INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 19.0, 2 March 2007 ~
Integration of land use and public ~ |22. The application involves: (tick the applicable box’es)—
“transport Reese to Guide 23, schedule LJ {i) a material change of use assessable against the planning scheme for a purpose
SA ofthe IPA’ & schedule 2 of the IP Requlation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
{ Unless you answered “none of tha above’, the schedule. ,
* application triggers referral to QT as a : : .
concurrence agency." + : CJ (ii) reconfiguring a fot— :
B00 1 ee , (F(a) on land that is completely or partly within a public transport corridor, and the
Be mo , total number of lots increases; ;
eo . o OF . [J] (b) on land that is completely or partly within a future public transport corridor or
po: , an airport's public safely area; .
‘ . oO [1(c) on land that is within 400m of a public passenger transport facility or a future .
. sO Coe public passenger transport facility, and the total site area is 5000m2 or greater;
b a a Soe (J (d) for a residential purpose within the 25 ANEF contour for an airport;
j an wo, uo [J (e} for a residential purpose resulting in 100 or more allotments.
° C (iii) operational work assessable against the planning scheme, but not associated with a
: wm . . material change of use mentioned in {i} above or reconfiguring a lot mentioned in {ii)
foe Oe above, on land that—
ar (1 {a) _ is completely or partly within a public transport corridor or a future public
po m4, transport corridor;
ee (J (b) will result in work that encroaches into an airport's operational airspace.
es |_ Biv)none ofthe above. _.
@ “Rallway safety and efficiency) =| 23. The application involves: (tick the applicable bow/es)—
: brane Phe ere ete 1 Gue Za seu (J (i) a material change of use assessable against the planning scheme for a purpose
reer tanned Beaulation mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Untess you answered: “none of the above”, the
* application triggers referral to QT as a schedule. . .
Concurrence agency. © LJ (ii) reconfiguring a fot—
CO , [J (a) on land that is completely or partly within a future public transport corridor,
- ; future railway land or a railway tunnel easement;
oe * (7) (b) - on land that is within 400m of a Citytrain passenger railway station or a future
Do, , . Citytrain passenger railway station, and the total site area is 5000m?2 or
' a re greater;
ee Loo [J (c) on iand that abuts rail corridor land, commercial corridor land or future railway
, oo : land, and the total number of lots increases;
Se me (1 (4) on land that abuts rail corridor land, commercial corridor land or future raitway
a — land and an easement abutting the corridor or future railway land is created;
‘ . Hs (1 {e) on land that is completely or partly within 100m of, and abutting an approach
' . to, a railway level crossing, and the total number of lots increases;
‘ * ce C1 (f} for a residential purpose resulting in 100 or more allotments.
‘ . _—_ [_] (iii) operational work assessable against the planning scheme, but not associated with a
: material change of use mentioned in (i) above or reconfiguring a lot mentioned in {ii}
mo oy above, involving extracting, excavating or filling greater than 50m3, on land that—
. So (1 (a) is completely or partly within rail corridor land or commercial corridor land, and
: © . , ae the work is not for rail transport infrastructure or other rail infrastructure;
, ; So, [J (b) is completely or partly within future railway land, or a raibway tunnel easement;
Cy mo [1 (c) abuts rail corridor land, commercial corridor land or future railway land, and
ST an the work is within 25m of the railway boundary.
. oo - (5 (iv) none of the above. ;
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
. For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
inbee yr answered “wone of he abows'’, the “Li{i) a material change of use assessable against the planning scheme and not associated
. application triggers referral tothe holder of with reconfiguring a lot, and any structure or work will be located wholly or partly inthe
‘ pipeline licence No 1 issued under the Petroleum easement.
: } ae currently Santos QNT Pty ttd, for C (ii) reconfiguring alot
ao oo, : L] (iii) operational work assessable against the planning scheme, that is filling, excavation,
3 ° ‘ 2 compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
, ae 7 work is located wholly or partly in the easement.
rr re * BRI (iv) none of the above, a
Page BSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A7C8.001.pdfRelated documentPublic source context ↗
07/0743 - Op Works - Landscaping, Carparking & Access , S/Water [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.