Council archive · source document
Att 4 - SWMP · MCU21/0117
The collected run-off will be conveyed to the south-east of the site into a new stormwater
line to be constructed within the Pearl Street road reserve. The new stormwater line will
connect into the council owned 1350mm diameter pipeline located to the east of the
development in front of Lot 0 SP 260162.
A stormwater drainage line will be installed along the southwestern boundary with Lot 1 on
RP153798 with inlet pits to collect the surface run-off from the upstream catchments and
divert it around the site directly to the discharge point from the site. Similarly, a slotted drain
will be installed across the driveway at the property boundary to intercept upstream flows
and convey them directly to the discharge point from the site.
The roof and allotment drainage system for the proposed site shall be designed to comply
with:
1. Noosa Shire Council Planning Scheme Policy (PSP) - Engineering Design Standards
– Roads, drainage and earthworks;
2. The Queensland Urban Drainage Manual (QUDM), and;
3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.
2.3.2 Developed Stormwater Catchments
Figure 2.6 – Proposed Catchments Plan
Page 6 of 26
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 4 - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.