Decision Notice - RAL21 0035 [As Published]
ENVIRONMENTAL MANAGEMENT
Land Rehabilitation
19. A vegetation protection covenant must be registered against the title of the property over the
land area identified as riparian protection on the western side of the waterway as well as the
10 metre wide rehabilitation area on the eastern side of the waterway pursuant to Section
97A of the Land Title Act 1994. The covenant document and a survey plan must be submitted
to Council for endorsement prior to lodgement with the relevant titles authority for registration
of title. The covenant document must:
a. incorporate the requirements of this Decision Notice
b. include Noosa Council as Covenantee.
c. reference Queensland Land Title Registry Standard Terms Document No. 715597513
Works within Protected Land
20. The following works must be undertaken within the covenant area in accordance with the
conditions of this approval prior to the submission of the sealing of the survey plan:
a. Control of pest plants listed in Planning Scheme Policy 2 Landscaping and Councils
Biosecurity Plan 2020 pest plants listed in Schedule 1 part 3, Schedule 2 and non -
scheduled invasive species;
b. Removal of any structures, debris or materials foreign to a natural environment
c. Rehabilitation and restoration to achieve the equivalent floristic composition of the pre
clearing undisturbed regional ecosystem as per the rehabilitation areas .
d. The planting of canopy species with local provenance in Regional Ecosystem 12.3.14a,
including threatened Eucalyptus conglomerata. The trees must be planted at a ratio of
1 tree per every 10m².
The works must be undertaken in accordance with an Operational Works approval.
21. The land area 30 metres west of the defined waterway bank and 10 metres east of the
defined bank of the waterway must be rehabilitated and revegetated and removed of all weed
species listed in the following standards and legislation:
a. Control of pest plants as listed in Planning Scheme Policy 2 Landscaping and Council’s
Biosecurity Plan 2020 pest plants listed in Schedule 1 part 3, Schedule 2 and Non-
scheduled invasive species; and
b. The works must be undertaken in accordance with an Operational Works approval.
*(Refer to Advisory Note)
22. If a provision included in the covenant document is requisitioned or refused registration by
the relevant titles authority, a substitute provision must be included in the document which
as nearly as practicable addresses the objective sought by the requisitioned or refused
provision. The wording of the substitute provision must be agreed by Council.
Fencing to Protected Land
23. A permanent fence must be constructed along the entire length of the western and eastern
covenant boundaries. The fence must be constructed in accordance with an Operational
Works approval and must be to the following specifications:
a. Min 1.2 metres high
b. allow adequate clearance at ground level for local macropods
c. not include any use of barbed wire or similar materials
d. be constructed of fire proof materials
Page 4 of 9
Document Set ID: 22524862
Version: 3, Version Date: 31/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.