Council archive · source document
Att 4 - SWMP · MCU21/0117
TABLE OF CONTENTS
PROJECT INFORMATION .................................................................................................................................... I
TABLE OF CONTENTS ........................................................................................................................................ II
1. INTRODUCTION ............................................................................................................................................ 1
2. SITE DETAILS ................................................................................................................................................. 1
2. 1. E X I S T I N G S I T E D E S C R I P T I O N ................................................................................ 1
2. 2. E X I S T I N G D R A I N A G E P A T T E R N S ............................................................................. 3
2.2.1 Existing Stormwater Infrastructure .................................................................................................... 3
2.2.1.1. Roof Drainage ......................................................................................................................... 3
2.2.1.1. Upstream Catchments............................................................................................................. 4
2.2.1 Existing Stormwater Catchments ....................................................................................................... 5
2. 3. P R O P O S E D D E V E L O P M E N T D R A I N A G E P A T T E R N .......................................................... 5
2.3.1 Stormwater Concept .......................................................................................................................... 5
2.3.2 Developed Stormwater Catchments................................................................................................... 6
2. 4. F L O O D C O N S I D E R A T I O N S .................................................................................... 7
3. STORMWATER QUANTITY ............................................................................................................................ 7
3. 1. D I S C H A R G E T O P E A R L S T R E E T ............................................................................... 7
4. STORMWATER QUALITY ............................................................................................................................... 9
4. 1. C O N S T R U C T I O N P H A S E ...................................................................................... 10
4.1.1 Erosion and Sediment Control Measures ......................................................................................... 10
4.1.2 Erosion and Sediment Control Monitoring ....................................................................................... 11
4. 2. O P E R A T I O N A L ................................................................................................ 11
4.2.1 MUSIC Modelling ............................................................................................................................. 12
4.2.1.1. Rainwater Tanks ................................................................................................................... 13
4.2.1.1. Pit Inserts .............................................................................................................................. 15
4.2.1.1. Bioretention Areas ................................................................................................................ 16
4.2.1.2. MUSIC modelling results ....................................................................................................... 17
4.2.2 Operational Maintenance ................................................................................................................ 18
5. CONCLUSION .............................................................................................................................................. 19
PROPOSED DEVELOPMENT PLANS ........................................................................................ 21
EXAMPLE ESC DEFECT DOCUMENTATION TEMPLATE ............................................................ 22
ECOSOL LITTER BASKET TECHNICAL SPECIFICATION .............................................................. 24
BIORETENTION INSPECTION CHECKLIST ................................................................................ 25
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 4 - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.