Skip to the record
Accept no substitutions.

Council archive · source document

0015A7C8.001

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1897                                                                    IDAS Assessment Checklist, Version 19.0, 2 March 2007 ~
                   Integration of land use and public ~   |22. The application involves: (tick the applicable box’es)—
                  “transport Reese      to Guide 23, schedule   LJ {i) a material change of use assessable against the planning scheme for a purpose
                   SA ofthe IPA’ & schedule 2 of the IP Requlation.    mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
                  { Unless you answered “none of tha above’, the       schedule.                                      ,
                  * application triggers referral to QT as a     :                               :                                                                  .
                   concurrence agency."    +          :        CJ (ii) reconfiguring a fot—                                                                              :
                   B00 1           ee               ,                   (F(a)     on land that is completely or partly within a public transport corridor, and the
                   Be                          mo                ,                total number of lots increases;                      ;
                   eo          .        o            OF           .     [J] (b)   on land that is completely or partly within a future public transport corridor or
                  po:                              ,                              an airport's public safely area;                .
                  ‘                 .          oO                       [1(c)     on land that is within 400m of a public passenger transport facility or a future         .
                  .      sO          Coe                                          public passenger transport facility, and the total site area is 5000m2 or greater;
                   b      a        a            Soe                     (J (d)    for a residential purpose within the 25 ANEF contour for an airport;
                  j     an         wo, uo                               [J (e}    for a residential purpose resulting in 100 or more allotments.
                                                   °            C (iii) operational work assessable against the planning scheme, but not associated with a
                   :          wm              .       .                material change of use mentioned in {i} above or reconfiguring a lot mentioned in {ii)
                   foe                          Oe                     above, on land that—
                           ar                                           (1 {a) _ is completely or partly within a public transport corridor or a future public
                   po                           m4,                               transport corridor;
                         ee                                             (J (b)    will result in work that encroaches into an airport's operational airspace.
                        es                           |_         Biv)none ofthe above.                                                                         _.
  @                “Rallway safety and efficiency)     =| 23.  The application involves: (tick the applicable bow/es)—
                  : brane Phe ere ete 1 Gue Za seu              (J (i) a material change of use assessable against the planning scheme for a purpose
                   reer             tanned   Beaulation                mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
                    Untess you answered: “none of the above”, the
                   * application triggers referral to QT as a          schedule.                          .                                                                    .
                   Concurrence agency. ©                        LJ (ii) reconfiguring a fot—
                   CO                                  ,                [J (a)    on land that is completely or partly within a future public transport corridor,
                   -                                                         ;    future railway land or a railway tunnel easement;
                                        oe           *                  (7) (b)  - on land that is within 400m of a Citytrain passenger railway station or a future
                   Do,                         ,    .                             Citytrain passenger railway station, and the total site area is 5000m?2 or
                   '     a                     re                                 greater;
                         ee                     Loo                     [J (c)    on iand that abuts rail corridor land, commercial corridor land or future railway
                   ,              oo                :                             land, and the total number of lots increases;
                   Se                  me                               (1 (4)    on land that abuts rail corridor land, commercial corridor land or future raitway
                       a            —                                             land and an easement abutting the corridor or future railway land is created;
                   ‘        .      Hs                                   (1 {e)    on land that is completely or partly within 100m of, and abutting an approach
                   '                    .                                         to, a railway level crossing, and the total number of lots increases;
                   ‘        *                      ce                   C1 (f}    for a residential purpose resulting in 100 or more allotments.
                   ‘        .                _—_                [_] (iii) operational work assessable against the planning scheme, but not associated with a
                       :                                               material change of use mentioned in (i) above or reconfiguring a lot mentioned in {ii}
                   mo                 oy                               above, involving extracting, excavating or filling greater than 50m3, on land that—
                                       .      So                        (1 (a)    is completely or partly within rail corridor land or commercial corridor land, and
: ©                  .       ,            ae                                      the work is not for rail transport infrastructure or other rail infrastructure;
                        ,     ;                 So,                      [J (b)   is completely or partly within future railway land, or a raibway tunnel easement;
                        Cy               mo                              [1 (c)   abuts rail corridor land, commercial corridor land or future railway land, and
                       ST                               an                        the work is within 25m of the railway boundary.
                   .                 oo             -          (5 (iv) none of the above.                            ;
                    Moonie to Brisbane pipeline           24.  The application involves the easement for the construction or operation of the Moonie to
                   . For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
                   inbee yr answered “wone of he abows'’, the  “Li{i) a material change of use assessable against the planning scheme and not associated
               .    application triggers referral tothe holder of      with reconfiguring a lot, and any structure or work will be located wholly or partly inthe
                   ‘ pipeline licence No 1 issued under the Petroleum   easement.
              :    } ae currently Santos QNT Pty ttd, for       C (ii) reconfiguring alot
                   ao            oo,                 :          L] (iii) operational work assessable against the planning scheme, that is filling, excavation,
                   3        °       ‘         2                         compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
           ,                     ae           7                        work is located wholly or partly in the easement.
             rr re                                        *     BRI (iv) none of the above,                                                                   a

                                                                                             Page B

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015A7C8.001.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.