Figure 4.5 - Ecosol Litter Basket Pollutant Removal Efficiencies
4.2.1.1. Bioretention Areas
Two 12.5m² bioretention areas are to be provided within the development to capture and
treat surface run-off from road areas as well as overflows from attenuation tanks. The
bioretention areas are modelled in accordance with the Water by Design MUSIC Guidelines
2018 with the node configuration for one of the areas shown below in Figure 4.6 –
Bioretention Node details.
Page 16 of 26
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 4 - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.