Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

3 Crusoe Crt Driveway Crossover Application

From the archive 3 CRUSOE CRT DRIVEWAY CROSSOVER APPLICATION 30.06.20.zip, inside Operational Works Application OPW20/0105 - 3 Crusoe Crt Castaways Beach. File date in the archive: 2020-06-30 07:45.

of 2

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                             29.06.20




NON-STANDARD VEHICLE CROSSOVER APPLICATION.



To whom it may concern,



I am applying for a non-standard crossover approval for 3 Crusoe Court, Castaways Beach.



The subject site has an approved (RAB16/0138) Carport structure built to boundary. The current
crossover unfortunately does not allow for proper access and as a result the crossover we now sort
requires to be 6m in width at the kerb and channel location and then flow through to the existing
Carport structure at 6m. wide (Ref part site plan / proposed cross over for extent and location).

Addition to this approval located within the proposed cross over there is an existing stormwater
collection channel and S.W pit. To achieve practical and safe vehicle access we as ask council to
consider the ramping of the existing collection channel with a WG20 stormwater grated trafficable
ramp or similar (ref details attached to application). This I believe is a council supported solution for
this type of scenario? The proposed solution is vehicle accessible and has been engineered
accordingly, it allows for bicycle access.

This solution is designed to allow for the stormwater collection channel to remain in functional.

In addition, I note to council there is a secondary collection channel and stormwater pit located
approx. 30m downstream along the same side of the Court as a secondary collection point.

It should be noted also Crusoe Court is finished in a permeable paved surface which independently
collects a good deal of its own rainwater run off without having to rely completely on the traditional
kerb and channel stormwater road solution.

In conclusion we seek an approval based on the above-mentioned.

This will allow safe entry and exiting from our Car Port structure which is built to boundary. It will
also negate the current scenario of our vehicles having to mount the collection channel on entry and
exiting which puts demand and within time potential damage to the structure.
Log in to download the original file

3 CRUSOE CRT DRIVEWAY CROSSOVER APPLICATION.pdf · 132 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

I thank you for your consideration and If you have any questions, please feel free to contact me at
any time.




Image of existing conditions with area in question circled red.


Kind Regards,




Michael Broeren
p. (07) 5471 2721
m. 0422 969 645
e. [email protected]
w. www.mdesign.com.au

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.