Council archive · source document
Att 4 - SWMP · MCU21/0117
OP WORKS THE BELVEDERE ON PEARL ISSUE 5 PEARL STREET, COOROY QLD 4562 CIVIL WORKS NOTE: 7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PAVEMENTS. PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE CONTRACTOR FAIL TO REQUEST AN INSPECTION, 8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR WORKS TO BE INSPECTED TO THE SATISFACTION OF RECOR. ANY INSPECTIONS REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL. BY THE CONTRACTOR. 9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL a. PRESTART WORKPLACE HEALTH AND SAFETY REQUIREMENTS. b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT 10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE AND EROSION CONTROL MEASURES UNSUITABLE GROUND PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES c. SIDE AND CUT OFF DRAINS NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED. e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON SITE BOUNDARY f. STORMWATER STRUCTURE BASE SLABS THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE g. SEWER RETICULATION WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE. h. WATER RETICULATION 12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT i. PAVEMENT SUBGRADE REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO j. PAVEMENT REINFORCING NOTE COUNCILS ADAC REQUIREMENTS. k. PAVEMENT PRIOR TO SEALING (PRESEAL) 13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT APPROVALS. l. RETAINING WALL FOOTING REINFORCING 14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES CONSTRUCTION. o. PRACTICAL COMPLETION 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS COMMENCING ON SITE. p. ON MAINTENANCE 16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS q. OFF MAINTENANCE AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O. r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER 17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING DEVELOPMENT APPROVAL) PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE OF ANY WORKS ON SITE. RELEVANT TO THEIR CERTIFICATION SCHEME 18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND GENERAL NOTES BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH 1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE AS DIRECTED. 2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY CONSULTANTS/CONTRACTORS DRAWINGS: LOCALITY PLAN SETOUT THE WORKS. SURVEYOR: SKYLINE SURVEYORS NOT TO SCALE 3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE ARCHITECT: ZEST BUILDING GROUP CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED HYDRAULICS: PLUMBING DESIGN & DRAFTING STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. 03/11/21 UPDATED DETAILS - MVP STRUCTURAL: RECOR 02/07/21 ISSUED FOR OP WORKS - MVP 4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF LANDSCAPE: ZEST BUILDING DESIGN DATE REVISION MARK CHK THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT 20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: PROJECT ENGINEER THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR. ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS 5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS ASSOCIATED WITH IMPLEMENTATION OF THE TMP. SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH THE FOLLOWING COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE LOCAL AUTHORITY APPROVALS: T.B.A CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF 22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY APPROVALS BY COUNCIL. DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. E [email protected] 23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING A 37 MARY ST NOOSAVILLE, QLD PROPOSED WORKS. BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD P +61 7 5211 1003 6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND RESERVE, PARKS/OPENSPACE, EASEMENTS. CLIENT SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN 24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES DRAWINGS AND APPROVALS ON SITE AT ALL TIMES. 4CD DEVELOPMENTS CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL 25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN PROJECT DIRECTION PRIOR TO COMMENCING CIVIL WORKS. ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE (2013). THE BELVEDERE ON PEARL 5 PEARL STREET, COOROY TITLE COVER SHEET AND LOCALITY PLAN PROJECT NO. DRAWING NO. STATUS 21011 C01 OPW DRAWN DESIGNED SCALE ISSUE MVP BRP 1:200 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 4 - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.