Skip to the record
Accept no imitations.

Council archive · source document

0015A7C8.001

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

af                                                                                                                                                                                          3
we          "                  in                                                              t                                                                        ke                       '
                   INTEGRATED PLANNING ACT 1997                                                                              IDAS Assessment Checklist, Version 19.0, 2 March 2007               "
                ’ | Whether particular buildings maybe | 16.       An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a              |
                   occupied for residential purposes                referral to the local government as the concurrence agency.                                      .
                    2 ERI
                   For more information go to schedule 2 table, 1 of the ‘                                                                                .
                   Ebeuiaten CE                     :                                                                                                                        OF
                   Assessment period: 15 days. No response is a                 .
                   deemed refusal. SRK:                                                                          oe
                   Design and siting          .               17.   An application may trigger referrat to the local government as the concurrence agency if the building work
                   For more information go to schedile 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.    |  _
                   PReavlation. 7!                            18.   An application may trigger referral to the locat government as the concurrence agency if the building work
                   Assessment period 5 days. No response is a       does not comply with the qualitative statement for building clearance and site cover.            :
                   deamed-refusal.              :             19.   An application may trigger referral to the local government as the concurrence agency if the building work
                            ots    vee                              does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland          .
                          -        ie,       _                ____  Development Code, part 11 or 12. _
                   Fire safety in particular budget           20.   An application may trigger referral to the local government as the concurrence agency to determine the
                   accommodation buildings                          building will comply with the fire safety standard under the Building Act 1975 when the building work has
    ,              -For more information go to schedule 2 tabla 1 of the been completed.                                                :
                   IP. Regulation                                 :                                                :
                   “Assessment period 15 days. Noresponselsa =
                   deemed refusal                .
                   ‘Higher risk personal appearance        . | 21,  An application may trigger referral to the tocal government as the concurrence agency to determine if the
                   services       .                        .        building work
                   For more Information go to schedule 2 table 1 of the « — complies with the performance criteria of the Queensland Development code part 15; and
                  IP Reaulation and the QDC pant 15.               ¢ — the work does not comply with an acceptable solution stated in the part.
                   t Assessment period 15 days. No response isa                              .
                   deemed refusal.                us
@                  Building work for residential service      22.   An application for buitding work for premises in which residential care service under the Residential
                   For more information go'to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
                   {PReaulation ang the QDC part 20.                referral to the local government as the concurrence agency.
                   F Assessment period 15 days. Noresponseisa                                               .                                           .
                   deemed refusal.
 .                 Building work for removal or               23.   An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
                   rebiilding                                       referral to the loca! government as the concurrence agency.
                   ! For mara information go to schedule 2 table { of.the
                   IP Regulation.
                   | Assessment period 5 days. No response is a
          .        deemed refusal:                   ;
                   Building work for rainwater tank In     _  |24.  An application may trigger'teferral to the focal government as the concurrence agency to determine if the
                   designated rainwater tank area                   building work or structure compties with the relevant performance criteria if -
                   | For mora Information go to schedute 2 table 1 of the ¢ Under the Building Regulation 2006, a rainwater tank is proposed to be instalted as part of relevant  .
                  IP Regulation and the QOC part 25:       -            building work, in a designated rainwater tank area; and
                   Assessment period 15 days. Noresponselsa | *     e   Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
                   deemed.refusal,                        =             solution for a relevant performance criteria.       ;

                                                                                                     Page 15

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015A7C8.001.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.