Council archive · source document
Att 4 - SWMP · MCU21/0117
proposed stormwater treatments, the development will reduce the quantity of stormwater
pollutants by more than 90% of gross pollutants, 80% of total suspended solids, 60% total
phosphorous and 45% total nitrogen, exceeding the pollutant reduction targets required
for the site.
By implementing the proposed stormwater solution, it is considered that stormwater layout
proposed will minimise any adverse impacts to the downstream environment and
neighbouring properties arising from the stormwater run-off while also meeting the
stormwater quality targets required for the development.
Page 20 of 26
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 4 - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.