheme Policy. Roof run-
            off is to be directed towards 4 5,000L rainwater reuse and attenuation tanks that will be
            fitted with first-flush divertors to will divert initial roof run-off to on site irrigation of vegetated
            areas. The tanks are to be plumbed for reuse for internal (laundry and toilets) and external
            (irrigation) purposes that will serve to provide both treatment and reduce the volume of run-
            off entering the drainage network. Overflows from the tanks, as well as overland flows from
            the ground areas are to be directed towards the site’s stormwater treatment devices. These
            are principally made up of two 12.5m2 bioretention areas that will treat the majority of run-
            off from the driveway areas while also attenuating run-off volumes. Ecosol litter baskets with
            200µm filter screens will also be provided to all pits within the development to ensure
            treatment for any run-off that bypasses or is unable to be captured by the bioretention areas.
            The development will connect into the existing stormwater infrastructure by providing a new
            drainage line within Pearl Street that will connect into the existing.

            The proposed stormwater treatment train has been modelled in MUSIC software in
            accordance with the Water By Design MUSIC Modelling Guidelines. By implementing the


                                                                                                                   Page 19 of 26
P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566        E [email protected]            recorconsulting.com

Page 24

            proposed stormwater treatments, the development will reduce the quantity of stormwater
            pollutants by more than 90% of gross pollutants, 80% of total suspended solids, 60% total
            phosphorous and 45% total nitrogen, exceeding the pollutant reduction targets required
            for the site.

            By implementing the proposed stormwater solution, it is considered that stormwater layout
            proposed will minimise any adverse impacts to the downstream environment and
            neighbouring properties arising from the stormwater run-off while also meeting the
            stormwater quality targets required for the development.




                                                                                                     Page 20 of 26
P +61 7 5211 1003       A 37 Mary St, Noosaville Qld 4566   E [email protected]     recorconsulting.com

Page 25

                                                  Proposed Development Plans




                                                                                                 Page 21 of 26
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566     E [email protected]   recorconsulting.com

Page 26

                                                                                                                                                                                                   OP WORKS
THE BELVEDERE ON PEARL                                                                                                                                                                                      ISSUE


5 PEARL STREET, COOROY QLD 4562
CIVIL WORKS


 NOTE:                                                                     7.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL
                                                                                BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,
 THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS                 CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD
 BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO          PAVEMENTS.
 PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
 INSPECTIONS. SHOULD THE CONTRACTOR FAIL TO REQUEST AN INSPECTION,         8.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
 THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE              AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR
 WORKS TO BE INSPECTED TO THE SATISFACTION OF RECOR. ANY INSPECTIONS            REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION
 THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID        OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.
 BY THE CONTRACTOR.                                                        9.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL
 a.   PRESTART                                                                  WORKPLACE HEALTH AND SAFETY REQUIREMENTS.

 b.   EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT    10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE
      AND EROSION CONTROL MEASURES UNSUITABLE GROUND                           PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
                                                                               CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES
 c.   SIDE AND CUT OFF DRAINS                                                  NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND
 d.   STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL                        INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
                                                                               EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
 e.   STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                                                           11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON                              SITE BOUNDARY
 f.   STORMWATER STRUCTURE BASE SLABS                                          THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
 g.   SEWER RETICULATION                                                       WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.

 h.   WATER RETICULATION                                                   12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
                                                                               CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT
 i.   PAVEMENT SUBGRADE                                                        REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO
 j.   PAVEMENT REINFORCING                                                     NOTE COUNCILS ADAC REQUIREMENTS.

 k.   PAVEMENT PRIOR TO SEALING (PRESEAL)                                  13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT
                                                                               APPROVALS.
 l.   RETAINING WALL FOOTING REINFORCING
                                                                           14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,
 m.   RETAINING WALL BLOCKWORK PRIOR TO CORE FILL                              LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
 n.   STEEL REINFORCEMENT OF CONCRETE STRUCTURES                               CONSTRUCTION.

 o.   PRACTICAL COMPLETION                                                 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION
                                                                               WORKS COMMENCING ON SITE.
 p.   ON MAINTENANCE
                                                                           16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
 q.   OFF MAINTENANCE                                                          AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
 r.   ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER            17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
      DEVELOPMENT APPROVAL)                                                    PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT
 s.   ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE                OF ANY WORKS ON SITE.
      RELEVANT TO THEIR CERTIFICATION SCHEME                               18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED
                                                                               IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO
                                                                               ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND
 GENERAL NOTES                                                                 BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
 1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.               ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE
                                                                               AS DIRECTED.
 2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
                                                                           19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
      CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY
                                                                               CONSULTANTS/CONTRACTORS DRAWINGS:
                                                                                                                                                    LOCALITY PLAN
      SETOUT THE WORKS.
                                                                                      SURVEYOR:     SKYLINE SURVEYORS                                 NOT TO SCALE
 3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT
      SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                       ARCHITECT:    ZEST BUILDING GROUP
      CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT
      GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED                        HYDRAULICS:   PLUMBING DESIGN & DRAFTING
      STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                                                                                                                    03/11/21   UPDATED DETAILS                 -    MVP
                                                                                      STRUCTURAL:   RECOR
                                                                                                                                                                                     02/07/21   ISSUED FOR OP WORKS             -    MVP
 4.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                   LANDSCAPE:    ZEST BUILDING DESIGN                                                              DATE              REVISION               MARK CHK
      THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND
      LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT         20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:                                        PROJECT ENGINEER

      THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.          ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
                                                                               WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS
 5.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS            ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
      SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS
      TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH THE FOLLOWING
      COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE        LOCAL AUTHORITY APPROVALS: T.B.A
      CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF         22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW
      ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY           APPROVALS BY COUNCIL.
      DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.                                                                                                                          E [email protected]
                                                                           23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE
      CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING                                                                                                                    A 37 MARY ST NOOSAVILLE, QLD
      PROPOSED WORKS.                                                          BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF
                                                                               THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                                          P +61 7 5211 1003
 6.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND               RESERVE, PARKS/OPENSPACE, EASEMENTS.                                                                  CLIENT
      SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN
                                                                           24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
      ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES
                                                                               DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.
                                                                                                                                                                                       4CD DEVELOPMENTS
      CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO
      IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL       25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                                           PROJECT
      DIRECTION PRIOR TO COMMENCING CIVIL WORKS.                               ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND
                                                                               CONSTRUCTION CODE (2013).
                                                                                                                                                                                        THE BELVEDERE ON PEARL
                                                                                                                                                                                        5 PEARL STREET, COOROY
                                                                                                                                                                                     TITLE

                                                                                                                                                                                       COVER SHEET AND
                                                                                                                                                                                       LOCALITY PLAN

                                                                                                                                                                                     PROJECT NO.      DRAWING NO.     STATUS

                                                                                                                                                                                        21011           C01           OPW
                                                                                                                                                                                     DRAWN            DESIGNED        SCALE         ISSUE

                                                                                                                                                                                         MVP            BRP             1:200        B

Page 27

                                                                                                                                                                                                                                         OP WORKS
                                                                                                                                                                                                                                                  ISSUE
NOTE:
1.   FOR GENERAL NOTES REFER DWG No. C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR
     TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.                                                                                                                                                                                    LEGEND
2.   THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING FEATURES OF THIS                                                                                                                                                                FIRE HYDRANT
     SITE AND ENSURE ANY ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE INCLUDED IN THE                                                                                                                                                              SIGN
     CONTRACT.                                                                                                                                                                                                                                    PALM TREE
                                                                                                                                                                                                                                                  TREE
3.   CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE PRIOR TO
                                                                                                                                                                                                                                                  WATER METER
     COMMENCEMENT OF WORKS.
                                                                                                                                                                                                                                                  SURVEY STN
4.   CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY DEMOLITION WORKS                                                                                                                                                                  PERMANENT SURVEY MARK
     COMMENCING ON SITE.                                                                                                                                                                                                                          POWER POLE
5.   SERVICES ON NEIGHBOURS DEVELOPMENTS SHOWN AS EXISTING AS ASSUMED WILL BE                                                                                                                                                                     STREET LIGHT
     CONSTRUCTED PRIOR TO COMMENCEMENT OF WORKS.                                                                                                                                                                                                  ELECTRICITY MARKER
                                                                                                                                                                                                                                                  ELECTRICITY PILLAR
6.   ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED AND REMOVED                                                                                                                                                                  TELECOMMUNICATIONS MARKER
     FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION CLEARING PLAN (BY OTHERS) OR                                                                                                                                                                GAS LINE MARKER
     IF SCHEDULED STOCKPILE FOR USE BY LANDSCAPER. REFER VEGETATION CLEARING PERMIT                                                                                                                                                               WATER LINE MARKER
     FOR DETAILS.                                                                             EXISTING POWER CONNECTION TO BE                                                                                                                     STORMWATER M/H
                                                                                              REMOVED. REMOVAL AND ANY                                                                                                                            WATER VALVE
7.   CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE SUITABLE                                                                                                                                                                        SEWER MANHOLE
                                                                                              REPLACEMENT REQUIRED TO BE ARRANGED
     ARRANGEMENTS TO HAVE DISCONNECTED.                                                                                                                                                                                                           TRAFFIC LIGHTS
                                                                                              BY SITE SUPERINTEND
8.   PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE                                                                                                                                                                   TRAFFIC SIGNAL CONTROL BOX
     CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS                                                                                                                                                                    TELSTRA PIT
     CAN COMMENCE.                                                                                                                                                                                                                                STORM WATER
                                                                                                                                      EXISTING BUILDING TO
9.   CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND                                                                                                                                                                     SEWER MAIN
                                                                                                                                      BE DEMOLISHED AND
     COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.                                                             REMOVED OFFSITE                                                                                             GAS MAIN
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND SERVICES                                                                                                                                                                   WATER MAIN
    WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
                                                                                                                                                                                                                                                  COMMUNICATION CABLES
                                                                                                                                                                                                                                                  TELSTRA CONDUIT
                                                                                                                                                                                                                                                  ELECTRICITY
             NOTE:                                                                                                                                                                                                                                SITE BOUNDARY
             EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN
             DRAWINGS, ALL IN-GROUND SERVICES WITHIN THE PROPERTY
             BOUNDARY INCLUDING BUT NOT LIMITED TO: STORMWATER
             DRAINAGE,   SEWERAGE,   WATER,     GAS,  ELECTRICAL   AND
             COMMUNICATIONS TO BE SAFELY BE DISCONNECTED, REMOVED
             FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO                                                               EXISTING BUILDING TO
             ARRANGE ALL NECESSARY APPLICATIONS AND PERMITS WITH THE                               EXISTING DRIVEWAY
                                                                                                   TO BE DEMOLISHED                 BE DEMOLISHED AND
             RELEVANT AUTHORITIES. SERVICES TO BE CAPPED IN                                                                         REMOVED OFFSITE
             ACCORDANCE      WITH    RELEVANT      SERVICE    PROVIDER
             SPECIFICATIONS AND STANDARD DETAILS




                                                                                       EXISTING DRIVEWAY TO
                                                                                       BE DEMOLISHED AND                                                     EXISTING BUILDING TO
                                                                                       AREA MADE GOOD                                                        BE DEMOLISHED AND      EXISTING WATER TANLK
                                                                                                                                                             REMOVED OFFSITE        TO BE DEMOLISHED
                                                                                                                                                                                    AND
                                                                                                                                                                                    REMOVED OFFSITE




                                                                                                                                                                                     EXISTING POWER CONNECTION TO BE
                                                                                                                                                                                     REMOVED. REMOVAL AND ANY
                                                                                                                                                                                     REPLACEMENT REQUIRED TO BE ARRANGED
                                                                                                                                                                                     BY SITE SUPERINTENDENT




                                                                                                                                                                                                                           03/11/21   UPDATED DETAILS                         -     MVP
                                                                                                                                                                                                                           02/07/21   ISSUED FOR OP WORKS                 -        MVP
                                                                                                                                                                                                                            DATE              REVISION                   MARK CHK
                                                                                                                               EXISTING DRIVEWAY TO BE                                                                     PROJECT ENGINEER
                                                                                                                               DEMOLISHED AND REPLACED
                                                                                                                               WITH NEW FULL SITE
                                                                                                                               FRONTAGE. REFER TO DWG
                                                                                                                               C30 FOR DETAILS




                                                                                                                                                                                                                            E [email protected]
                                                                                                                                                                                                                            A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                                                                                            P +61 7 5211 1003
                                                                                                                                                                                                                           CLIENT

                                                                                                                                                                                                                             4CD DEVELOPMENTS
                                                                                                                                                                                                                           PROJECT

                                                                                                                                                                                                                              THE BELVEDERE ON PEARL
                                                                                                                                                                                                                              5 PEARL STREET, COOROY
                                                                                                                                                                                                                           TITLE

                                                                                                                                                                                                                             EXISTING FEATURES
                                                                                                                                                                                                                             LAYOUT PLAN

                                                                                                                                                                                                                           PROJECT NO.      DRAWING NO.         STATUS

                                                                                                                                                                                                                              21011         C02                 OPW
                                                                                                                                                                                                                           DRAWN            DESIGNED            SCALE             ISSUE

                                                                                                                                                                                                                               MVP            BRP                 1:200            B

Page 28

SEDIMENT RELEASE GUIDELINES                                                    EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES


1.   ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS OTHERWISE
                                                                               STANDARD DRAWING R-01 REVEGETATION GENERAL.                                             OP WORKS
     NOTED IN THIS STANDARD, MUST NOT EXCEED THE FOLLOWING LIMITS:
                                                                          FIELD INLET                                                                                           ISSUE
                                                                          15. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER TO
  1.1.   50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM
                                                                              INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
         CONCENTRATION;
                                                                              PRACTICES STANDARD DRAWING ESC-02 GRATED STORMWATER (FIELD)
  1.2.   TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND;
                                                                              INLET SEDIMENT TRAP.
  1.3.   pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE, AND TO
         THE EXTENT THAT, THE NATURAL RECEIVING WATERS LIE OUTSIDE THIS
                                                                                                                                                                          LEGEND
                                                                          OPERATION AND MAINTENANCE
         RANGE.
                                                                          16. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE
2. THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY ONLY                                                                                                                       CONSTRUCTION ENTRY/EXIT
                                                                              INSPECTED:
     EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED AND SUPPORTED                                                                                                                     SHAKEDOWN AREA
                                                                              · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN
     THROUGH DOCUMENTATION THAT:
                                                                                 WORK IS NOT OCCURRING ON SITE)
  2.1.   FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR BEFORE THE                                                                                                             SEDIMENT FENCE
                                                                              · WITHIN 24 HOURS OF EXPECTED RAIN; AND
         TSS CONCENTRATION IS LIKELY TO BE REDUCED TO 50mg/L;                                                                                                                     (INDICATIVE LOCATION)
                                                                              · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT
  2.2.   RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED SOLIDS
                                                                                 INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SITE).
         WILL RESULT IN A BETTER ENVIRONMENTAL OUTCOME BY PROVIDING
                                                                          17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC
         STORAGE FOR THE CAPTURE AND TREATMENT OF RUN-OFF FROM THE
                                                                              MEASURES SHALL OCCUR    IN ACCORDANCE
                                                                                                   MAINTENANCE       WITH THE FOLLOWING TABLE:
                                                                                                                 SCHEDULE
         IMMINENT RAINFALL AND RUN-OFF.
  2.3.    ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN TO                                                             TIMEFRAME FOR COMPLETION
                                                                                ESC MEASURES           MAINTENANCE TRIGGER
                                                                                                                                   OF MAINTENANCE
         TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES;
  2.4.   FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE
         CONCENTRATION OF TSS IN THE CAPTURED WATER HAS ALREADY
         SIGNIFICANTLY DECREASED.
3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES FROM
     THE SITE, THE RELEASE LIMIT PRESCRIBED IN (1a) ABOVE MUST NOT BE
     EXCEEDED UNLESS THE DEVELOPMENT IS IN FULL COMPLIANCE WITH THIS
     STANDARD.                                                            REPORTING
                                                                          18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE
NOTE:     IT IS RECOMMENDED THAT A SITE-SPECIFIC RELATIONSHIP BETWEEN         AND CONTROL OF ALL STAGES OF WORK FOR APPROVAL BY THE
TURBIDITY AND SUSPENDED SOLIDS IS DETERMINED FOR EACH SEDIMENT BASIN.         SUPERINTENDENT.
ONCE A CORRELATION BETWEEN SUSPENDED SOLIDS AND TURBIDITY HAS BEEN        NOTES
ESTABLISHED FOR A SEDIMENT BASIN, TESTING STORMWATER FOR COMPLIANCE
WITH RELEASE LIMITS, PRIOR TO RELEASE, CAN BE DONE ON SITE WITH A         1.   CONTRACTOR TO PROVIDE FINAL ESC DESIGN TO SUIT
TURBIDITY TUBE OR CALIBRATED TURBIDITY METER. THIS HAS THE ADVANTAGE           PROPOSED CONSTRUCTION METHODOLOGY
OF PROVIDING IMMEDIATE ASSESSMENT TO JUSTIFY A RELEASE RATHER THAN        2.   ALL DISTURBED SURFACES TO BE LANDSCAPED IN
WAITING FOR LABORATORY RESULTS TO CONFIRM CONCENTRATION LEVELS                 ACCORDANCE WITH LANDSCAPE CONSULTANTS DRAWINGS
AND COMPLIANCE. NOTE THAT      POST-RELEASE TSS VALIDATION IS             3.   CONCRETE WASHOUT TO NOT BE UNDERTAKEN ON SITE, OR
APPROPRIATE TO DEMONSTRATE THAT THE NTU/TSS CORRELATION IS BEING               TO BE UNDERTAKEN ON A DESIGNATED LOCATION.
MAINTAINED.                                                                    CONTRACTOR TO ESTABLISH CONCRETE WASHOUT AS PER
                                                                               IECA GUIDELINES.
SEDIMENT CONTROL
1.   ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE
     WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA
     GUIDELINES AND THE SPECIFICATIONS.
2.   SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM
     REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL
     ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT
     CONSTRUCTION.
3.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL
     DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL BLOCKED SEDIMENT
     DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS.
4.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE
     SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED AND
     EFFECTIVE PRIOR TO:
     a. STRIPPING OF TOPSOIL AND GRASS.
     b. BULK EARTHWORKS TO THE SITE.
     c. SERVICES INSTALLATION.
     d. PAVEMENT CONSTRUCTION
5.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL
     INSTRUCTION IS RECEIVED IN WRITING FROM THE SUPERINTENDENT TO
     REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.
6.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE
     READ IN CONJUNCTION WITH THE APPROVED DRAWINGS.
7.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE
     OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF THE SITE
     ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED
     THROUGHOUT THE CONSTRUCTION PERIOD.
8.   IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE
     DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS TO BE                  SEDIMENT AND EROSION CONTROL:
     UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS              CONTRACTOR TO ALLOW FOR PROVISION OF ALL
     TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH                        REQUIRED SEDIMENT AND EROSION CONTROL
     AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED                  DEVICES IN ACCORDANCE WITH IECA AND NOOSA
     NECESSARY AND RELEVANT.                                                     COUNCIL POLICIES AND GUIDELINES
9.   FILTER SOCK SEDIMENT TRAPS TO BE INSTALLED TO DOWNSTREAM TABLE
     DRAINS AND INLET PITS FOR WORKS WITHIN ROAD RESERVE

10. OVERALL
    a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED
       AROUND THE WORK SITE WHERE POSSIBLE.
    b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED
       AND BE OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.
    c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED
       SURFACES TO BE EITHER MULCHED, COVERED WITH EROSION CONTROL
       BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED                                                                                       03/11/21   UPDATE DETAILS                        -    MVP
       FOR MORE THAN 14 DAYS.                                                                                                                            02/07/21   ISSUED FOR OP WORKS                   -    MVP
                                                                                                                                                          DATE              REVISION                MARK CHK
SEDIMENT FENCE
10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO                                                                                        PROJECT ENGINEER
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
    PRACTICES STANDARD DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE.

TEMPORARY CONSTRUCTION ENTRY/EXIT
11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION
    REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA
    (IECA) BEST PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02
    CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES ONLY), EXIT-03 -
    ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION
    EXIT - VIBRATION GRID.
                                                                                                                                                          E [email protected]
KERB INLET                                                                                                                                                A 37 MARY ST NOOSAVILLE, QLD
12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST                                                                                     P +61 7 5211 1003
    PRACTICES STANDARD DRAWING ESC-03 KERB INLET SEDIMENT TRAPS
                                                                                                                                                         CLIENT
CHECK DAMS
13. FOR CHECK DAM STANDARD DETAIL AND SPECIFICATION REFER TO                                                                                               4CD DEVELOPMENTS
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
    PRACTICES STANDARD DRAWING RCD-01 CHECK DAMS.                                                                                                        PROJECT

REVEGETATION                                                                                                                                                THE BELVEDERE ON PEARL
14. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL
                                                                                                                                                            5 PEARL STREET, COOROY
                                                                                                                                                         TITLE

                                                                                                                                                           EROSION AND SEDIMENT
                                                                                                                                                           CONTROL PLAN

                                                                                                                                                         PROJECT NO.      DRAWING NO.      STATUS

                                                                                                                                                            21011         C10               OPW
                                                                                                                                                         DRAWN            DESIGNED          SCALE             ISSUE

                                                                                                                                                             MVP            BRP                1:200           B

Page 29

EARTHWORKS NOTES                                                                        OP WORKS
1.  FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND                                 ISSUE
    VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM
    OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND
    STOCKPILED FOR FUTURE USE AS NON-STRUCTURAL FILL IF REQUIRED, OR
    REMOVE FROM SITE.
                                                                                           LEGEND
3. WHERE SITE TOPSOIL IS TO BE RESPREAD ON SITE, CONTRACTOR TO
    ALLOW TO SCREEN THE TOPSOIL OF ALL UNSUITABLE AND OVERSIZED                                   PROPOSED 1m MAX. HEIGHT
    MATERIAL. ALL UNSUITABLE MATERIAL GENERATED FROM SCREENING TO BE                              RETAINING WALL
    REMOVED FROM SITE AT CONTRACTORS EXPENSE.
                                                                                                  FINISHED SURFACE LEVEL
4. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH ROCK
    EXCAVATION WITHIN CONTRACT RATES.                                                             PROPOSED CUT
5. COMPACT THE EXPOSED SUBGRADE OR LOOSE TOP LEVEL MATERIAL TO A                                  EARTHWORKS
    MINIMUM 98% STANDARD MAXIMUM DRY DENSITY TO AS1289 5.1.1. ANY 'SOFT
    SPOTS' IDENTIFIED BY THE PROOF ROLLING SHALL BE REMOVED AND                                   PROPOSED FILL EARTHWORKS
    REPLACED WITH A COMPACTED IMPORTED GENERAL FILL MATERIAL TO THE
    ABOVE COMPACTION REQUIREMENTS.
6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED
    WHERE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED
    GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF
    ORGANIC MATTER AND STONES GREATER THAN 150mm AND CAPABLE OF
    BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED STANDARD.
    THE MATERIAL SHALL HAVE A LINEAR SHRINKAGE NOT GREATER THAN 8%
    AND A MINIMUM C.B.R. OF 10%.
7. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
    PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
    RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN
    CUT.
8. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION
    OF RETAINING WALL COLOUR AND FINISH.
9. ALL RETAINING WALL STRUCTURAL DESIGN AND CONSTRUCTION
    CERTIFICATION BY MANUFACTURER / INSTALLER.
10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL
    ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.
    THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
    CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
    CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
    AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE WITH A MINIMUM
    150KPA BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES.
11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO
    98% STANDARD MAXIMUM DRY DENSITY (AS 1289 5.1.1) IN LAYERS NOT
    EXCEEDING 150MM COMPACTED THICKNESS.
12. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
    CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
    CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS.
13. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS TESTING TO COMPLY WITH
    THE PROJECT SPECIFICATION AND LOCAL AUTHORITY REQUIREMENTS.
14. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
    ACCORDANCE WITH LANDSCAPE DRAWINGS.
15. FINISHED EARTHWORKS SURFACES TO BE STABILISED
16. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
    CONTENT.
17. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING.
18. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
    MANAGEMENT PLANS.
19. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE
    INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC.
20. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
    RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT
    AUSTRALIAN STANDARDS AND LEGISLATION.
21. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON
    UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT
    LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS
    ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL
    TO RESTRICT DUST MOVEMENT.
22. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
    DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
    CONFIRMATION THAT WORKS CAN COMMENCE.
23. ALL BATTERS TO BE KEYED/STEPPED INTO EXISTING MATERIAL AS DIRECTED
    BY GEOTECHNICAL ENGINEER. CONTRACTOR TO ALLOW FOR ALL
    KEYING/STEPPING AS REQUIRED.
24. ALL TEMPORARY AND FINAL BATTER SLOPES ARE TO BE INSPECTED AND
    APPROVED BY GEOTECHNICAL ENGINEER. CERTIFICATION OF LONG TERM
    STABILITY TO BE PROVIDED BY GEOTECHNICAL ENGINEER PRIOR TO
    PRACTICAL COMPLETION.
25. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ALL
    CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE
    SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
    SAFETY GREATER THAN OR EQUAL TO 1.5 AGAINST GEOTECHNICAL
    FAILURES.
26. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE
    OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
    BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
    DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS                03/11/21   UPDATE DETAILS                   -     MVP
    SURFACE.
                                                                          02/07/21   ISSUED FOR OP WORKS              -     MVP
27. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE
    OF 100mm TOPSOIL LAYER.                                                DATE              REVISION               MARK CHK
28. FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL             PROJECT ENGINEER
    INVESTIGATION REPORT. IT IS RECOMMENDED THAT THE GEOTECHNICAL
    CONSULTANT BE CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO
    EARTHWORKS COMMENCING.
29. WHERE NOMINATED ON THE PROJECT DRAWINGS, PRELOADING IS TO
    OCCUR IN ACCORDANCE WITH THE PROJECT DRAWINGS, PROJECT
    SPECIFICATION AND GEOTECHNICAL REPORT. CONTRACTOR TO ALLOW FOR
    THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
    THE PRELOADING OPERATIONS. CONTRACTOR TO ALLOW TO INSTALL
    SETTLEMENT PLATES AT LOCATIONS NOMINATED BY THE GEOTECHNICAL
    ENGINEER AND ALLOW FOR WEEKLY MONITORING AND REPORTING BY
    SURVEY. PRELOAD IS NOT TO BE REMOVED UNTIL DIRECTED BY THE             E [email protected]
    SUPERINTENDENT.                                                        A 37 MARY ST NOOSAVILLE, QLD
30. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
                                                                           P +61 7 5211 1003
                                                                          CLIENT

                                                                            4CD DEVELOPMENTS
                                                                          PROJECT

                                                                             THE BELVEDERE ON PEARL
                                                                             5 PEARL STREET, COOROY
                                                                          TITLE

                                                                            SITE EARTHWORKS PLAN


                                                                          PROJECT NO.      DRAWING NO.     STATUS

                                                                             21011          C20            OPW
                                                                          DRAWN            DESIGNED        SCALE           ISSUE

                                                                              MVP            BRP              1:200         B

Page 30

                                                                                                                                                                                                                                                                                                                                                                               OP WORKS
                                                                                                                                                                                                                                                                                                                                                                                        ISSUE


                                                                                                                                                                                                                                                                                                                                                                                 LEGEND
                                                                               PROVIDE 2X5,000L SLIMLINE                         600x600 GRATED
                                                                               RAINWATER ATTENUATION TANKS                       INLET SL: 105.93                                                                                                                                                                                                                                       DRAINAGE PIPE
                                                                               (2.5KL ATTENUATION, 2.5KL REUSE) AS               CLASS B GRATED LID                                                                                                                                                                                                                                     FIELD INLET PIT
                                                                               PER DETAIL B. OVERFLOWS TO PIT
                                                                               LITTER BASKET.                                                                                                                                                                                                                                                                                           JUNCTION PIT


                                                                                            225mm FRC PIPE                   1                                                                                                                                                                                                                                                          ATTENUATION TANK
                                                   PROVIDE 5,000L SLIMLINE RAINWATER
                                                                                            USIL: 105.39                     C
                                                   ATTENUATION TANK (2.5KL
                                                   ATTENUATION, 2.5KL REUSE) AS PER         DSIL: 104.98                                                                                                                                                                                                                                                                   1
                                                                                                                                                                                                                                                                                                                                                                           A            SW PIT ID
                                                   DETAIL B. OVERFLOWS DIRECTED TO          LENGTH: 15.64M                                                             375mm FRC PIPE
                                                                                            GRADE: 2.6%                                                                                            12.5m² BIORETENTION AREA.
                                                   BIOGARDEN                                                                                                           USIL: 104.82                400MM FILTER MEDIA
                                                                                                                                          1050Ø JUNCTION PIT           DSIL: 104.74                100MM EXTENDED DETENTION DEPTH                                                                                                                                                       BIORETENTION AREA
                                                                                                                                          WITH TRAFFICABLE             LENGTH: 14.65m
                                                      CONTRACTOR TO LOCATE               600x900 GRATED                                                                                            REFER TO DETAIL A.
12.5m² BIORETENTION AREA.                                                                                                                 LOCKABLE LID                 GRADE: 0.55%
                                                      EXISTING SEWER CONNECTION          INLET SL: 105.92                                                                                                                                                                                                                                                                               EXISTING ROAD
400MM FILTER MEDIA                                                                                                                        SL: 105.84
                                                      FROM ADJACENT LOT ON SITE          CLASS B GRATED LID
100MM EXTENDED DETENTION DEPTH                                                                                                                                                                     EXISTING 225 SEWER UNDER
REFER TO DETAIL A.                                                                                                                                                                                 APPROX IL 104.05                                                                                                                                                                     PROPOSED 2.0m WIDE
                                                                                                                                                                                                   CONTRACTOR TO CONFIRM DEPTH ONSITE                                                                                                                                                   FOOTPATH
                             1
                             A                                                                                                                                                                4                                                                                                                                                                                         PROPOSED TYPE 'A'
                                                                                                                                                                                              A    600x600 GRATED                                                                                                                                                                       DRIVEWAY CROSSOVER
                                                                                                                                                                                                   INLET SL: 105.60                                                                                                                                                                     VERGE TURFED AREA. REFER
                                                                                                                                                                                                   CLASS B GRATED LID                                                                                                                                                                   ARCHITECTS PLANS.
                                                                                                                                                    3
                                                                                                                         2                          A
                                                                                                                         A                                                                            TURF BLOCK PARKING AREA TO
                                                                                                                                                                                                      ARCHITECTURAL SPECIFICATION
                                                                                                                                                                                                                                                                                                                                                                                     DESIGN SPOT HEIGHT

                                                       225mm FRC PIPE                                                300mm FRC PIPE                                                                  PROVIDE 5,000L SLIMLINE RAINWATER
                                    600x600 GRATED
                                                       USIL: 105.10                                                  USIL: 104.90                                                                    ATTENUATION TANK (2.5KL                                                                                                                                                         ASPHALT DRIVEWAY
                                    INLET SL: 105.70                                                                                                       225mm FRC PIPE
                                                       DSIL: 104.92                                                  DSIL: 104.84                                                                    ATTENUATION, 2.5KL REUSE) AS PER                                                                                                                                                CONCRETE EDGED
                                    CLASS B GRATED LID                                                                                                     USIL: 105.32
                                                       LENGTH: 31.71m                                                LENGTH: 10.67m                                                                  DETAIL B. OVERFLOWS DIRECTED TO                                                                                                                                                 250mm COMPACTED ROADBASE
                                                       GRADE: 0.57%                                                  GRADE: 0.56%                          DSIL: 104.91                              BIOGARDEN                                                                                                                                                                       30mm AC14 WEARING COURSE
                                                                                                                                                           LENGTH: 10.40m
                              TURF BLOCK PARKING AREA TO                                                                                                   GRADE: 4.0%
                                                                                                                                                                                                                                                                                                                                                                          SJ         SAW-CUT JOINT
                              ARCHITECTURAL SPECIFICATION
                                                                                                                                                      1
                                                                                                                 1                                    B                                                                                                                                                                                                                   EJ         EXPANSION JOINT
                                                                                                                 D
                                                                                                                                                          600x900 GRATED
                                                                                                                                                          INLET SL: 106.07                         450mm FRC PIPE                                                                                                                                                         CJ         CONTROL JOINT
                                                                                                                                                          CLASS C GRATED LID                       USIL: 104.72
                                                                                                                                                                                                   DSIL: 104.52
                                                                              225mm FRC PIPE                                                                                                       LENGTH: 27.75m
                                                                                                                     600X600 GRATED                                                                GRADE: 0.72%
                                                                              USIL: 105.20
                                                                                                                     INLET SL: 105.97
                                                                              DSIL: 105.04
                                                                                                                     GRATED LID
                                                                              LENGTH: 11.06m                                                                                                      RETAINING WALL TO STRUCTURAL
                                                                              GRADE: 1.45%                                                                                                        ENGINEERS SPECIFICATION
                                                                                                                                                                                              5                                                                                                              BREAK INTO EXISTING
                                                                RETAINING WALL TO STRUCTURAL                     2                                                                            A    1050Ø JUNCTION PIT                                                                                        STORMWATER, CONNECT AND
                                                                ENGINEERS SPECIFICATION                          D                                                                                 WITH LOCKABLE LID                                                                                         MAKE GOOD
                                                                                                                                                                                                                        EXISTING PROPERTY ACCESS TO BE
                                                                                                                                                                                                   SL: 106.0                                                                                                 I.L.: 103.17
                                                                        225mm FRC PIPE                                                                                                                                  DEMOLISHED AND REPLACED WITH NEW
                                                                        USIL: 105.02                                                                                                                                    FOOTPATH, TURF, KERB & CHANNEL FOR
                                                                        DSIL: 104.94                                                                                                                                    FULL SITE FRONTAGE. BATTER TO MAKE
                                                                                                                                                                                                                        SMOOTH JOIN TO EXISTING LEVELS.                                             CONTRACTOR TO LOCATE
                                                                        LENGTH: 27.62m
                                                                                                                                                                                                                        LOCALLY GRADE TOWARDS INLET PITS                                            WATER MAIN ON SITE AND
                                                                        GRADE: 1.6%
                                                                                                                                                                                                                                                                                                    ENSURE CLEAR OF WORKS
                                                                                                                                                                                                    CONTRACTOR TO LOCATE
                                                                                                                                                                                                    WATER MAIN ON SITE AND
                                                                                                                                                                                                    ENSURE CLEAR OF WORKS
                                                                    ACO GRATED DRAIN K2-00 /
                                                                    KS2-00 OR SIMILAR. 150Ø
                                                                                                                                               SJ                                                   300X300 INLET PIT WITH 150Ø
                                                                    OUTLET
                                                                                                                                                                                                    uPVC CONNECTION TO INLET
                                                                                                                                        EJ                EJ                                        PIT. GRADE SURFACE TO
                                                                                                                                                                                                    DRAIN LOCALLY TOWARDS PIT                                 REPLACE ALL DISTURBED
                                                        2m WIDE FOOTPATH IN
                                                                                                                                                                                                                                                              AREAS IN KIND AND MAKE
                                                        ACCORDANCE WITH IPWEA                                1
                                                                                                                                               CJ                                                     450mm RCP PIPE                                          SMOOTH JOIN WITH EXISTING
                                                        STANDARD DWG RS-065. MATCH                           E
                                                        TO EXISTING LEVELS AT ENDS.                                                                                                                   USIL: 104.50                                                                                                                            450mm RCP PIPE
                                                                                                                                                                                         2            DSIL: 104.30
                                                                                                                                                                                         E                                                                                                                                                    USIL: 103.30
                                                                                                                                                                                                      LENGTH: 15.62m                                                                                                                          DSIL: 103.21
                                                                                                                                                                                              3       GRADE: 1.28%                                                                                                                            LENGTH: 16.77m
                                                      600x600 GRATED                                                                                                                                                                                                                                                       4
                                                      INLET SL: 106.98                                                                                                                        E                                                                                                                            E                  GRADE: 0.54%
                                                      CLASS D GRATED LID                                               TYPE A DRIVEWAY ENTRY                   PROVIDE KERB IN                                                                                                                                                                                 03/11/21    GRAVITY DRAINAGE                        -    BRP
                                                                                                                       IN ACCORDANCE WITH                      LINE PIT AS PER NSC           1050Ø JUNCTION PIT WITH
                                                                                                                                                                                                                                                      450mm RCP PIPE                                                                                           06/10/21   REVERT TO ORIGINAL LAYOUT               -     MVP
                                                                                                                       IPWEA STANDARD DWG                      STD DWG DS-068                CLASS D TRAFFICABLE
                                                                         375mm RCP PIPE                                                                        CLASS D GRATED LID                                                                     USIL: 103.66                                                                                             17/08/21   UPDATE FOR RFI                          -     MVP
                                                                                                                       RS-051 AND DETAIL E.                                                  LOCKABLE LID & STEP IRONS                                                                         1050Ø JUNCTION PIT WITH
                                                                         USIL: 106.16                                                                          INLET SL: 106.50              SL: 106.59                                               DSIL: 103.32                             CLASS D TRAFFICABLE                                             02/07/21   ISSUED FOR OPW                          -     MVP
                                                                         DSIL: 104.29                                                                                                                             STORMWATER TRENCH WITHIN            LENGTH: 49.8m                            LOCKABLE LID & STEP IRONS                                        DATE               REVISION                   MARK CHK
                                                                         LENGTH: 29.59m                                                                                                                           ROAD AS PER DETAIL D.               GRADE:      0.68%                        SL: 105.91
                                                                                                                                         REMOVE EXISTING CULVERTS                                                                                                                                                                                              PROJECT ENGINEER
NOTE: RAINWATER REUSE/ATTENUATION TANKS TO BE                            GRADE: 6.3%                PROVIDE M1 KERB AS PER IPWEA         AND HEADWALLS
INSTALLED AS PER MANUFACTURERS SPECIFICATION AND                                                    STANDARD DWG RS-080. SAW CUT
AS PER DETAIL B. ROOF DRAINAGE TO BE FITTED WITH                                                    INTO EXISTING AND MAKE SMOOTH
FIRST FLUSH DIVERTERS TO ON-SITE IRRIGATION. TANKS                                                  JOIN. REFER DETAIL C.
TO BE PLUMBED FOR INTERNAL AND EXTERNAL REUSE.




 ROADWORKS AND DRAINAGE NOTES                                                                                                                                                            ADJACENT TO THE KERB OR ROAD PAVEMENT EDGE TO EXTEND FULLY TO THE KERB LINE OR EDGE OF PAVEMENT.                                                                       E [email protected]
                                                                                                                                                                                     19. THE CONTRACTOR IS TO CONFIRM THE LOCATION OF SERVICE CONDUITS WITH THE SUPERINTENDENT PRIOR TO LAYING STORMWATER DRAINAGE. ALL TRENCH EXCAVATION AND
 1.    REFER HYDRAULIC DRAWINGS FOR BUILDING DRAINAGE DETAILS.                                                                                                                           CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE QUEENSLAND WORKPLACE HEALTH AND SAFETY ACT 2011.                                                                A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                                                     20. ROADBASE MATERIAL SHOULD BE PLACED IN LAYERS AT LEAST 75 MM THICK BUT NOT EXCEEDING 150 MM IN THICKNESS, AND COMPACTED TO A MINIMUM DENSITY OF 95% OF THE
 2.    ALL ROADWORKS AND DRAINAGE (EXTERNAL TO SITE BOUNDARIES AND/OR COUNCIL OWNED DRAINAGE PIPES INTERNAL TO THE SITE BOUNDARIES) CONSTRUCTION AND TESTING TO BE
                                                                                                                                                                                         MAXIMUM DRY DENSITY AS DETERMINED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS1289.6.2.
                                                                                                                                                                                                                                                                                                                                                                P +61 7 5211 1003
       IN ACCORDANCE WITH NOOSA SHIRE COUNCIL DEVELOPMENT GUIDELINES, DRAWINGS AND SPECIFICATIONS.
 3.    ALL DRAINAGE CONSTRUCTION (PRIVATELY OWNED DRAINAGE LINES INTERNAL TO THE SITE BOUNDARIES) CONSTRUCTED AND TESTED TO BE IN ACCORDANCE WITH RELEVANT                           21. CONTRACTOR TO UNDERTAKE ROADWORKS TESTING IN ACCORDANCE WITH NOOSA SHIRE COUNCIL GUIDELINES, DRAWINGS AND SPECIFICATIONS.                                             CLIENT
       AUSTRALIAN STANDARDS.                                                                                                                                                         22. ECOSOL LITTER BASKETS (200um filter) OR SIMILAR TO BE PROVIDED TO STORMWATER INLET PITS IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS.
 4.    DRAINAGE PITS TO BE PROVIDED WITH Ø150 STUB FOR FUTURE HYDRAULIC CONNECTION TO BE MINIMUM 50mm ABOVE INVERT OF PIT.                                                           23. GRADE LANDSCAPED AND VEGETATED AREAS LOCALLY TOWARDS DRAINAGE.
                                                                                                                                                                                     24. DIRECTIONAL DRILLING TO BE UNDERTAKEN BY SUITABLY QUALIFIED CONTRACTOR. INTERNAL WELDS BEADS ON HDPE PIPE TO BE TRIMMED TO ENSURE SMOOTH FLOW.
                                                                                                                                                                                                                                                                                                                                                                 4CD DEVELOPMENTS
 6.    ALL STORMWATER DRAINAGE PIPES EXTERNAL TO SITE SHALL BE Ø300 AND GREATER CLASS 2 OR 3 R.C. RUBBER RING JOINTED
 7.    ALL STORMWATER PIPES ARE TO BE MANUFACTURED TO RELEVANT AUSTRALIAN STANDARDS INCLUDING BUT NOT LIMITED TO AS4058 AND AS1992.                                                                                                                                                                                                                            PROJECT
 8.    STORMWATER DRAINAGE AND STRUCTURES HAVE BEEN DESIGNED FOR OPERATIONAL LOADS ONLY. CONTRACTOR TO CONSIDER CONSTRUCTION LOADINGS AND ENSURE NO
       EXCESSIVE LOADS ARE PLACED ON STORMWATER DRAINAGE OR STRUCTURES.                                                                                                              STANDARD SIGNS AND LINE MARKING NOTES                                                                                                                                        THE BELVEDERE ON PEARL
 9.    ALL PRECAST END STRUCTURES TO BE CONSTRUCTED WITH REINFORCED CONCRETE END WALL.                                                                                               1.     GENERAL
 10.   CONTRACTOR TO CONFIRM LOCATION AND LEVEL OF EXISTING STORMWATER DRAINAGE WHERE CONNECTING ON TO EXISTING.                                                                       1.1.    ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CURRENT EDITION).                   5 PEARL STREET, COOROY
 11.   CONTRACTOR TO NOTIFY THE SUPERINTENDENT OF ANY UNSUITABLE FOUNDING MATERIAL WITHIN DRAINAGE TRENCH OR STORMWATER STRUCTURES AND AWAIT DIRECTION PRIOR TO                      2. SIGNS
       LAYING OF PIPES.                                                                                                                                                                2.1.    ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS NOTED OTHERWISE.
 12.   TRENCH BACKFILL UNDER PAVEMENT TO BE COMPACTED TO 100% STANDARD DRY DENSITY (AS1289 5.1.1) IN LAYERS NOT EXCEEDING 150mm OF CBR 15 MATERIAL OR APPROVED                         2.2.    SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE POSTS BARRIER KERB 300 FROM FACE           TITLE
       EQUIVALENT. TRENCH BACKFILL IN ROADS TO BE MINIMUM CBR15 MATERIAL UP TO ROAD SUBGRADE LEVEL.                                                                                           MOUNTABLE KERB 500 FROM FACE OF KERB.
                                                                                                                                                                                       2.3.   PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO BE TURNED AWAY BY 5° FROM THE
 13.
 14.
       ALL STORMWATER GRATES/LIDS WITHIN TRAFFICABLE AREAS TO BE CLASS "D" IN ACCORDANCE WITH AS3996.
       ALL GRATES AND LIDS SHALL SIT FLAT WITH ITS SURROUND AND NOT BE LOOSE OR MOVE UNDER WHEEL LOADS.                                                                                       NORMAL TO APPROACHING HEADLIGHT.                                                                                                                                   ROADWORKS AND
                                                                                                                                                                                     3. SIGN SUPPORTS
 15.   ALL STORMWATER STRUCTURES TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATION, AND LOCAL AUTHORITY GUIDELINES AND SPECIFICATIONS. WHERE STRUCTURES
       EXCEED MAXIMUM DEPTH AS IDENTIFIED WITHIN STANDARD DRAWINGS THE CONTRACTOR WILL ENSURE AN ADEQUATE STRUCTURAL DESIGN IS UNDERTAKEN FOR THE SUBJECT                              3.1.    SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE THEY ARE IN A PAVED SURFACE.                                                                         DRAINAGE LAYOUT PLAN
       STRUCTURE TO BE CONSTRUCTED TO.                                                                                                                                               4. LINEMARKING
 16.   CONTRACTOR TO ENSURE ALL MANHOLE STRUCTURES COMPLY WITH THE MAXIMUM DEPTH SPECIFIED IN THE PROJECT SPECIFICATION OR LOCAL AUTHORITY FROM FINISHED SURFACE                       4.1.   REDUNDANT LINEMARKING IS TO BE GROUND OFF.
       LEVEL TO UNDERSIDE OF ROOF SLAB. ANY NON CONFORMANCE IS TO BE RECTIFIED AT THE CONTRACTORS EXPENSE.                                                                             4.2.    THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.
 17.   ALL FOOTPATHS TO BE CONSTRUCTED IN ACCORDANCE WITH ARCHITECTURAL/LANDSCAPING DRAWINGS AND RELEVANT AUTHORITY STANDARD DRAWINGS AND SPECIFICATIONS.                                                                                                                                                                                                      PROJECT NO.       DRAWING NO.        STATUS
       FOOTPATHS TO BE CONSTRUCTED WITH MAXIMUM 2.5% CROSSFALL. SHOULD CONSTRUCTED FOOTPATHS EXCEED 2.5% CROSSFALL, THE CONTRACTOR WILL BE REQUIRED TO RECTIFY
       BY REMOVING AND REPLACING AT THEIR COST.                                                                                                                                                                                                                                                                                                                   21011           C30               OPW
 18.   WHERE A STORMWATER DRAINAGE TRENCH HAS BEEN CONSTRUCTED LONGITUDINALLY IN THE ROAD, THEN THE FINAL PAVEMENT SURFACE REPAIR WIDTH IS TO MATCH THE EXISTING
       LANE WIDTH AND TERMINATE 50mm CLEAR OF THE ROAD CENTERLINE OR LANE LINE LINEMARKING TO ALLOW FOR THE BITUMEN EMULSION JOINT SEAL. REINSTATEMENT OF SURFACE                                                                                                                                                                                              DRAWN             DESIGNED           SCALE              ISSUE

                                                                                                                                                                                                                                                                                                                                                                   MVP             BRP                    1:200         D

Page 31

                                                                                                                                                                                                                                                                                  ROOF DOWNPIPE CONNECTION TO
                                                                                                                                                                                                                                                                                                                                     OP WORKS
                                                                                                                                                                                                                                                                                  HYDRAULIC ENGINEERS SPECIFICATIONS
                                                                                                                                                                                                                                                                                                                                                ISSUE
                                                                                                                                                                                                                                                100Ø HIGH FLOW OUTLET




                                                                 EXTENDED DETENTION
                                                                                                                                                                            LOW FLOW JUNCTION WITH SCREW CAP DETAIL




                                                                    DEPTH VARIES
                                                                                                                                                                                                                                                               5,000L SLIMLINE RAINWATER TANK
                                                                                       PLANTING SPECIES TO PROVIDE EFFECTIVE                                                                           ORIFICE PLATE DISK                                                                                                                LEGEND
                                                                                                                                                                                                       WITH 25mm ORIFICE
                MAINTENANCE HATCH                                                      REMOVAL OF NUTRIENTS. PLANT VARIETIES
                SECURE CAPPED END                                                      AND PLANTING DENSITIES TO ARCHITECTURAL
                WITH SCREWS                                                            SPECIFICATIONS                                                                                                                                                                 ATTENUATION VOLUME
                                                                                                                                                                               HIGH FLOW                     TANK WALL
                                                                                                                                                                               OUTLET
                                600x600 RAISED GRATE
                                   FIELD INLET PIT S.L.                                                                                                                                                RETENTION LEVEL
                                                                                                                                                                          SCREW ON
                                                                                                             MAX                                                          ACCESS CAP
                                                                                                    1 IN 4          EXTEND GEOFABRIC 500MM
                                                                                                                     AND PIN UNDER TOPSOIL
                                                                                                                                                                                                                                                                    RAINWATER REUSE VOLUME

                                                                                                               SANDY LOAM FILTER MEDIA -                                        OUTLET TO           ORIFICE DISK TO BE GLUED
                                                                                                               DEPTH VARIES                                                     DRAINAGE            INSIDE JUNCTION. uPVC
                                                                                                               (0.45MM AVERAGE PARTICLE SIZE)                                   NETWORK             OUTLET FROM TANK TO BUTT
                                                                                                                                                                                                    UP AGAINST ORIFICE DISK



                                                                                                                   100MM COARSE SAND
                                                                                                                   TRANSITION FILTER MEDIA
                                                                                                                                                                                                  DETAIL B - RAINWATER ATTENUATION TANK
                                                                                                                   (NOMINAL SIZE 0.5 - 2MM)
                   PROVIDE                                      PROVIDE SUBSOIL DRAIN AT
                   END CAP                                      MIN 0.5% GRADE TO PIT               NOMINAL 200MM GRAVEL                                                                                                                                   CONSTRUCT NEW M1 KERB
                                                                                                    DRAINAGE LAYER                                                                                                                                         AS PER IPWEA STD DWG
                                                             BIDIM A34 GEOFABRIC OR SIMILAR         (FINE AGG., NOMINAL SIZE 2 - 5MM)                                                                                                                      RS-080
                                                                                                                                                                    SAW CUT 150MM INTO                              800MM
                         SUBSOIL DRAIN CLEANOUT              TO BE WRAPPED AROUND
                                                                                                                                                                    EXISTING SURFACE                                                                                                GRADE SURFACE TO
                       (NON-SLOTTED PVC) AND 135°             WALLS AND BASE OF FILTER MEDIA                                                                                                                             650MM                                                      MATCH TO KERB
                               ELBOW CONNECTOR

      DETAIL A - TYPICAL BIORETENTION GARDEN WITH SATURATED ZONE
                                                                                                                                                                          EXISTING SEAL
                                                                                                                                                                           EXISTING PAVEMENT

                                                                                                                                                                                                                                                   NEW SUB-BASE COURSE

     BIORETENTION GARDEN NOTES
                                                                                                                                                                                           WIDEN PAVEMENT AND
     1.  FILTRATION MEDIA TO BE IIN ACCORDANCE WITH THE FAWB GUIDELINES FOR SOIL FILTER MEDIA IN                                                                                           SURFACING BY 650MM
         BIORETENTION SYSTEMS, WATER BY DESIGN BIORETENTION TECHNICAL DESIGN GUIDELINES AND AS4419 -                                                                                       WIDE AND MAKE SMOOTH                           150MM                                 150MM
         SOILS FOR LANDSCAPING AND GARDEN USE. :                                                                                                                                           JOIN TO EXISTING
      1.1.   SATURATED HYDRAULIC CONDUCTIVITY:          200MM/HR PREFERRED
      1.2.   PH:                                        5.5-7.5
      1.3.   ELECTRICAL CONDUCTIVITY :                 <1.2 dS/m                                                                                                                                  DETAIL C - KERB AND CHANNEL TIE IN
      1.4.   NITROGEN CONTENT                          <800mg/kg
      1.5.   PHOSPHOROUS CONTENT                       <40mg/kg
      1.6.   ORGANIC CONTENT                           3%-10%
                                                                                                                                                                 SAW CUT 150MM INTO                                                                         30MM AC14 ASPHALT
      1.7.   PARTICLE SIZE DISTRIBUTION                Clay & silt 3 - 6% (<0.05 mm)
                                                                                                                                                                 EXISTING SURFACE AND                                                                                                   MAKE SMOOTH JOIN TO
                                                       Very fine sand 5 - 30% (0.05 -0.15 mm)
                                                                                                                                                                 MAKE SMOOTH JOIN                                                                                                       EXISTING TABLE DRAIN
                                                       Fine sand 10- 30% (0.15 - 0.25mm)
                                                       Medium to coarse sand 40- 60% (0.25 - 1.0 mm)
                                                       Coarse sand 7 - 10% (1.0 - 2.0mm)                                                                                                                       REPLACE WIDTH OF LANE
                                                       Fine gravel <3% (2.0 - 3.4%)                                                                                        EXISTING SEAL
     2. FILTER MEDIA MUST BE FREE OF WEEDS AND PROPAGATES.
     3. MEDIA SHALL BE INSTALLED AND COMPACTED LIGHTLY IN TWO LIFTS FOR DEPTHS OVER 500mm                                                                                  EXISTING PAVEMENT
     4. THE TOP SURFACE OF EACH LAYER OF MEDIA SHALL BE FREE OF LOCALISED DEPRESSIONS TO ENSURE
         EVEN DISTRIBUTION OF STORMWATER AVOIDING LOCALISED PONDING
     5. TRANSITION LAYER TO BE COARSE SAND OF TYPICALLY 1mm PARTICLE SIZE DIAMETER WITH <2% FINES
          AND SIZED TO ENSURE D15 (TRANSITION LAYER) < 5 X D85 (FILTER MEDIA)
     6. DRAINAGE LAYER TO BE COMPRISED OF FINE GRAVEL OF NOMINAL 2mm-5mm WITH <2% FINES AND




                                                                                                                                                                                                                                150MM
         MINIMUM SATURATED HYDRAULIC CONDUCTIVITY OF 400mm/hr. PARTICLE SIZE DISTRIBUTION TO ENSURE                                                           250MM MIN COMPACTED ROAD BASE
         D15 (DRAINAGE LAYER) < 5 X D85 (TRANSITION LAYER)                                                                                                    OR MATCH TO EXISTING DEPTH
     7. A MINIMUM OF 50mm AGGREGATE TO COVER PERFORATED UNDERDRAINAGE PIPES
     8. UNDERDRAINAGE TO BE SLOTTED RIGID PIPE (HDPE OR SIMILAR) WITHOUT SOCK OR GEOFABRIC. SLOT
         WIDTH OF UNDERDRAINAGE TO BE LESS THAN 2mm.                                                                                                                                                                                                       450MM Ø RCP STORMWATER PIPE
     9. ALL JUNCTIONS AND CONNECTIONS TO BE APPROPRIATELY SEALED WITH GROUT OR WATERPROOF SEAL                                                                       COMPACTED CRUSHED ROCK
     10. IMPERMEABLE LINERS (WHERE SPECIFIED) MAY INCLUDE CLAY, GEOSYNTHETIC BENTONITE CLAY LINERS                                                                   BACKFILL (MAX 75MM, NON-PLASTIC
         OR HIGH DENSITY POLY ETHYLENE (HPDE) LINERS, INSTALLED TO MANUFACTURERS SPECIFICATIONS. THE                                                                 SIZE OPEN GRADED MATERIAL)
         LINER MUST BE KEYED INTO THE BATTERS AND TO THE EMBANKMENTS, AND SEALED AROUND                                                                                                                        200MM
                                                                                                                                                                                                                                           200MM
         PROTRUSIONS SUCH AS OUTLET PIPES.
     11. PERMEABLE LINERS (WHERE SPECIFIED) MUST BE USED TO LINE THE OUTSIDE OF THE BIORETENTION                                                                                                                                                             100Ø PERFORATED PE PIPE STUB WITH
         SYSTEM. THE LINER MUST EXTEND AT LEAST 500mm BEYOND THE TOP OF THE SIDES, MUST BE KEYED                                                                                                                                                             END CAP. EXTEND 1M UPSTREAM
         INTO THE BATTERS AND COVERED BY AT LEAST 200MM OF TOP SOIL.                                                                                                                                                                                         FROM PITS AND MANHOLES.

                                                                                                                                                                       PIPE BEDDING AND EMBEDMENT
                                                                                                                                                                       IN 5MM OR 10MM SCREENINGS




                                                                                                                                                                                                                                                   100MM
                                                                                                                                                                                                                                                                                                                       03/11/21   ADDITIONAL DETAILS                   BRP
                                                                                                                                                                       DETAIL D - STORMWATER TRENCH UNDER ROAD                                                                                                         06/10/21   ISSUE FOR OP WORKS              -    MVP
                                                                                                                                                                                                                                                                                                                        DATE                REVISION             MARK CHK
                                                                                                                                                                                       30mm THICK AC14
                                                                                                                                                                                                                                                                                                                       PROJECT ENGINEER
                                                                                                                                                                                       ASPHALT SURFACE
                                                                                      TYPE M1 LAYBACK KERB                                                                             WITH PRIME COAT
                                                                                                               175mm N32 CONCRETE WITH
             SAW CUT BITUMEN                               25mm THICK ASPHALT
                                                                                                               SL72 REINFORCEMENT
             SURFACING                                     SURFACE WIDENING
                                                                                                                                                                                                                                          WIDTH VARIES


                                        300MM            650MM

TYPE 2.3 MATERIAL TO
MATCH EXISTING
PAVEMENT DEPTH                                                                                                                                                                                                                                                                                                          E [email protected]
                                                                                                                                                                                                                                                                                                                        A 37 MARY ST NOOSAVILLE, QLD
                                                                                                       SAND BLINDING                                                 CONCRETE EDGING               250MM TYPE 2.1 BASE                                                                                                  P +61 7 5211 1003
                                                                                                       LAYER 50MM MAX                                                                              COURSE MATERIAL TO BE
                                                                                                                                                                                                   COMPACTED IN 2 LAYERS                                                                                               CLIENT

                                     DETAIL E - DRIVEWAY CROSSOVER                                                                                                                                                                                                                                                       4CD DEVELOPMENTS
                                                                                                                                                                                            DETAIL F - TYPICAL INTERNAL PAVEMENT SECTION
                                                                                                                                                                                                                                                                                                                       PROJECT

                                                                                                                                                                                                                                                                                                                          THE BELVEDERE ON PEARL
                                   JOINT TO BE EITHER TOOLED
                                   JOINTS SAW CUT      1                                                                               SEALANT
                                                                                                                                                                                                                                                                                                                          5 PEARL STREET, COOROY
                                                       3 DEPTH X 6                                                                                                                                                                FOR STEEL MESH REINFORCE CONCRETE, SL
                                   WIDE OR APPROVED                                                                                                                                                                               72 MESH CENTRALLY LOCATED IN SLAB,
                                   PROPRIETARY MECHANICAL                                                                                                                                                                         WITH 50 MIN BOTTOM COVER LAP
                                   JOINT.                                                                                         SL72 MESH
                                                                                                                                  CENTRAL.                                                                                        MESH 400 ELSEWHERE.                                                                  TITLE
                                                                                                                                                                                                                                           PROPRIETARY JOINT SEAL CAP OR POLYURETHANE

                                                                                                                                           40MM        40MM
                                                                                                                                                                                                                                           SEALANT.                                                                      ROADWORKS AND
                                                                                                                                                                                                                         40MM               40MM
                                                                                                                                                                                                                                                                                                                         DRAINAGE DETAILS

                                             SL72 MESH CENTRAL
                                                                                                                                                                                                                                                                                                                       PROJECT NO.       DRAWING NO.    STATUS
                                                                                                                                                                                                   PROPRIETARY PRESSED KEY
                                             CUT EVERY SECOND WIRE AND
                                             DEPRESS REINFORCING TO
                                                                                                                              10 COMPRESSIBLE FILLER                                               JOINT TO SUIT SLAB THICKNESS
                                                                                                                                                                                                                                                                                                                          21011           C31           OPW
                                                                                                                              MATERIAL FOR FULL
                                             MAINTAIN COVER.
                                                                                                                              DEPTH.
                                                                                                                                                                                                                                                                                                                       DRAWN             DESIGNED       SCALE         ISSUE
           DETAIL G - SAW CUT JOINT (SJ)                                                                              DETAIL H - EXPANSION JOINT (EJ)                                                    DETAIL I -CONTROL JOINT(CJ)
                                                                                                                                                                                                                   CONTROL JOINT
                                                                                                                                                                                                                                                                                                                           MVP             BRP             NTS         B

Page 32

                                                   EXISTING SITE CATCHMENT AREAS
                                                                                                                                                               OP WORKS
                                                                                                                                                                         ISSUE


                                                                                                                                                                  LEGEND

                                                                                                                                                                         DRAINAGE PIPE
                                                                                                  EXISTING CATCHMENT AREAS                                               DRAINAGE PIT
                                                                                                                                 FRACTION
               C1                                                                             CATCHMENT    AREA (Ha)                                                     JUNCTION PIT
                                                                                                                              IMPERVIOUS (%)
                                                                                                                                                                         BIORETENTION AREA
                                                                                                 C1                   0.030               50.0
                                                                                                 C2                   0.166               18.9                           ATTENUATION TANK

                                         C2                                                      C3                   0.004              100.0                           EXTERNAL CATCHMENT

                                                                                                 C4                   0.028               18.8                           INTERNAL CATCHMENT

                                                                                                 E1                   0.054               20.2                           CATCHMENT DRAINAGE
                                                                                                                                                                         DIRECTION
                                                                                                 E2                   0.092               20.6
                                                                                                 E3                   0.144               54.2
                                                                                                 E4                   0.020              100.0
          E1


                                                                        C4
                    E4

                                                          C3
                                    E2




                          E3



                                               DEVELOPED SITE CATCHMENT AREAS


                                              C9                                   C12
                                                                                               DEVELOPMENT CATCHMENT AREAS
                                                                                                                                 FRACTION
                                                                                              CATCHMENT   AREA (Ha)
                         C1         C2                               C3                                                       IMPERVIOUS (%)
                                                                                                 C1                0.017                 100.0
                                                                                                 C2                0.020                 100.0   03/11/21   GRAVITY DRAINAGE LAYOUT                   MVP
                                                                                                 C3                0.028                 100.0   06/10/21   REVERT DRAINAGE TO ORIG LAYOUT       -    MVP

          C6                                                                                     C4                0.017                 100.0
                                                                                                                                                 17/08/21
                                                                                                                                                  DATE
                                                                                                                                                            ISSUE FOR OP WORKS
                                                                                                                                                                     REVISION
                                                                                                                                                                                                 -
                                                                                                                                                                                             MARK CHK
                                                                                                                                                                                                      MVP


                                                      C11                                        C5                0.017                 100.0   PROJECT ENGINEER


                                                                                                 C6                0.035                  37.5
                                               C7                                                C7                0.003                   0.0
                                                                                                 C8                0.010                   0.0
     E1                                                                                          C9                0.019                   0.0
                                                                                                                                                  E [email protected]
                                                    C4                     C5                    C10               0.017                  90.4    A 37 MARY ST NOOSAVILLE, QLD
                                                                                                 C11               0.037                  54.7    P +61 7 5211 1003
                                                                                                 C12               0.008                   0.0   CLIENT

                                                                                                  E1               0.044                  20.4     4CD DEVELOPMENTS
                E4                                                                               E2                0.067                  29.3   PROJECT
                                                               C10                                                                                  THE BELVEDERE ON PEARL
                               E2                                                                E3                0.037                  76.9
                                                C8                                               E4                0.020                 100.0      5 PEARL STREET, COOROY
                                                                                                 E5                0.033                  23.1   TITLE

                                                     E5                                          E6                0.018                  33.2     STORMWATER CATCHMENT
                                                                                                 E7                0.082                  51.5     PLAN
                                                                                                 E8                0.001                 100.0
                                                                      E6                                                                         PROJECT NO.      DRAWING NO.      STATUS
E3                                                                                       E7                                                         21011          C32             OPW
                                               E8                                                                                                DRAWN            DESIGNED         SCALE             ISSUE

                                                                                                                                                     BRP             BRP                 1:200        C

Page 33

                                                                                                                                                                                                                                                                                                                                                                                                               OP WORKS
                                                                                                                                                                                                                                                                                                                                                                                                                         ISSUE


                                                                                                                                                                                                                                                                                                                                                                                                                  LEGEND




                                      1/A                              2/A                    3/A                    4/A                     5/A                     2/E               1/D                       2/D                         5/A               1/E                         2/E                        3/E                                  4/E                    2/EX




                                                                                                           225Ø SEWER INVERT AT
                                                                                                           APPROX 104.04M AHD                       TELSTRA LINE AT
                                                                                                           MIN 380MM CLEARANCE.                     0.75M DEPTH
                                                                                                           PROVIDE CONCRETE                                                                                                                                                                                                       225Ø SEWER INVERT AT APPROX
                                                       1% AEP HGL                                                                                   340MM VERTICAL
                                                                                                           ENCASEMENT AS NECESSARY                                                                                                                                                                                                104.32 AHD. 500MM VERTICAL
                                                                                                                                                    CLEARANCE TO SW
                                                                                                                                                                                                                                                                                                                                  CLEARANCE. CONTRACTOR TO
                                                                                                                                                                                                                                                                                                                                  CONFIRM DEPTH ON SITE.




                                                                                                            300Ø WATER MAIN. DEPTH
                                                                                                            UNKNOWN, CONTRACTOR TO
                                                                                                            LOCATE AND SITE AND ENSURE
                                                                                                            MINIMUM CLEARANCE OF
                                                                                                            300MM                                                                                                                                                                                                                   300Ø WATER MAIN. DEPTH
                                                                                                                                                                                                                                                                                                                                    UNKNOWN, CONTRACTOR TO
                                                                                                                                                                                                                                                                                                                                    LOCATE ON SITE AND ENSURE
                                                                                                                                                                                                                                                                                                                                    MINIMUM CLEARANCE OF 300MM




                                                                                                                                                                                                                                                                                                                                                                                                 03/11/21   ISSUE FOR OP WORKS             -    MVP
                                                                                                                                                                                                                                                                                                                                                                                                  DATE               REVISION             MARK CHK
                                                                                                                                                                                                                                                                                                                                                                                                 PROJECT ENGINEER




DATUM RL                                   98.00                                                                                                                                            98.00                                                                   98.00
COVER (& NATURAL SURFACE) LEVEL   105.70 (107.15)               105.95 (105.99)          105.84 (105.73)         105.60 (105.43)         106.07 (105.97)         104.27 (106.52)   105.97 (106.32)           105.97 (106.64)             105.97 (105.97)   106.93 (106.94)             104.27 (106.52)            106.60                               105.91                  105.75 (105.76)

DEPTH TO INVERT                            0.60                      1.03 1.05              1.00 1.02              0.86 0.88               1.55 1.57              -0.03 0.03                0.77               0.93 0.95                   1.39 1.47                0.77                -0.02 0.03                  2.38 2.94                            2.59 2.61               2.54 2.58

HYDRAULIC GRADE LINE              105.70 105.69                 105.54 105.51            105.42 105.41           105.38 105.33           105.28 105.25                    105.04   105.74 105.73             105.60 105.54               105.28 105.25              106.25                      105.04            105.02 104.89                        104.37 104.28           104.11 103.97      E [email protected]
                                                                                                                                                                                                                                                                                                                                                                                                  A 37 MARY ST NOOSAVILLE, QLD
INVERT LEVEL                               105.10               104.92 104.90            104.84 104.82           104.74 104.72           104.52 104.50           104.30 104.24              105.20           105.04 105.02               104.58 104.50              106.16             104.29 104.24              104.22 103.66                        103.32 103.30           103.21 103.17
                                                                                                                                                                                                                                                                                                                                                                                                  P +61 7 5211 1003
PIPE CHAINAGE                       0.00                            31.71                  42.38                  57.01                   84.76                  100.39              0.00                     11.06                       38.69              0.00                       29.68                      32.48                                82.31                   99.08
                                                                                                                                                                                                                                                                                                                                                                                                 CLIENT
PIPE LENGTH                                         L=31.71                      L=10.67                L=14.63                L=27.75                 L=15.62                                      L=11.06                    L=27.63                                       L=29.59                     L=2.81                          L=49.83                     L=16.77

PIPE SIZE (mm)                                       225                          300                      375                     450                     450                                        225                       300                                           375                         450                              450                          450                        4CD DEVELOPMENTS
PIPE GRADE (%)                                      0.57%                        0.56%                   0.55%                   0.72%                   1.28%                                       1.45%                     1.59%                                         6.33%                       0.71%                            0.68%                        0.54%
                                                                                                                                                                                                                                                                                                                                                                                                 PROJECT
Q - PIPE FLOW (L/s)                                  Q=30                         Q=83                   Q=95                    Q=133                   Q=216                                       Q=31                       Q=84                                          Q=69                       Q=293                            Q=293                        Q=293
                                                                                                                                                                                                                                                                                                                                                                                                    THE BELVEDERE ON PEARL
                                                                                                                                                                                                                                                                                                                                                                                                    5 PEARL STREET, COOROY
                                                                                                                                                                                                                                                                                                                                                                                                 TITLE

                                                                                                                                                                                                                                                                                                                                                                                                   STORMWATER DRAINAGE
                                                                                                                                                                                                                                                                                                                                                                                                   LONGSECTIONS
                                                                                                                                                                                                                                                                                                                                                                                                   1 OF 2
                                                                                                                                                                                                                                                                                                                                                                                                 PROJECT NO.       DRAWING NO.   STATUS

                                                                                                                                                                                                                                                                                                                                                                                                    21011          C35           OPW
                                                                                                                                                                                                                                                                                                                                                                                                 DRAWN             DESIGNED      SCALE         ISSUE

                                                                                                                                                                                                                                                                                                                                                                                                     BRP             BRP            NTS         A

Page 34

                                                                                                                                                                                                                                                                                                                                                                                                        OP WORKS
                                                                                                                                                                                                                                                                                                                                                                                                                  ISSUE


                                                                                                                                                                                                                                                                                                                                                                                                           LEGEND




                                      1/B                       3/A                         TANK                      1/C                       2/A                 TANK                      1/C                     TANK                      4/A                 TANK                       1/A              1/EX                        2/EX                           3/EX




                                                                     ATTENUATION PORTION
                                                                     ONLY OF TANK. REUSE
                                                                     PORTION ASSUMED FULL
                                                                                                                                                                                               ATTENUATION PORTION                                                                          INFLOWS FROM
                                                                                                                                                                                               ONLY OF TANK. REUSE                                                                          UPSTREAM CATCHMENT
                                                                                                                                             ATTENUATION PORTION                               PORTION ASSUMED FULL                                                                         ESTIMATED AT 6.7Ha
                                                                                                                                             ONLY OF TANK. REUSE                                                                             ATTENUATION PORTION
                                                                                                                                             PORTION ASSUMED FULL                                                                            ONLY OF TANK. REUSE
                                                                                                                                                                                                                                             PORTION ASSUMED FULL




                                                                                                                                                                                                                                                                                                                                                          1% AEP HGL




                                                                                                                                                                                                                                                                                                                                                                                          03/11/21   ISSUE FOR OP WORKS             -    MVP
                                                                                                                                                                                                                                                                                                                                                                                           DATE               REVISION             MARK CHK
                                                                                                                                                                                                                                                                                                                                                                                          PROJECT ENGINEER




DATUM RL                                   98.00                                                98.00                                                                   99.00                                             98.00                                         99.00                                         97.00
COVER (& NATURAL SURFACE) LEVEL                                                        106.95 (105.95)            105.95 (105.92)           105.95 (105.99)    106.90 (105.87)            105.95 (105.92)        106.30 (105.56)            105.60 (105.43)    106.70 (106.96)             105.70 (107.15)   105.75 (105.82)            105.75 (105.76)                 105.30
                                  106.07 (106.30)          105.84 (105.73)                                                                                                                                                                                                                                                                                                                 E [email protected]
DEPTH TO INVERT                            0.74               0.94 1.02                         1.00                0.55 0.57                 0.97 1.05                 1.00                0.55 0.57                     0.50                0.85 0.88                 0.70                        0.60              1.18                 1.18 2.58                             2.55      A 37 MARY ST NOOSAVILLE, QLD
                                                                                       106.34 106.24                       105.65           105.54 105.51      106.87 106.35                       105.65        106.15 106.04              105.38 105.33      106.63 106.61               105.70 105.69     105.75 105.25              105.22 103.97                            103.47    P +61 7 5211 1003
HYDRAULIC GRADE LINE              105.47 105.39            105.42 105.41                                                                                                                                                                                                                                                                104.11
                                                                                                                                                                                                                                                                                                                                                                                          CLIENT
INVERT LEVEL                               105.33          104.91 104.82                        105.95            105.40 105.39             104.98 104.90               105.90            105.40 105.39                   105.80            104.75 104.72               106.00                      105.10            104.57            104.57 103.17                            102.75

PIPE CHAINAGE                       0.00                     10.41                       0.00                       1.92                     17.56               0.00                       1.91                   0.00                       6.82               0.00                       11.72              0.00                        2.87                          52.06              4CD DEVELOPMENTS
PIPE LENGTH                                        L=10.41                                               L=1.92                 L=15.64                                          L=1.91                                            L=6.82                                       L=11.72                                        L=2.87                         L=49.19                     PROJECT
PIPE SIZE (mm)                                      225                                                   90                         225                                          90                                                90                                             90                                        1800x750                          1350
                                                                                                        28.62%                      2.61%                                       26.14%                                             15.4%                                         7.68%                                         0.05%                          0.85%
                                                                                                                                                                                                                                                                                                                                                                                             THE BELVEDERE ON PEARL
PIPE GRADE (%)                                       4%
Q - PIPE FLOW (L/s)                                 Q=16                                                 Q=16                       Q=50                                         Q=21                                             1Q=14
                                                                                                                                                                                                                                    in 6.5                                       1Q=12
                                                                                                                                                                                                                                                                                   in 13                                     1 Q=2986
                                                                                                                                                                                                                                                                                                                               in 1985.5                      Q=3279                         5 PEARL STREET, COOROY
                                                                                                                                                                                                                                                                                                                                                                                          TITLE

                                                                                                                                                                                                                                                                                                                                                                                            STORMWATER DRAINAGE
                                                                                                                                                                                                                                                                                                                                                                                            LONGSECTIONS
                                                                                                                                                                                                                                                                                                                                                                                            2 OF 2
                                                                                                                                                                                                                                                                                                                                                                                          PROJECT NO.       DRAWING NO.   STATUS

                                                                                                                                                                                                                                                                                                                                                                                             21011          C36           OPW
                                                                                                                                                                                                                                                                                                                                                                                          DRAWN             DESIGNED      SCALE         ISSUE

                                                                                                                                                                                                                                                                                                                                                                                              BRP             BRP            NTS         A

Page 35

                                          6002                                                                                                                                              OP WORKS
                                                                                                                                                                                                      ISSUE




                      6451




                                                                                                                  6451
                                                              6451
Unit 3 Parking Space             Unit 7 Parking Space                          Unit 5 Parking Space
Representative of Units 1 to 4   Representative of U6 to U7




                                                                                                                                                                              03/11/21   UPDATED DETAILS                 -    BRP
                                                                                                                                                                              08/07/21   ISSUED FOR OP WORKS             -    BRP
                                                                                                                                                                              02/07/21   ISSUED FOR OP WORKS             -    MVP
                                                                                                                                                                               DATE              REVISION               MARK CHK
                                                                                                                                                                              PROJECT ENGINEER



                                                                                                      TURNING PATH NOTES
                                                                                                      1.   TURNING CIRCLES SHOWN USING A B99 VEHICLE AS DEFINED BY AS2890.1
                                                                                                           PARKING FACILITIES - OFF STREET CAR PARKING.
                                                                                                      2.   REFER TO ARCHITECTURAL PLANS FOR FULL DETAILS OF DRIVEWAY AISLE
                                                                                                           AND PARKING AREA DIMENSIONS.
                                                                                                      3.   REFER TO ARCHITECTURAL PLANS FOR WHEEL STOP AND BOLLARD DETAILS     E [email protected]
                                                                                                           WHERE NECESSARY
                                                                                                                                                                               A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                                               P +61 7 5211 1003
                                                                                                                                                                              CLIENT

                                                                                                                   5.20
                                                                                                                                                                                4CD DEVELOPMENTS
                                                                                                                                                                              PROJECT

                                                                     SETBACK                                                                                                     THE BELVEDERE ON PEARL
                                                                                                                     3.05   0.95
                                                                                                                                                                                 5 PEARL STREET, COOROY
                                                                                                                 B99 Vehicle (Realistic min radius) (2004)
                                                                                                                 Overall Length                              5.200m
                                                                                                                 Overall Width                               1.940m
                                                                                                                 Overall Body Height                         1.878m           TITLE
                                                                                                                 Min Body Ground Clearance                   0.272m
                                                                                                                 Track Width                                 1.840m
                                                                                                                 Lock-to-lock time
                                                                                                                 Curb to Curb Turning Radius
                                                                                                                                                             4.00s
                                                                                                                                                             6.250m             TURNING PATH ANALYSIS


                                                                                                                                                                              PROJECT NO.      DRAWING NO.     STATUS

Unit 11 Parking Space            Visitor 1 Parking Space                                                                                                                         21011          C40            OPW
Representative of U8 to U11
                                                                                                                                                                              DRAWN            DESIGNED        SCALE         ISSUE

                                                                                                                                                                                  MVP            BRP              NTS         C

Page 36

                                          Example ESC Defect Documentation
                                                 Template




                                                                                               Page 22 of 26
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 37

  Date defect       Defect description           Cause of defect        Proposal to              Defect              Repair implemented
   identified                                                          mitigate cause          repair date




                                                                                                                                          Page 23 of 26

P +61 7 5211 1003                  A 37 Mary St, Noosaville Qld 4566                    E [email protected]                        recorconsulting.com

Page 38

                    Ecosol Litter Basket Technical Specification




                                                                                      Page 24 of 26
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 39

                      Ecosol™ Litter Basket
                      Technical Specification




                  environmentally engineered
                           for a better future




  URBAN       ®

ASSET SOLUTIONS

Page 40

                  CONTENTS
                  1.0 Introduction
                  1.1 How and Why the Ecosol™ Litter Basket Works

                  2.0 Ecosol™ Litter Basket Credentials

                  3.0 Warranty And Life Expectancy

                  4.0 Key Features And Benefits

                  4.0 Key Dimensions

                  6.0 Collection And Removal Efficiencies

                   6.1 Particle Size Distribution Collection Efficiency
                   6.2 Laboratory Testing Collection Efficiency Sigmoidal Regression Lines
                   6.3 Field Testing Particle Size Distribution Data
                   6.4 Summary Product Collection Efficiency Data
                   6.5 Product Options

                  7.0 MUSIC Modelling Guidelines

                  8.0 Monitoring

                  9.0 Cleaning And Maintenance Procedures

                  10.0 Applications And Configurations

                  11.0 Turnkey Service

                  12.0 Accreditation

                  13.0 Supplier Technical Product Contact Details

                  Appendix 1 – Ecosol™ Litter Basket Essential Information Form

                  Appendix 2 - References




  URBAN       ®

ASSET SOLUTIONS
    Page 1

Page 41

1.0 Introduction
Increasingly stringent environmental best management practice requires planners
and developers to apply a fit-for-purpose treatment train approach to stormwater
treatment to achieve today’s water quality objectives (WQOs). An integral element
to any good WSUD design is primary treatment or pre-screening of stormwater
flows to remove coarse sediment and gross pollutants prior to downstream
secondary or tertiary treatment systems such as bio retention filters or wetlands.

The Ecosol™ Litter Basket provides effective primary treatment of stormwater
flows at point of source. For many years the Ecosol™ Litter Basket has been seen
as the industry standard for at-source filtration with its effectiveness proven over
time both in the field and under strict laboratory conditions.



                                                                                       The system has been designed to
                                                                                       provided robust and durable cost
                                                                                       effective at-source primary treatment
                                                                                       system that captures and retains solid
                                                                                       pollutants at drainage entry points.

                                                                                       In developing this innovative stormwater
                                                                                       treatment system careful consideration
                                                                                       has been given to durability, longevity,
                                                                                       cost and maintainability. Key
                                                                                       commercial technical features include:

                                                                                         • low visual impact and energy
                                                                                           footprint;
                                                                                         • designed hydraulics with proven
                                                                                           performance and longevity;
                                                                                         • scalable design; and
                                                                                         • cost effective maintenance regime.

                                                                                       This technical manual describes the
                                                                                       operation and performance characteristics
                                                                                       of the system.




                                                                                                     URBAN             ®

                                                                                                  ASSET SOLUTIONS
                                                                                                        Page 2

Page 42

                                             1.1 How And Why The Ecosol™
                                             Litter Basket Works
                                             The Ecosol™ Litter Basket captures
                                             pollutants at drainage entry points and
                                             consists of a capture basket and an
                                             overflow by-pass flap(s). The basket is
                                             fitted below the invert of the gutter and
                                             inside the drainage inlet pit and
                                             importantly does not obstruct flow in
                                             the outlet pipe. Solid pollutants enter
                                             the Ecosol™ Litter Basket with the
                                             stormwater from roadside or other
                                             run-off areas, such as car parks. The
                                             incoming flow and the pollutants
                                             aquaplane across the flap(s) into the
                                             capture basket. The filtered stormwater
                                             then passes into the drainage network
                                             without any head/hydraulic loss through
                                             the unit.




As the basket approaches 90% full, the
by-pass flap(s) begins to open in
response to the incoming flow. Once
the basket is 100% full the pressure of
the incoming flow forces open the by-
pass flap(s), allowing the excess flow, to
enter the drainage system through the
by-pass openings. This effectively
eliminates the likelihood of flooding, a
common fault with other at-source
systems. Even when in by-pass, the
captured pollutants are not remobilised
and are retained in the capture basket.




            URBAN            ®

        ASSET SOLUTIONS
               Page 3

Page 43

2.0 Ecosol™ Litter Basket Credentials

Ecosol has commissioned a range of tests to confirm not only product performance
but also to help with further research and development work. In 1996, the
University of South Australia, a National Australian Testing Authority (NATA)-approved
testing body, tested the Ecosol™ Litter Basket. Its full-size Roadway Surface
Drainage Rig was used to carry out a series of tests in two stages on the Ecosol™
Litter Basket. These tests measured the capture performance of the unit in both
on-grade and sag situations for a range of flows containing full-size, real-life solid
pollutants. The testing confirmed the unit’s ability to capture 97% of pollutants
greater than the filtration mesh size.

The testing also focused on determining whether the unit had any hydraulic impact
on the flows entering the pit. It found that the Ecosol™ Litter Basket did not
reduce the pit’s inlet capacity, a key benefit, especially as the unit is often installed
in road side entry pits where any level of flooding would be unacceptable. The
Ecosol™ Litter Basket also has a by-pass overflow that effectively eliminates the
risk of flooding.

In 2012 Ecosol engaged the University of Adelaide (ENGTEST The school of civil,
environmental and mining engineering) to undertake further independently laboratory
hydraulic and capture efficiency testing on the improved Ecosol™ Litter Basket design.
Additional they also undertook a comprehensive peer review of all prior and current
Ecosol™ Litter Basket field and laboratory testing reports to comprehensively
determine its performance specification. Reference – “Performance Review of
the Ecosol™ Litter Basket at- source solid pollutant filter (report dated 9 May 2013).




                                              3.0 Warranty And Life Expectancy

                                              The Ecosol™ Litter Basket has a one- year warranty covering all components and
                                              workmanship. Urban Asset Solutions Pty Ltd will rectify any defects that fall within
                                              the warranty period. The warranty does not cover damage caused by vandalism
                                              and may be invalidated by inappropriate cleaning procedures or where the unit is
                                              not cleaned within the recommended frequency. The Ecosol™ Litter Basket is
                                              designed to meet strict engineering guidelines and manufacturers guarantees and is
                                              one of the most durable at-source treatment systems available. The stainless steel
                                              components have a life expectancy of 15 years while the filtration bag has a life
                                              expectancy of 5 years providing appropriate maintenance practices are employed.




                                                                                                        URBAN            ®

                                                                                                    ASSET SOLUTIONS
                                                                                                          Page 4

Page 44

                                          4.0 Key Features And Benefits
                                          The Ecosol™ Litter Basket captures and retains a range of pollutants at entry points
                                          to the drainage network. Easily installed into most types of side entry pits, also
                                          known as gully pits or catch-pits, it retains more than 97% of pollutants greater than
                                          600µm and in the field it has been found to collect much smaller particles, including
                                          fine sediments.

                                          For many years the Ecosol™ Litter Basket has been seen as the industry standard
                                          for at-source filtration with its effectiveness proven over time both in the field and
                                          under strict laboratory conditions. Consisting of a capture basket, reusable liner,
                                          and overflow bypass flap(s) the Ecosol™ Litter Basket is fitted below the invert of
                                          the gutter inside the drainage pit and, importantly, does not obstruct flow into the
                                          outlet pipe. The liner is easily removed and emptied during maintenance and
                                          comes in a range of filtration fabric sizes from 100µm to 3000µm, depending on the
                                          site requirements.


Key Features                      Benefits

                                  • Minimal head/hydraulic loss
Hydraulics                        • Does not affect stormwater inlet capacity
                                  • Treats 100% of incoming flow

                                  • Unique by-pass overflow eliminates flooding risk
                                  • More than 97% of solid pollutants > 600μm
Pollutant Capture and Retention
                                  • Significant amounts of sediment and more than 40% TSS
                                  • No remobilisation of captured pollutants

                                  • Different sizes of filter media available for targeted pollutant capture
Design                            • Able to be retro-fitted into existing pits or supplied in its own pit
                                  • Easily installed
                                  • Dry storage of pollution thereby reducing risk of toxic fermentation
Cleaning and Maintenance
                                  • Pollutants not handled during cleaning
                                  • Re-usable filter liner is easily removed for manual cleaning
Environmental Impact              • Reduces sedimentation build-up
                                  • Visually unobtrusive




         URBAN              ®

      ASSET SOLUTIONS
               Page 5

Page 45

5.0 Key Dimensions

The Ecosol™ Litter Basket can be fitted to new and existing side entry pits (whether
single, double, or triple in size), including those with non-standard inlets, outlets,
and junctions. The table below shows the approximate dimensions and holding
capacities for the most typical Ecosol™ Litter Basket applications. Holding
capacities, treatable flow rates and by-pass capacities vary dependent on the
site-specifics.


                                                                              Holding Capacity                                        Static
   Stormwater Inlet Pit                       Dimensions                                              Treatable Flow      By- pass
                                                                            (typical basket depth                                    Head in
       Description                         (Length x Width)3                                            Rate (L/s)2       Capacity
                                                                                  450mm)1                                            By-pass

                                                                                                    200µm       1.5mm
                                 Pit                       Litter Basket            (m3)
                                                                                                     mesh        mesh
                                                                                                                            L/s          mm

         Drainway             600 x 595                        600 x 445            0.120            53           106       110          150
                              600 x 600                        600 x 450            0.121            53           106       110          150
  Single Grated Kerb Inlet
                              900 x 750                        900 x 450            0.182            83           167       215          150
        (with Lintel)
                              900 x 900                        900 x 600            0.243            83           167       215          150
                              1200 x 600                   2 x 600 x 450            0.243            103          212       220          150
 Double Grated Kerb Inlet     1200 x 900                   2 x 600 x 600            0.324            103          212       430          150
      (with Lintel)           1800 x 600                   2 x 900 x 450            0.364            106          220       230          150
                              1800 x 900                   2 x 900 x 600            0.496            106          220       440          150
                              600 x 660                        600 x 450            0.121            53           106       110          150
   Single Side Kerb Inlet
                              900 x 750                        900 x 450            0.182            83           167       215          150
  (with Lintel - no grate)
                              900 x 900                        900 x 600            0.243            83           167       215          150
                              1200 x 600                   2 x 600 x 450            0.243            103          212       220          150
   Double Side Kerb Inlet     1200 x 900                   2 x 600 x 600            0.324            106          220       430          150
   (with Lintel - no grate)   1800 x 600                   2 x 900 x 450            0.364            106          220       230          150
                              1800 x 900                   2 x 900 x 600            0.486            106          220       440          150
                              600 x 600                        600 x 450            0.121            53           106       110          150
     Grated Field Inlet
                              900 x 750                        900 x 450            0.182            83           167       215          150
     (no Kerb or Lintel)
                              900 x 900                        900 x 600            0.243            83           167       215          150
                                600                            437 x 437            0.085            54           108       120          150
                                 750                           558 x 558            0.140            92           184       172          150
       Circular Inlet
                                 900                           680 x 680            0.208            103          212       225          150
                                1050                           801 x 801            0.228            103          212       225          150




                                                    ¹Holding capacities are largely determined by the existing inlet pit dimensions and
                                                    the outlet pipe diameter but typically ranges from 120 - 364Kg at 100% full.

                                                    2The TFR varies dependent on the size of the Litter Basket , mesh appetures and
                                                    percentage of fill for the individual baskets. For the purpose of providing indicative
                                                    TFR’s we have assumed a minimum 375mm diameter outlet and empty litter baskets.

                                                    3All Ecosol™ Litter Baskets installed in pits larger than 600mm in width are fitted with
                                                    flow plates, removable capture baskets, optional hydrocarbon socks and include
                                                    by-pass openings to cater for peak flow conditions.




                                                                                                                       URBAN         ®

                                                                                                               ASSET SOLUTIONS
                                                                                                                        Page 6

Page 46

                                            6.0 Collection And Removal Efficiencies

                                            Stormwater treatment is best when distributed across the catchment treating
                                            stormwater pollutants as close as possible to their point of source. The Ecosol™
                                            Litter Basket provides a cost effective and efficient solution at point of source
                                            and has the highest treatable flow rate of any comparable system. In order to
                                            determine a meaningful characterisation of the Ecosol™ Litter Basket collection
                                            efficiency, an extensive verification phase was undertaken by Avocet Consulting
                                            Pty Ltd, Ecosol and EngTest (The University of Adelaide). To best summarise
                                            the capture efficiency results of extensive product testing a regression of the data
                                            points using a sigmoidal regression curve was selected as it provided a conservative
                                            fit to the wide scatter of data collected. Refer to figures 1 & 2 for testing results.
                                            Table 1 summarises these results

6.1 Particle Size Distribution Collection Efficiency


                    Pollutant Capture Efficiency PSD

                                Capture                    Capture
      Sieve Size
                                Efficiency                 Efficiency
       (micron)
                            (200μm Filter Bag)        (1500μm Filter Bag)

      2000 - 6000                    97%                        97%

      600 - 2000                     97%                        77%

       200 - 600                     86%                        37%

        60 - 200                     35%                        8%

         20 - 60                      4%                        1%




Table 1 – Ecosol™ Litter Basket typical particle size distribution
results at designed Treatable Flow Rates.




            URBAN            ®

        ASSET SOLUTIONS
               Page 7

Page 47

6.2 Laboratory Testing Collection Efficiency Sigmoidal
Regression Lines

In 1996, the University of South Australia tested the Ecosol™ Litter Basket. These
tests measured the capture efficiencies of the unit in both on-grade and sag situations
for a range of flows containing full-size, real-life solid pollutants. In 2012 the
University of Adelaide (Engtest Civil, Environmental and Mining) completed further
measurements of the products capture efficiency at varying flow rates and compiled
comprehensive product performance report (Performance Review of the Ecosol™
Litter Basket) reviewing both past and present field and laboratory testing data.
The below graphs summarise this data.


                                                        100%


                                                        80%
                            Collection efficiency (%)




                                                        60%


                                                        40%


                                                        20%


                                                        0%
                                                               2      4       8       16      32       64       128      256     512     1024   2048   4096

                                                                                                   Particle size (microns)



                                                                   Figure 1 - Sigmoidal regression line for the Ecosol™ Litter Basket, with a 200 micron
                                                                   filtration bag indicating high capture efficiencies for a range of particle sizes.




                                                                                                                                 URBAN            ®

                                                                                                                               ASSET SOLUTIONS
                                                                                                                                       Page 8

Page 48

                                                                                                   6.2 Laboratory Testing Collection Efficiency Sigmoidal
                                                                                                   Regression Lines continued


                                                                                    100%


                                                                                     80%
                                                       Collection efficiency (%)




                                                                                     60%


                                                                                     40%


                                                                                     20%


                                                                                      0%
                                                                                              2             4           8        16              32           64       128      256    512   1024      2048        4096   8192   16384

                                                                                                                                                                   Particle size (microns)




                                                                                                   Figure 2 - Sigmoidal regression line for the Ecosol™ Litter Basket, with a 1500 micron
                                                                                                   filtration bag indicating high capture efficiencies for a range of particle sizes.

6.3 Field Testing Particle Size Distribution Data

                                                 Ecosol Litter Basket Particle Size Distribution
                  100
                  90
                  80
                  70
                                                                                                                                                                                             Parafield Gardens
      Passing %




                  60                                                                                                                                                                         (Residential) 1.5mm

                  50                                                                                                                                                                         Pooraka Pre Cast Factory
                                                                                                                                                                                             (Industrial) 0.200mm
                  40
                                                                                                                                                                                             Techport (Commercial)
                  30                                                                                                                                                                         0.200mm

                  20
                  10
                  0
                                                                                                                                        13.200




                                                                                                                                                                       26.500
                                                                                                                                                               19000
                                                                                                                                                      16000
                                                                                                    2.360
                                         0.300



                                                                                   0.600




                                                                                                                        6.700
                         0.075

                                 0.150



                                                     0.425



                                                                                           1.180



                                                                                                                4.750



                                                                                                                                9.500




                                                                                                   Sieve Size


Figure 3 - Field testing Particle size distribution data for three separate
product installations.




                  URBAN                          ®

            ASSET SOLUTIONS
                        Page 9

Page 49

6.4 Summary Product Collection Efficiency Data
In recent years modern Water Sensitive Urban Design (WSUD) objectives and
principles now applied to most urban development’s require more onerous water
quality objectives (WQOs) specifically targeting the removal of suspended solids,
nitrogen, phosphorus and heavy metals. The Ecosol™ Litter Basket is an integral
part of the treatment train providing essential pre-screening of stormwater flows,
and when used in conjunction with other treatment measures such as swales or
sand filters will achieve target water quality objectives.


                                                       Capture Efficiency (Up to)   Capture Efficiency (Up to)
     Performance Criteria1
                                                          (200µm Filter Bag)          (1500µm Filter Bag)

     Gross Pollutants (>600μm)                                   97%                          77%

     Total Suspended Solids (TSS) (20 - 600µm)                   41%                          15%

     Total Phosphorous (TP)                                      39%                          15%

     Total Nitrogen (TN)                                         11%                           4%

     Heavy Metals                                                6%                           2%

     Total Petroleum/Hydrocarbon                                 20%                           7%



1 Figures quoted are mean collection efficiency statistics based on available
product testing data. It is important to note that the water quality CE values are
indicative of potential field CEs given that Ecosol™ Litter Basket provides physical
screening and the removal of chemical constituents is therefore largely dependent
on the chemical composition of the particles and the bonding of these chemical
constituents to the surface of the particles.

                                                 6.5 Products Options
                                                 To enhance the product capture efficiencies other filter medias can be incorporated
                                                 into the design.

                                                 Hydrocarbon booms installed within the Ecosol™ Litter Basket will provide
                                                 additional protection against oil or fuel spills in wet conditions.


                                                 Reactive filtration media pillows installed at the base of the basket will provide
                                                 improved capture efficiencies for heavy metals, total nitrogen, total phosphorous,
                                                 turbidity and suspended solids.




                                                                                                                 URBAN     ®

                                                                                                             ASSET SOLUTIONS
                                                                                                                 Page 10

Page 50

                                             7.0 MUSIC Modelling Guidelines
                                             These guidelines provide instruction to the creation and application of a treatment
                                             node for the Ecosol™ Litter Basket for the Model for Urban Stormwater Improvement
                                             Conceptualisation (MUSIC). The Ecosol™ Litter Basket can be modelled in MUSIC
                                             using the Generic Treatment node to represent the results derived from independent
                                             laboratory testing and field testing by the University of South Australia and the
                                             University of Adelaide (ENGTEST The school of civil, environmental and mining
                                             engineering). The guidelines apply to the creation of the treatment node within
                                             MUSIC v6.0.4

                                             Insert a GPT treatment node into your model by selecting “GPT” under the treatment
                                             nodes menu. When the node is created the node properties dialog is displayed.
                                             There are several changes that need to be made in this dialog.

                                             • Adjust the text in the Location box to read "Ecosol™ Litter Basket" plus any other
                                               relevant information (200µm or 1500µm).
                                             • Adjust the low flow bypass to refect any flow (m3/sec) diverted away from the
                                               unit before treatment (usually zero).
                                             • Adjust the high flow bypass to reflect the treatable flow rate (TFR values are
                                               detailed in page 6) (L/Sec) any higher flows will bypass treatment

                                             NOTES: Can be used to describe assumptions or location of reduction values for
                                             authority approvals

Adjust the transfer function for each pollutant selecting the pollutant and editing
(right click on the function point)the input and output values on the graph below
to reflect the capture efficiencies (ce) of the treatment device. Table 2 provides the
input and output values for the Ecosol™ Litter Basket based on the use of a 200µm-
filter liner. Table 6 provides the input and output values for the Ecosol™ Litter Basket
based on the use of a standard 1500µm filter liner


                                                                Removal Rate           Entered Input       Entered Output
     Pollutant
                                                                    (%)                    Value                Value

     Total Suspended Solids (20 - 600μm)                              41                   1000                  590
     Total Phosphorus                                                 39                   1000                  610
     Total Nitrogen                                                   11                   1000                  890
     Gross Pollutants (>600µm)                                       97                    1000                  30
     Heavy Metals                                                     6                     n/a                  n/a
     Total Petroleum/Hydrocarbons                                     20                   n/a                   n/a



Table 2 - Ecosol™ Litter Basket - 200 µm Filter liner, input and output values.




            URBAN            ®

        ASSET SOLUTIONS
              Page 11

Page 51

7.0 MUSIC Modelling Guidelines Continued

                                                                Removal Rate           Entered Input     Entered Output
   Pollutant
                                                                    (%)                    Value              Value

   Total Suspended Solids (20 - 600μm)                                15                   1000                850
   Total Phosphorus                                                   15                   1000                850
   Total Nitrogen                                                     4                    1000                960
   Gross Pollutants (>600μm)                                          77                   1000                 230
   Heavy Metals                                                        2                    n/a                 n/a
   Total Petroleum/Hydrocarbons                                        7                    n/a                 n/a



Table 3 - Ecosol™ Litter Basket -1500 µm Filter liner, input and output values.

Once the transfer functions have been defined for each of the pollutants the node
has been fully defined. When completed the properties window can be closed by
clicking the “Finish” button.

For further assistance in sizing or specifying a system for your next project please
complete the form in Appendix 1 and forward to your local Urban Asset Solutions
Pty Ltd representative



                                             8.0 Monitoring
                                             Under normal weather and operating condition your Ecosol™ Litter Baskets
                                             should be checked a minimum of every two - three months depending on the
                                             quality and quantity of the inflow to the unit and immediately following a major
                                             storm event. Initially, Urban Asset Solutions Pty Ltd recommends that monitoring
                                             is undertaken monthly. Once the unit has been in operation for an extended period
                                             of time (say, 24 months) then the monitoring schedule can be adjusted to
                                             reflect the actual operating conditions specific to the catchment.




                                                                                                       URBAN          ®

                                                                                                  ASSET SOLUTIONS
                                                                                                       Page 12

Page 52

                                     9.0 Cleaning And Maintenance
                                     During the first two years of operation it is important to regularly monitor and
                                     maintain each unit to better determine long-term maintenance regimes. All elements
                                     within the Ecosol™ Litter Basket have been designed for easy safe and cost efficient
                                     cleaning by either manual basket removal or vacuum method. Please refer to the
                                     product maintenance guide for full cleaning and maintenance procedures.

                                     The figures in the table below give a broad guideline about the optimal catchment
                                     size,and the number of cleans required annually based on typical expected
                                     urban pollutant loads.



                                                                   Recommended cleaning frequency based on
                                             Optimal
                                            Catchment           optimal catchment sizes and typical pollutant loads
                                               Size                              (per annum)
                                               (Ha)
                                                                          Typical Developed Urban Catchment
                                             Up to 0.2                                     2
                                             Up to 0.3                                    2-3
                                              Up to 0.5                                   3-4




One of the ke y advantages of the Ecosol™ Litter Basket is that it can
be cleaned by vacuum method using street sweeping vehicles. This is safe
and cost efficient.




          URBAN         ®

       ASSET SOLUTIONS
           Page 13

Page 53

10.0 Applications And Configurations
The Ecosol™ Litter Basket is an at-source filtration system that is ideal for capturing
solid pollutants in a variety of locations but is especially effective in built-up areas,
so-called “hot spots” such as shopping precincts and restaurant strips.

The ability to retro-fit the Ecosol™ Litter Basket into existing pits means that
drainage lines serving pollutant-generating catchments, such as schools, shopping
precincts, and central business districts, can be targeted for treatment cost efficiently.




Shopping Centre                                                            Residential Development

                                               Treatment-train Approach

                                               As no one measure can treat all of the pollutants generated from a typical
                                               development a treatment-train approach to stormwater management is always
                                               preferable. This involves using a range of treatment measures, working together, to
                                               achieve improved water quality. The Ecosol™ Litter Basket operating as a
                                               pre-screening system in a treatment train provides essential primary treatment
                                               thereby enhancing the operating life of secondary and tertiary treatment systems.




                                                                                                        URBAN           ®

                                                                                                     ASSET SOLUTIONS
                                                                                                         Page 14

Page 54

                                            11.0 Turnkey Services

                                             Urban Asset Solutions Pty Ltd design and estimating staff provide a dedicated
                                             management approach towards your project. In addition all staff are capable of
                                             liaising with the client, the consulting engineer, the contractor, and all other interested
                                             third parties to achieve a successful outcome.

                                             Given the wide range of pit types, sizes, and configurations, Urban Asset Solutions Pty
                                             Ltd provide a complete turnkey service inclusive of site measure, manufacture and
                                             installation on-site to suit each individual stormwater inlet pit. This flexibility,
                                             when compared to other off-the-shelf, supply-only products, means the client can
                                             be assured of a unit that not only has proven performance but also one that is
                                             ideally suited to the particular needs of the site. The unit’s unique design enables
                                             it to maximise holding capacities for the many different types of pits without
                                             impeding on the hydraulic design characteristics of the inlet pit.

                                             Urban Asset Solutions Pty Ltd has a very competitive cleaning service. After each
                                             clean we provide a report detailing the volume and type of pollutants removed.
                                             We believe that it is in your best interests for Urban Asset Solutions Pty Ltd staff to
                                             clean and maintain the unit, not only because we are specialists, but also because
                                             proper monitoring and maintenance enhances the unit life significantly.

                                             Should you use another company to clean the unit, or undertake this work yourself,
                                             we request that it be conducted according to Urban Asset Solutions Pty Ltd
                                             specifications. Otherwise, you may invalidate your warranty, as damage caused by
                                             inappropriate cleaning procedures is not covered. The advantages of using Urban
                                             Asset Solutions Pty Ltd to clean and maintain your unit are that you get:

                                             • regular inspections of your unit;
                                             • a comprehensive cleaning service with removal and disposal of all captured pollutants;
                                             • a detailed report provided on completion of each clean;
                                             • trained and experienced staff; and remedial work completed, if required.
12.0 Accreditation

Urban Asset Solutions Pty Ltd is accredited to AS/NZS ISO 1400 (Environment)
and AS/NZS 9001 (Quality). Our commitment to continuously improving our
products and services is demonstrated by our ongoing accreditation for Quality and
Environmental Management. Urban Asset Solutions Pty Ltd is also committed to a
safe environment for its employees. We are fully third-party accredited to AS/NZS 4801.


13.0 Suppiler And Technical Product Contact Details

For any maintenance or technical product enquiries please contact:
Urban Asset Solutions Pty Ltd
Tel: 1300 706 624
Fax: 1300 706 634
Email: [email protected]



            URBAN            ®

        ASSET SOLUTIONS
              Page 15

Page 55

Appendix 1

Ecosol™ Litter Basket Essential Information Form
To ensure your system is appropriately designed for its intended application and meets local water
quality objectives it is essential that the following minimum information is provided:


                                                            Customer Details
 Asset Owner:                                                                    Asset ID:
 Unit Location :                                                                 UAS Ref:
 Date:                                   Time:                                   Product Code: Ecosol™ Litter Basket
 Inspected By:




                                                       Project and Site Information
 Project Name:
 Project Address:
 Type of Development/Catchment Type
 Pollutant Removal Targets (%):                               Gross Pollutants (>2000μm)
 Site Water Quality Objectives (WQO’s)                        Total Suspended Solids (20 – 2000μm)
                                                              Total Phosphorus
                                                              Total Nitrogen
                                                              Heavy Metals
                                                              Total Petroleum/ Hydrocarbon
                                                              Other
 Local Authority:
 Proposed Number of Ecosol™ Litter Baskets required:
 Inlet pit type & typical dimensions
 (e.g. Grated side entry pit 900 x 600mm)



 Other essential design or site relevant information




                                                  Please forward the above information for your next project to your local Urban
                                                  Asset Solutions Pty Ltd representative. On receipt Urban Asset Solutions Pty Ltd
                                                  will model and design the most appropriately sized system to suit your application
                                                  to assist you achieve the project Water Sensitive Urban design objectives.
                                                  Email: [email protected]
                                                  Fax: 1300 706 634




                                                                                                                  URBAN      ®

                                                                                                              ASSET SOLUTIONS
                                                                                                                   Page 16

Page 56

                  Appendix 2

                  References

                  Dr. F.P Nejad, Dr.A. Zecchin, Dr.M Lambert (2013) - Performance Review of the Ecosol
                  Litter Basket at-source solid pollutant filter - School of Civil Environmental and
                  Mining Engineering. The University of Adelaide.

                  Prof J.R. Argue, D Pezzaniti (1996) Evaluation of the RSF 100 and RSF 200 Gross Pollutant
                  Traps - Full scale laboratory testing on the performance of the Ecosol Litter Basket
                  on sag and grade test utilising the road surface drainage test rig – Urban Water
                  Resources Centre, University of South Australia.

                  Prof J.R. Argue, D Pezzaniti (1996) Evaluation of the RSF 100 Gross Pollutant Trap –
                  Stage 2 - Full scale laboratory testing on the performance of the Ecosol Litter Basket
                  on sag and grade test utilising the road surface drainage test rig – Urban Water
                  Resources Centre, University of South Australia.

                  Dr.A Wallace (2003) Hydraulic and Strength review of the RSF 100 pollutant traps
                  (Ecosol Litter Basket) primary stormwater filter -Avocet Consulting Pty Ltd.

                  Dr.A Wallace (2012) Experimental determination of collection efficiency of Ecosol
                  Litter Basket primary stormwater filter - Avocet Consulting Pty Ltd.

                  A Attwood (2011) Physical and Chemical Assessment of Gross Pollutants Captured
                  in Ecosol Stormwater Retention Products, Field sampling and analysis at three
                  active site installations - LabSA Pty Ltd.

                  Upper Parramatta River Catchment Trust (2000) Stormwater Pit Pollutant Trap
                  Monitoring – Maintenance and monitoring of Stormwater Pit Pollutant Traps.
                  www. uprct.nsw.gov.au/cleanstreams.

                  M.Liebman, M.Brown, E. Garraway, C.Jones (2004) Kiama CBD’s stormwater treatment
                  and reuse project – Storm Consulting Pty Ltd “Kiama Municipal Council”.

                  J.Chrispin (2003) Assessing Different At-Source Stormwater Treatment Devices in
                  Hobart – Sullivans Cove and Brooker Highway Performance Trials – Hobart City Council.

                  J. Lewis (2002) Effectiveness of Stormwater Litter Traps for Syringe and Litter
                  Removal for Melbourne Water Corporation – Cooperative Research Centre for
                  Catchment Hydrology.

                  I. Jackson (2002) Stormwater Quality Improvement Project Monitoring report June
                  2001 – January 2002 At-Source RSF 100 Solid Pollutant Filters – Great Lakes Council.

                  A.Macklin (2012) Ecosol Litter Basket Water Quality Testing- Filtration Basket Capture
                  Efficiency, Laboratory testing and analysis of pollutant retention and chemical
                  composition using various filter basket medias - Ecosol Pty Ltd.

                  N.Watson (2005) Performance Report Ecosol RSF 100 Basket Installations Tauranga
                  New Zealand – Cleaning maintenance and monitoring report of litter basket
                  installation in the Tauranga City Council CBD – Ecosol (NZ) Wastewater Filtration
                  Systems Pty Ltd.




  URBAN       ®

ASSET SOLUTIONS
   Page 17

Page 57

                                                                       Urban Asset Solutions Pty Ltd
                                                                                ABN 73 627 354 830
                                                                           Telephone: 1300 706 624
                                                                                  Fax: 1300 706 634
                                                           Website: www.urbanassetsolutions.com.au




©Urban Asset Solutions Pty Ltd ABN 73 627 354 830 - 2020
This document is copyright. No part may be reproduced,
stored in a retrieval system, or transmitted in any form
or by any means, electronic, mechanical photocopying,
recording or otherwise without prior written permission
of Urban Asset Solutions Pty Ltd.




       URBAN                                  ®

ASSET SOLUTIONS

Page 58

                              Bioretention Inspection Checklist




                                                                                      Page 25 of 26
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 59

                           BIORETENTION SWALE MAINTENANCE CHECKLIST
                                                      3 to 6      Date of
Inspection Frequency:
                                                      monthly     Visit:
Location:
Description:
Site Visit by:
INSPECTION ITEMS                                             Y       N       ACTION REQUIRED (DETAILS)
Sediment accumulation at inflow points?
Litter within swale?
Erosion at inlet or other key structures?
Traffic damage present?
Vegetation condition satisfactory (density,
weeds etc)?
Replanting required?
Mowing required?
Clogging of drainage points?
Evidence of ponding?
Set down from kerb still present?
Damage/vandalism to structures?
Surface clogging visible?
Drainage system inspected?
Remulching of trees and shrubs required?
Soil additives or amendments required?
Pruning and/ or removal of dead or diseased
vegetation required?
Resetting of system required?
                                                     COMMENTS




                                                                                                          Page 26 of 26
   P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566             E [email protected]   recorconsulting.com

Page 60

a

G

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 4 - SWMP.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.